|
| 1 | Material and labour for preparation of old decorated surfaces of walls (plastered) by brooming down with coirwire brushing, scraping down smoke soot, moulds, moss and efflorescent salts and trading oil and greasy spots and finally cleaning with sand paper complete all as specified and directed. Note - Work will be carried out up to 5th storey |
| 2 | Material and labour for complete removal of old existing treatment of internal or external surfaces of wall, complete all as specified and directed.Note - Work will be carried out up to 5th storey |
| 3 | Material and labour for preparation of old decorated surfaces of Ceilling (plastered) by brooming down with coirwire brushing, scraping down smoke soot, moulds, moss and efflorescent salts and trading oil and greasy spots and finally cleaning with sand paper,complete all as specified and directed.Note - Work will be carried out up to 5th storey |
| 4 | Material and labour for one coat of oil bound distemper in any tint on Ceillingon already prepared surfaces,complete all as specified and directed. Note - Work will be carried out up to 5th storey |
| 5 | Material and labour for one coat of cement base paint on already prepared surfaces of walls,complete all as specified and directed. Note- Work will be carried out up to 5th storey |
| 6 | Material and labour forone coat of oil bound distemper in any tint on already prepared surfaces, complete all as specified and directed. Note - Work will be carried out up to 5th storey |
| 7 | Material and labour for two coat of damp proof paint in any tint on wall over a coat of primeron already prepared surfaces of walls ,complete all as specified and directed.Note- Work will be carried out up to 5th storey |
| 8 | Material and labour for preparation of old surface andapplying one coat offloor paint on old surface of floors,complete all as specified and directed. |
| 9 | Material and labour for one coat weather coat exerior emulsion paint in any tint on already prepared surfaces of walls, complete all as specified and directed.Note- Work will be carried out up to 5th storey |
| 10 | Material and labour for applying interior grade wall care putty 1 - 1.5 mm thick to make the surface smooth complete all as specified and directed .Note - Work will be carried out up to 5th storey |
| 11 | Material and labour fortwo coat of white wash on walls on already prepared surfaces, complete all as specified and directed.Note - Work will be carried out up to 5th storey |
| 12 | Material and labour fortwo coats of cement base paint on already prepared surfaces of walls, complete all as specified and directed. Note- Work will be carried out up to 5th storey |
| 13 | Material and labour for applying two coats of oil bound distemper on old putty surfaces of walls, complete all as specified and directed. Note- Work will be carried out up to 5th storey |
| 14 | Material and labour for twocoat of weather coat exerior emulsion paint any tint on already prepared surfaces of walls,complete all as specified and directed. Note- Work will be carried out up to 5th storey |
| 15 | Material and labourfor preparing of old painted wood or wood based surfaces of any description over 10 cm width or girth and applying one coat of synthetic enamel paints, complete all asspecified & directed. Note- Work will be carried out up to 5th storey |
| 16 | Material and labourfor preparing of old painted steel and iron surfaces of any description over 10 cm width or girth not otherwise described and applying one coat of synthetic enamel paint, complete all as specified and directed.Note- Work will be carried out up to 5th storey |
| 17 | Removing /cutting trees vegetation, digging out roots filling holes on building wall/roof/cajja etc at any position and make in good with cement concret 1:2:4 type B-0complete all as specified and directed. Note- Work will be carried out up to 5th storey |
| 18 | Material and labour forrendering 15mm thick in cement mortar 1:4 on fair faces of brick/concrete surfaces of wall finishedeven and smooth without using extra cement including taking down the existing plastercomplete all as specified and directed.Note- Work will be carried out up to 5th storey |
| 19 | Material and labour forrendering 15 mm thickin Cement Mortar1:6 onfair faces of brick & concrete surfaces and finished evenand fair (without using extra cement) including taking down the existing plaster complete all as specified and directed.Note - Work will be carried out up to 5th storey |
| 20 | Material and labourfor 10 mm thick rendering on ceiling surface in cement mortar 1:3surface finished even and smooth without using extra cement including taking down the existing plaster complete all as specified and directed.Note - Work will be carried out up to 5th storey |
| 21 | Material and labourfor red brick tiles (clay tiles) of 10-12 mm thick size 15 x 5 to 7.5 cm as in vertical surfaces such as wall dado\"s etc over 15 mm thock rendering CM (1:4) set and jointed in neat cement slurry and pointed in coloured cement to match the surfaces of tile complete all as specified and directed. The work will be carried upto tripple storey building the rate of scaffolding included for this item also and including dismantling of old tiles complete and removing debries outside the premises as directed by Engr in charge |
| 22 | Supply and fixin repair 75 mm bore UPVC (SWR) pipe 4 Kilogramf/cm2 single socketed in any length with rubber ring, fixed on wall complete all as specified and directed. |
| 23 | Supply and fixin repair 110 mm bore UPVC (SWR) pipe 4 Kilogramf/cm2 single socketed in any length with rubber ring, fixed on wall, complete all as specified and directed. |
| 24 | Supply and fixin repairUPVC (SWR) bend, 75 mm bore\" complete all as specified and directed. |
| 25 | Supply and fixin repairUPVC (SWR) junction single, (Single T) equal or unequal, 75 mm bore with oval access door, complete all as specified and directed. |
| 26 | Supply and fixin repairUPVC (SWR) bend, 110 mm bore\" complete all as specified and directed. |
| 27 | Supply and fixin repairUPVC (SWR) junction single, (Single T) equal or unequal, 110 mm bore with oval access door complete all as specified and directed. |
| 28 | Material and labourcleaning of water storage tank 500/1000 Ltr capacity mechanically using pressure pump with disinfectant chemical including cleaning & removing all scale & dirt etc from existing tanks, mouths of circulating pipes and outer surface of any description & washing down in themanner for the following capacitycomplete all as specified and directed. |
| 29 | Material and labour for preparation of newly plastered surface of wall and applying two coat of oil bound distemper over a coat of primer complete all as specified and directed. |
| 30 | Material and labour for preparation of newly plastered surface of wall and applying two coat of cement base paint over a coat of primer complete all as specified and directed. |
| 31 | Material and labour for preparation of newly plastered surface of ceiling and applying two coat of oil bound distemper, complete all as specified and directed. |