Tender For Various Work Under Deposit Scheme And Other Related Work Against Sanctioned Packages In The Jurisdiction Of Edd-Talanagari, Aligarh - Cartage of followingpoles from Store centre or from any other place to the respective site of work through the Kachha Pacca roadincluding the work of its loading & unloading at the respective ends, also including the work of dragging etc. and also including the cost of labour, T&P carrier etc. required for proper completion of work. (Dist. 0 to 50 Kms.). 2 PCC/ST poles 8.5/11 Mtr. 3 Cartage of line material viz Cable,Conductor/ GI earth wire, Cross Arm, Angle, Channel, Insulator, Clamps, cable, Stone pad & other line material from Store centre or from any other place to the respective site of work through the Kachha Pacca road including the work of its loading & unloading at the respective end, also including the work of dragging etc. and also including the cost of labour, T&P carrier etc. required for proper completion of work. (Dist. 0 to 50 Kms.). 4 Erection of single support including complete H.T/L.T fittings as per RESPO manual and as per direction of Engineer incharge including the cost of labour, T & P and carrier etc. required for proper completion of work. 5 PCC/ST poles 8.5/11 Mtr. 6 Erection of double pole on following poles including the work of complete line as per RESPO norm manual and as per direction of Engineer Incharge including the cost of labour, T & P and carrier etc. required for proper completion of work. 7 PCC/ST poles 8.5/11 Mtr. 8 (a) Erection & Grouting of stay set including the work of nozzling etc. as per RESPO manual and also including the cost of arrangement of all grouting material, labour, T&P etc. required for proper completion of work. 9 (b)Providing and fixing of stay insulator. 10 Laying, sagging, stringing, binding and jumpering etc. of old line conductor on the newly erected pole as per RESPO manual and as per direction of supervising engineer, including the cost of arrangement of labour, T&P carrier etc. required for proper completion of work. 11 ACSR Weasal Conductor. 12 ACSR Dog Conductor. 13 ABC Conductor 3x50+1x35+1x16 Sq.mm./3x95+1x70+1x16 Sq.mm./ 3x120+1x95+1x16 Sq.mm. 14 Grouting of PCC/ST poles 8.5/11 Mtr. Long as per RESPO norms 15 Making the plinth of Steel poles. 16 Drilling and cutting of tee off channel, V cross arms, Top channel, cross bracing angle, MS garding angle, Dropper chanel, Stone pad. as per specification of UPPCL construction manual including including loading and unloading at the both ends. 17 Fixing of earthing rod as per RESPO manual and as per direction of supervising engineer including the cost of labour, T&P etc. Required for proper completion of work. 18 Chopping of tree branches which are touching to HT/LT lines. 19 Providing & Fixing ofClamps of LT,Cross Arm Holding, F-Clamp, Stay Clamp, Danger board clamp with Nut & Bolts. 20 Carriage & Mounting from site to Store/store to site following capacity transformer including the work of its loading & unloading, dragging etc. and also including the cost of labour and T&P etc. required for proper completion of work. 21 10/16 KVA T/F 22 25 KVA T/F 23 63 KVA T/F 24 100 KVA T/F 25 Safe carriageof LT distribution box (three phase) from store centre Sarsol to pit site including loading and unloading at both ends mounting and fixing on pole also by making connections as per RESPO norms. 26 Safe carriageof 3x70/3x120/3X185/3x300 Sq.mm.33 KV/11 KVXLPE Cable from Store Center to respective site of work including loading & unloading at both ends for proper completion of work. 27 Laying of 3x70/3x120/3X185/3x300 Sq.mm.33 KV/11 KV under ground cable by straight through after digging trench of 600 mm. wide, 1500 mm deep, providing the fine sand cushion beneath and above the cable. The cable shall be duly protected by Ist class bricks, two on either side and third on top of the cable, laid in series one after the other. The work includes supplying of fine sand and bricks, filling and ramming of the left out soil, closing the trench and levelling. Spare cable shall be left and buried in the trench in the shape of rings at both ends. All material (except cable), labour, T&P carrier etc, required for proper completion of work will be arranged by the contractor at his own cost. 28 Guarding of 11 KV Lineby laying two nos. GI wire parallel and fixing of lacings (tilli) at a distance at 2-3 Mtr. as per RESPO manual and also including the cost of arragement of labour, T & P etc. required for proper completion of work. 29 Carriage & Installation of 33KV/11 KV CT-PT Pole Mountedmetering unit on double pole after fixing of channel with M.S. Clamps and nuts bolts for holding the channel angle etc. The unit body shall be earthed by connecting M.S. strip of size 1/8x1 finally connected to earthing rod of size 20mm x2540 mm. 11 KV line shall be connected to unit as per instructions of SDO/AE(M). The M.S. Strip & earth rod shall be included in the scope of work. 30 Safe carriage & Installation of 33KV/11 KVpilfer proof metering cubicle from store centre, Sarsol to site of work. 31 Dismantling and removal of existing conductor/poles from the various area preparing their coils and then stacking in the respective JE’s (Store) as per direction of Supervising Engineer. It includes the work of cartage, cost of labour, T&P carrier etc. required for proper completion of work. 32 ACSR Weasal/Dog Conductor.