Supply Of Materials For Construction Of Godown In Housanur Village Tp Guledagudda - Add Sundries Charges At 1 Percentage On Material Hos1,Transportation/Loading And Unloading Of Material/Lifting Of Material /Wastage/Unforeseen Charges/Miscellaneous Which Are Necessary During Execution.(Hos1),Add Sundries Charges At 1 Percentage On Labour (Hos1),Add Watering Charges At 1 Percentage On Labour (Hos1),Broken Stone Aggregate 40 Mm Size (Hos1),Broken Stone Aggregate 20 Mm Size (Hos1),Broken Stone Aggregate 12 Mm To 10 Mm Size (Hos1),Coarse Sand (Zone Iii)(Hos1),Portland Cement (Hos1),Mixer (Concrete)-1 Cum Capacity (Hos1),Add Watering Charges At 1 Percentage On Material (Hos1),Rubble Stones (Hos1),Bond Stone 20X20x45 Cm (Hos1),Mixer (Concrete Small Used In Culvert) (Hos1),Plasticizer / Super Plasticizer (Hos1),Hom Of Vibrator 0.71 Days (Hos1),Tmt Bars Fe 500 (Hos1),Binding Wire (Hos1),Jungle Wood Runners And Planks (Hos1),Silver Oak Or Equivalent Planks 38 Mm Thick (Hos1),Casurina Poles 100 - 150 Mm (Hos1),Ms Flat (Hos1),Bolts And Nuts (Hos1),Add Handling , Loading And Unloading At 2Percentage On Material (Hos1),Add Sundries Charges At 2 Percentage On Material (Hos1),Casurina Poles 75 - 100 Mm Dia (Hos1),Burnt Bricks Class 35 (Non Modular)(Hos1),Add Handling , Loading And Unloading At 1Percentage On Material (Hos1),Ms Pipes Of 80 Mm To 100 Mm Dia (Hos1),Rms Gusset Plate (Hos1),Corbon Electrodes (Hos1),Welder Grade I (Hos1),Hom Of Welding And Grinding Machine (Hos1),Add (Hos1),Mechanic Class Ii/Mechanic Hmp Grade I/Eme Grade (Hos1),Hom Of Cutting And Grinding Machine (Hos1),Tools And Plants At 2 Percentage On Material (Hos1),Unit Cost As Per The Specification (Hos1),M.S Rods (Hos1),Fitter Class I (Hos1),Add Hom Of Welding And Grinding Machine At 4 Percentage On Material (Hos1),Ready Mix Primer Paint (Ready Mix Red Lead Paint)(Hos1),Add Wire Brush, Fine Steel Wool, Putty, Sand Paper, At 3 Percentage On Cost Of Paint(Hos1),Painter Class I (Hos1),Add Providing And Removing Scaffolding At 3 Percentage On Labour (Hos1),Enamel Metal Paint (Hos1),Add Brush At 1Percentage On Cost Of Paint (Hos1),Mason Class I (With Tools) (Hos1),Dry Distemper (Hos1),Whitening (Hos1),Add Brush, Putty, Glue At 5 Percentage On Cost Of Paint (Hos1)