| 1 | SURFACE DRESSING : Surface dressing n exc 15 cm deep in soft loose soil along with Site Clearance ofServiceable Materials:- Any vegetable, earth, sand, gravel, stone, debris of brickwork, concrete, masonry, MS frame work, iron, steel, pipelines etc., |
| 2 | DISMANTLING : Dismantling of following existing structure of any description and nature at any place and position as per site in-charge including shifting/cleaning the materials from site. Complete in all respect as directed by EIC. Asbestos cement (corrugated, semi-corrugated, etc.) sheets in roof coverings |
| 3 | DISMANTLING : Dismantling of following existing structure of any description and nature at any place and position as per site in-charge including shifting/cleaning the materials from site. Complete in all respect as directed by EIC. Plain or corrugated steel sheeting, any gauge, thickness, including Nainital or similar pattern roof coverings |
| 4 | DISMANTLING : Dismantling of following existing structure of any description and nature at any place and position as per site in-charge including shifting/cleaning the materials from site. Complete in all respect as directed by EIC.Taking Down & removal to store Wooden frame/ skylight of size exc. 1.50 sqm & n exc. 4.0Sqm including for architraves, soffits, linings, window boards, etc. |
| 5 | DISMANTLING : Dismantling of following existing structure of any description and nature at any place and position as per site in-charge including shifting/cleaning the materials from site. Complete in all respect as directed by EIC.Taking Down & removal to store Chowkhats or frames of Doors & windows exc 1.5 sq. m but n exc 4 sq. m each with shutters (without taking off shutters from the frame) |
| 6 | DISMANTLING : Dismantling of following existing structure of any description and nature at any place and position as per site in-charge including shifting/cleaning the materials from site. Complete in all respect as directed by EIC.Demolition of Brickwork masonry, built in cement mortar including all quoins, arches, pillars, etc, |
| 7 | DISMANTLING : Dismantling of following existing structure of any description and nature at any place and position as per site in-charge including shifting/cleaning the materials from site. Complete in all respect as directed by EIC. Removing cement mortarfrom and cleaning bricks, stacking for measurement including all extra handling and removal and disposing off rubbish. (180X430=77400) |
| 8 | DISMANTLING : Dismantling of following existing structure of any description and nature at any place and position as per site in-charge including shifting/cleaning the materials from site. Complete in all respect as directed by EIC.Dismantling Reinforced cement concrete in Roofs, floors (other than ground floors), beams, staircases, landing, chajjas and similar suspended work including reinforcement cut as required to facilitate demolition |
| 9 | DISMANTLING : Dismantling of following existing structure of any description and nature at any place and position as per site in-charge including shifting/cleaning the materials from site. Complete in all respect as directed by EIC. Dismantling mild steel work of any description not otherwise provided for including unbolting, dismantling framed work into two or more portable parts |
| 10 | DISMANTLING : Dismantling of following existing structure of any description and nature at any place and position as per site in-charge including shifting/cleaning the materials from site. Complete in all respect as directed by EIC.Separating, scraping and cleaning of reinforcement |
| 11 | DISMANTLING : Dismantling of following existing structure of any description and nature at any place and position as per site in-charge including shifting/cleaning the materials from site. Complete in all respect as directed by EIC. Dismantling boarding, any description, fixed in any position fixed with screws |
| 12 | EXCAVATION IN TRENCH :Excavating in trenchs, n exc 1.5metre wide n exc 1.5m deep & getting out in hard & dense soil. & deposited within 100 metre. |
| 13 | CHIPPING SURFACES : Roughening surfaces of old concrete floor by picking, sweeping clean and washing down with water to remove dust, etc. |
| 14 | JACKETING OF COLUMN :Providing and laying in position site batched cement concrete for reinforced cement concrete work; using coarse aggregate 20mm stone chips and fine aggregate derived from natural sources, Portland Pozzolana / Ordinary Portland /Portland Slag cement, admixtures in recommended proportions as per IS: 9103 to accelerate / retard setting of concrete, to improve durability and workability without impairing strength; including of laying, curing, carriage for all leads; as per direction of the engineer-in-charge; upto Plinth Level. Concrete of M25 grade (1:1:2) with minimum cement content of 330 kg /cum |
| 15 | FORMWORK : Formwork to sides of foundations footings, raft beams, floor slab& column etc. Rough finished square, rectangular concrete surfaces. |
| 16 | FILLING & LEVELING : Filling in including returning, spreading, levelling, watering & well ramming in layers as required. |
| 17 | FILLING & LEVELING : Selecting stone, brick, concrete, etc. suitable for handpacking, filling of hardcore from excavated spoil heaps, removing and piling in convenient places within 50m of spoil heaps, etc. and raising or lowering to required level (measured after selection) |
| 18 | FILLING & LEVELING : Hardcore of broken stone or boulders of gauge n exc. 63 mm, deposited, spread and levelled in layers n exc. 15 cm thick, watered and rammed to a true surface |
| 19 | FILLING & LEVELING : Sand filling under floors or in foundations including watering and consolidation |
| 20 | SCAFFOLDING : Providing and fixing double scaffolding system (cup lock type) onthe exterior side ofbuilding/ structure, upto 25 metre height, above ground level, including additional rows of scaffolding in stepped manner as per requirement of site, made with 40mm dia M.S. tube, placed 1.5 metre centre to centre, horizontal & vertical tubes joint with cup & lock system with M.S. Tubes, M.S. tube challis, M.S. clamps and staircase system in the scaffolding for working platform etc. and maintaining it in a serviceable condition for execution of work of cleaning and/ or pointing and/ or applying chemical and removing it thereafter. The scaffolding system shall be stiffened with bracings, runners, connecting with the building etc, wherever required, if feasible, for inspection of work at required locations with essential safety features for the workmen etc., complete as per directions and approval of Engineer-in-charge |
| 21 | PCC IN FLOOR : Providing PCC type B-1, 1:2:4 (20 mm aggregate) in foundation filling Floor, Mass Concrete.M&L |
| 22 | RCC : Reinforced cement concrete type B-1, 1:2:4 (20 mm aggregate) (nominal mix) in Slabs supported on walls, beams and columns in floors, roofs, landings, balconies, canopies, deck slabs and in shelves and the like |
| 23 | STEEL REINFORCEMENT : TMT bars 10mm dia and over, cut to length, bent to shape required, including cranking, bending spirally for hooping for columns, hooking ends and binding with and including mild steel wire (annealed) not less than 0.9mm dia or securing with clips. |
| 24 | BRICK WORKS : Brickwork with subclass ‘B’ bricks, straight or curved on plan exc 6m mean radius built in cement morter 1:4 |
| 25 | PLASTERING :Renderingcement plaster 12 mm thick on fair faces of brick work or concrete surfaces.: cement plaster 1:4. Rendering is to be finished even & smooth without using extra cement. |
| 26 | NET FINISHING EXTRA CEMENT : Rendering 10mm thick on fair faces of brick work or concrete surfaces in cement morter 1:4, including the additional thickness is provided as floating/setting coat. |
| 27 | ROOF SHEET : Supplying & fixing Pre-painted galvalume aluminium zinc coating GI based corrugated steel sheets 0.50 mm thick of any colour as in roof covering and cladding to wall, fixed with J/L hooks with EPDM washers to fix with existing structure. |
| 28 | ROOF SHEET : supplying & fixing pre-painted galvalume aluminium zinc coating GI basedplain steel sheets 0.50 mm thick of any colourbending to required shape & size as in ridges, cladding to walls fixed withfixed with J/L hooks with EPDM washers to fix with existing structure. |
| 29 | ROOF SHEET : Supplying & fixing 2mm thick fibre glass reinforced translucent corrugated sheeting with two corrugation side lap fixed with coach screw or in J hooks and washer in roof, north light etc. Make: Everest, Charminar, Glassfibro. M&L |
| 30 | MS FRAME WORK : Supplying & fixing MS frame work confirming to Fe-410 Grade A & Fe-290 Grade E-165 allow for cutting to dead length where required, notching, drilling, fitting, riveting and/or welding or connecting with bolts and nuts (including rivets or bolts and nuts), also include for drilling the members for site connections providing and fitting angle cleats, fish plates, gusset plates etc., also for wedging, plumbing, truing up and fixing complete. structural steel is painted one shop coat of zinc chromate primer paint (including preparation of surface) at Contractor’sworkshop before fabrication. MS frame work for roof trusses, purlins including distance pieces, cleats etc. complete as per directions including dismantling & removing to store the existing old damaged MS work, is required. |
| 31 | MS FRAME WORK : Supplying & fixing MS frame work confirming to Fe-410 Grade A & Fe-290 Grade E-165 allow for cutting to dead length where required, notching, drilling, fitting, riveting and/or welding or connecting with bolts and nuts (including rivets or bolts and nuts), also include for drilling the members for site connections providing and fitting angle cleats, fish plates, gusset plates etc., also for wedging, plumbing, truing up and fixing complete. structural steel is painted one shop coat of zinc chromate primer paint (including preparation of surface) at Contractor’s workshop before fabrication. Stairs (framed) including stringers, treades, landing, balusters, hand rails etc. including cleats, brackets, etc. complete |
| 32 | MS FRAME WORK : Supplying & fixing MS frame work confirming to Fe-410 Grade A & Fe-290 Grade E-165 allow for cutting to dead length where required, notching, drilling, fitting, riveting and/or welding or connecting with bolts and nuts (including rivets or bolts and nuts), also include for drilling the members for site connections providing and fitting angle cleats, fish plates, gusset plates etc., also for wedging, plumbing, truing up and fixing complete. structural steel is painted one shop coat of zinc chromate primer paint (including preparation of surface) at Contractor’s workshop before fabrication. Plate girder or single stanchions, built up of one beam or channel section with flange plates, caps, bases. splices, angle brackets,cleats and other connections |
| 33 | MS FRAME WORK : Supplying & fixing MS frame work confirming to Fe-410 Grade A & Fe-290 Grade E-165 allow for cutting to dead length where required, notching, drilling, fitting, riveting and/or welding or connecting with bolts and nuts (including rivets or bolts and nuts), also include for drilling the members for site connections providing and fitting angle cleats, fish plates, gusset plates etc., also for wedging, plumbing, truing up and fixing complete. structural steel is painted one shop coat of zinc chromate primer paint (including preparation of surface) at Contractor’s workshop before fabrication.providing and fixing wind ties of 40x 6 mm flat iron section. |
| 34 | PAINTING : Supplying & applying 2 coats of synthetic enamel paint over a coat of red lead primer on steel surface after preparation of surface. |
| 35 | PAINTING : One coat Cement wash with Portland cement slurry to a smooth bodied opaque finish on newly plastered surface, Washing, rubbing down and stopping of distempered and painted surfacesDistempering with 1st quality acrylic distemper (ready mixed) having VOC content less than 50 gms/litre, of approved manufacturer, of required shade and colour complete, as per manufacturer\"s specification. Two coat |
| 36 | CLEANING OF VALLEY GUTTER & DOWN TAKE PIPES ETC : Taking down eaves gutters and rainwater pipes (any size or pattern), including all fittings, heads, shoes, bends, swan-necks,etc., including cleaning or refixing or removal to Store (measured overall as fixed along the centre line over fittings and accessories) |
| 37 | CLEANING OF VALLEY GUTTER & DOWN TAKE PIPES ETC :Providing and fixing on wall face unplasticised Rigid PVC rain waterpipes conforming to IS : 13592 Type A, including jointing with seal ring conforming to IS : 5382, leaving 10 mm gap for thermal expansion, (i) Single socketed pipes. Complete in all respect.160mm dia PVC pipe |
| 38 | CLEANING OF VALLEY GUTTER & DOWN TAKE PIPES ETC : 160 mm dia PVC bend |
| 39 | CLEANING OF VALLEY GUTTER & DOWN TAKE PIPES ETC :Providing and fixing on wall face unplasticised Rigid PVC rain waterpipes conforming to IS : 13592 Type A, including jointing with seal ring conforming to IS : 5382, leaving 10 mm gap for thermal expansion, (i) Single socketed pipes. Complete in all respect.supply & fixing in position MS ERW Pipe 100mm dia (Nipple) 300mm long |
| 40 | CLEANING OF VALLEY GUTTER & DOWN TAKE PIPES ETC :Providing and fixing on wall face unplasticised Rigid PVC rain waterpipes conforming to IS : 13592 Type A, including jointing with seal ring conforming to IS : 5382, leaving 10 mm gap for thermal expansion, (i) Single socketed pipes. Complete in all respect.Labour for Welding in Pipe thickness exceeding 6mm not exceeding 9mm 100mm Dia ID= 114mm ODCircumference 35.796 cm say 36cm= 3.60 10 running cm Total Joint 6 NosTotal Welding Length 21.6/ 10rcm |
| 41 | The dismantled materials will be contractor\"s property & deduction will be made on these materials. The contractor should visit the site before making quotation.CGI Sheet |
| 42 | The dismantled materials will be contractor\"s property & deduction will be made on these materials. The contractor should visit the site before making quotation.AC sheets |
| 43 | The dismantled materials will be contractor\"s property & deduction will be made on these materials. The contractor should visit the site before making quotation.Wooden frame skylight |