| 1 | Earth work in rough (borrow area) excavation for embankments in hard soil, morrum or highly weathered strata dry or moist, including laying in20 cm layers (before compaction) and breaking of clods, sorting of grass, pebbles etc.with initial lead of 250m and lift up to 1.5mincludingdressing, loading and un-loading wherever required complete in all respect. (Excluding charges for compaction and watering)BSR RD&PR 2024-25 A. Soft Soil |
| 2 | Compaction of earth or highly weathered strata by manually or plain roller. (density 90% of Proctor)(BSR WRD 2023 ) |
| 3 | Watering of earth including cost of carriage of water when source of water is beyond 1 Km but up to 5 Km extra per Km (BSR WRD 2023 ) |
| 4 | 15 to 30 cm hammered single stone pitching with all lift, with supply. |
| 5 | Morrum, building debris, lime, gravel, stone ballast less than 40 mm nominal size for various distance transportation including loading, unloading and stacking. (The length of the transport will be calculated from the nearest route and not by road) lead upto 3Km |
| 6 | Excavation by machine including loading, unloading, disposal and dressing of excavated earth within initial lead of 50m and lift up to 1.5m in dry or moist including dressing of excavated area, dewatering wherever required complete in all respect (SAM BSRRD&PR 2024-25) Hard soil |
| 7 | Cement concrete mix (1:4:8)well mixed and laid in position complete including all leads of all construction materials includingcuringand finishing having well gradedcrusher broken stone aggregate of maximum size upto 40mm (SAM BSRRD&PR 2024-25) |
| 8 | Cement concrete mix (1:5:10)well mixed and laid in position complete including all leads of all construction materials includingcuringand finishing having well gradedcrusher broken stone aggregate of maximum size upto 40mm includingwatering, loading and un-loading wherever required complete in all respect.(SAM BSRRD&PR 2024-25) |
| 9 | R.R. stone Masonry(using R. R. stones wherestones to be not less than 15 cm in size in any direction) for foundation includingall leads of all construction materials including curing etc. completein 1: 6 Cement Mortar (SAM BSRRD&PR 2024-25) |
| 10 | R.R. stone Kharnjain 1: 6 Cement Mortar and laid in position complete including all leads of all construction materials includingcuringand finishing(SAM BSRRD&PR 2024-25) |
| 11 | 50mm thick Cement concrete (1:2:4) M-15 well mixed and laid in position complete including all leads of all construction materials includingcuringand finishing having well gradedcrusher broken stone aggregate of maximum size upto 20mm, |
| 12 | 25 mm thick cement plaster on wall with1:4 ratio with joint scraping and regular leveling for 14 days (SAM BSRRD&PR 2024-25) |
| 13 | Flush or ruled pointing on stone masonry including racking of joints and curing etc. complete including all leads of all construction materials in mortar ratio (SAM BSRRD&PR 2024-25) |
| 14 | P/L stone slabs, filling with cement in 1:4 ratio with top and bottom joints with stone chips, 2.4 m. from 3.0m span (SAM BSRRD&PR 2024-25) |
| 15 | Leveling the excavated soil, in the Catchment area andpouring water and ramming with a rammer.(SAM BSRRD&PR 2024-25) |
| 16 | Unpolished rough kota stone / jaisalmeri stone should be leveled directly on top of 20 mm thick cement mortar 1:4 and joints should be filled with cement mortar 1:3 and flush tipped. |
| 17 | Supply and laying of HDPE Geomembrane 500 micron,excluding GST (Horticulture letter 4065-4144 Date 2023) |
| 18 | Laying, welding & testing of 1mm HDPE Liner (WRD BSR CH-V ITEM NO 45) |
| 19 | 150cm ऊंचाई की फेंसिंग लोहे का पोस्ट35X35X5mm के 3मी.दूरी से व 30cm जमीन में सीमेंटकंक्रीट 1:3:6(.30X.30X.60m)कोर्नर व प्रत्येक10वां पोस्ट को 35X35X5mm लोहेके पोस्ट से सपोर्ट करना,साथ में 4लाईनों में काला कांटेदारतार, 2पोस्ट के बीच जीआई. स्टेपल तार से बांधना व फिट करना सहित |विश्लेषण27 मी. लम्बाई फेंसिंग तक के लिए,मिट्टी खुदाई कार्य सहित(कंक्रीट 0.54 घमी.) |
| 20 | Earth work in excavation in foundation, trenches etc. including dressing of sides and ramming of bottoms, including getting out the excavated material, refilling after laying pipe/ foundation and disposal of surplus excavated material at a lead upto 50m suitable site as per direction of Engineer for following depths, below natural ground / Road top level. (SAM BSR RD&PR 2024-25), 2A |
| 21 | Gate and Yojna Disply Board of work details |
| 22 | Lumpsump fitting of iron door, inlet/outlet iron grill jaali, disply board and photograph / Yojna Disply Board |
| 23 | Sewan grass seeds sowing on ridge in 03 row |
| 24 | Sewan grass seeds |