| 1 | Earth work excavation for foundation in all soils such as redearth ,hard stiff clay soil, stiff black cotton soil, hard redearth,shales, murrams, gravel,hard rock not requiring blasting ete complete.,For Foundation |
| 2 | Cement concrete 1:4:8 mix usin 40 mm HBGSmetal inculding cost and coveyance of all materials to site including labour for mixing ,laying,curing etc complete.,For Foundation |
| 3 | Supplying and fabrication,placing in position of mild steel or ribbed Tor steel grils for RCC works inculding cost of steel and binding wire etc., complete |
| 4 | Supplying and erection centering for sides and soffits inculding necessary supports and structingfor plain surfaces such as RCC Slab,Lintel,Beam coloum,sunshade etc complete., |
| 5 | Supplying and erection centering for sides and soffits inculding necessary supports and structingfor plain surfaces such as RCC Slab,Lintel,Beam coloum,sunshade etc complete., |
| 6 | Reinforced cement concrete 1:11/2:3 mix using 20 mmHBGSmetal inculding cost and coveyance of allmaterials to site including labour for mixing ,laying,curing etc complete., |
| 7 | Brick work with cement mortar 1:5 mix using II class bricksfor foundation and basement and superstructure inculding cost and conveyance of all materiales curing etc ,complete. |
| 8 | Filling the basement excavated earth other than sand including all labour charges etc., complete |
| 9 | Plastering with Cement Morter 1:3 mix 10 mm thick inculding cost and conveyanceof all materials to site and labour charges for curing etc |
| 10 | Plastering with Cement Morter 1:5 mix 12 mm thick inculding cost and conveyanceof all materials to site and labour charges for curing etc |
| 11 | Paving the Floor with scratch proof ceromic tiles of size 305x305x6mm including cost and conveyance of all materials to site and all labour charges etc complete |
| 12 | Brick jelly lime concrete using 20mm brick jelly with slacked lime in the ratio of 32:12.5 including cost andconveyance of all materials to site and all labour charges for mixing , laying ,and finishing etc complete for10 cum |
| 13 | Finishing the top of roof with one course of PRESSED TILES of size 23 cm X 23 cm X 2 cm laid in cement mortar 1:3 (One cement and three Sand) 12mm thick mixed with water proofing compound conforming to I.S. at 2% by weight. |
| 14 | Exterior Emulsion painting two coats with best approved quality and colourpaint over one coat of Base coat including cost and convyance of all materials to work site and labour charges etc., complete. |
| 15 | Supplying and fixingP.V.C rainwater down fall pipe of 110mm diawith necessary shoes, bends,& clamps etc., |
| 16 | Cement concrete 1:3:6 mix using 20mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing,laying and curing etc completefor 10 cum. |
| 17 | Cement concrete 1:2:4 mix using 20mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing,laying and curing etc completefor 10 cum. |