| 1 | CONSTRUCTION OF PDS Building @Near Library in Thachampattu Pt |
| 2 | Earth work excavation for foundation in all classes of soils and sub soil to full depthexcept in hard rock requiring blasting but inclusive of shoring struttingif required forthe sides of foundation. |
| 3 | Collection and supply of sandand filling in to the basement including cost and conveyanceto the siteand all labour charges for filling as per standard specifications |
| 4 | Cement concrete 1:4:8 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing,laying and curing etc complete |
| 5 | Cement concrete 1:1.5:3 using 20mm ISS HBG metal for all RCC item of works excluding cost of Rein forcement and fabricating charges, centering and shuttering but including |
| 6 | Brick work in CM 1:5 mix using country bricks ground moulded of size 83/4\"x41/4\"x21/4\" for the following including curing etc., complete complying with standard specifications. Rate for 10m3 |
| 7 | Walls Above Basement (Super Structure) |
| 8 | Supplying and fabrication of steel including cost and conveyance of bending to shape and tying in position and forming grills for all R.C.C works including cost and conveyance |
| 9 | Supplying and erecting centeringshuttering includingnecessary supportsforplane etc., complete. |
| 10 | Above GL |
| 11 | Floor finish with granolithic flooring in CC 1:2:4 mix using 10 to 12mm chipsfor 40mm thick including cost and conveyance of all materials and labours etc., complete |
| 12 | Paving the floor with scratch proof ceramic tiles of any colour and any size laid in CM 1:2, 20mm thick. And pointing with white cement 0.4 Kg per Sqm mixed with colouring pigment to suit the colour of the tiles including finishing the joints neatly complying with the standard specifications and as directed by the departmental officers. (The ceramic tiles should be got approved from the Departmental officers before execution). |
| 13 | Dadooing walls with Glazed tiles of any colour and any size laid in CM 1:2, 10mm thick. and pointing with white cement 0.4 Kg per sqm mixed with colouring pigment to siut the colour of the tiles including finishing the joints neatly complying with the standard specifications and as directed by the departmental officers. The Glazed tiles should be got approved from the Departmental officers before execution. |
| 14 | Plastering with cement mortar 1:5 mixto12mmthick including cost and conveyance of all materials to site and all labour charges etc |
| 15 | Plastering with cement mortar 1:3 mixto 10 mm thick including cost and conveyance of all materials to site and all labour charges etc complete |
| 16 | Plastering with cement mortar 1:4 mixto 20 mm thick including cost and conveyance of all materials to site and all labour charges etc complete |
| 17 | Finishing Top Roof with one Course Pressed Tiles including cost and conveyance of all materials to site and all labour charges etc complete |
| 18 | Supplying and applying oftwo coats with best approved putty 3mm thickincluding cost and conveyance of all materials to site and all labour charges etc complete |
| 19 | Distempering two coat using oil bound Distemper including cost of distemper and labour charges, etc, complete. |
| 20 | Exterior emulsion painting two coats with best approved quality and colour paint over one coat of base coat including cost and convyance of all materials to work site and labour charges etc. complete |
| 21 | Supplyingof steel doors, windows, ventilators etc., withbest approved best qualityetc., complete complying with standard specifications and as directed by the departmental officers. |
| 22 | Cost and Supply of Steel Door |
| 23 | Cost and Supply of Steel Door |
| 24 | Cost and Supply of Steel Window |
| 25 | Cost and Supply of Steel Vernlator |
| 26 | Cost and Supply ofRolling Shutter |
| 27 | Painting two coats over new iron works using ready mixed enamel paint including cost and conveyance of paint and all labour charges etc complete |
| 28 | Labour Charges for Fixing the Doors inculding all Charges etc.. |
| 29 | Labour Charges for Fixing theSteel Window inculding all Charges etc.. |
| 30 | Supplying & fixingwith cuddapah slabs 20-30mm thick for cup board including all cost and conveyance and all labour charges etc .comp. |
| 31 | Cost and supply of oriya type indian baby friendly water closed with \"p\" or \"s\" trap etc, complete (white) |
| 32 | Supply and Fixing of 15mm Dia Brass |
| 33 | Provision for Electrification Work all charges |
| 34 | Provision for Name Board etc., complete. |
| 35 | Provision for Photo charges |
| 36 | Providing CC Pavement 85m @Periya street to Pillaiyar Kovil street in Thachampattu Pt |
| 37 | Earth work excavation and depositing on bank with in initial lead of 10 m and initial lift of 2m in hard stiff clay, stiff black cotton soil, hard red earth,earth mixed with small sized boulders and hard gravelly soil as per SS 20B. |
| 38 | Cement concrete 1:4:8 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing etc complete. |
| 39 | Supplying and erecting centring for sides and suffits including supports and structing upto 3.29m height for plane surface in all cross bracting using MS sheets of size 90 x 60cm and 10kg stiffened with angle of size 25 x 25 x 3mm for boarding laid over silver oak joists os size 10 x 6.5mm at about 90cm C/C and supported by casuring props of 10cm 13cm dia at C/C etc., complete. |
| 40 | Cement concrete 1:2:4 mix using 20mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing etc complete. |
| 41 | FixingofName Board includingcost, painting, Lettering, installation etc. |
| 42 | Photographic charges for taking photos in various stages before execution, during execution and after execution |
| 43 | Provision for Bitumens Pad |
| 44 | GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column \"BB\" for all works in this package} |