Supply Of Materials To Construction Katageri Nrlm Shed - Pvc Pipe Of 10Kg/Cum,90 Mm (Kat01),Rcc Cap 1000 Mm Dia, 100 Mm Thick (Kat01),Transportation Charges Of Materials Beyond 5 Km At 10 Percentage (Kat01),Labour Charges For Handing Errection Of Rcc Rings Etc. At 5 Percentage (Kat01),Fabrication Charges. (Kat01),Cost Of 6.5Mm M.S. Coil (Kat01),Polythylene Pipes High Density 25Mm External Dia (Kat01),Add 5 Percentage For Fittings And Wastage Charges (Kat01),Licenced Plumber With Tools (Kat01),Add Cement Sand And Grit 1 Percentage On Material (Kat01),Add White Lead Paint, Gasket, Cement, Sand For Making Good The Wall And Floor At 2 Percentage On Material (Kat01),A 100Mm S Or P Trap (Kat01),Indian Type Water Closet Of Size 580 Mm Of Specified Make With Footrests (Kat01),Handling Loading And Unloading 3 Percentage On Material (Kat01),Labour Charges For Lifting And Placing In Position And Making Connection At 7 Percentage On Material (Kat01),Polyenthylene Water Storage Tank Of Specified Capacity L (Kat01),Enamel Paint (Kat01),Add Brush, Putty, Sand Paper At 5 Percentage On Cost Of Paint (Kat01),Liquid Wood Filler (Kat01),Add Brush, Putty, Sand Paper At 2Percentage On Cost Of Paint (Kat01),Water Proofing Cement Paint (Kat01),Add Brush, Putty, Sand Paper, Roller At 5 Percentage On Cost Of Paint (Kat01),Plastic Emulsion Paint (Kat01),White Cement (Kat01),Ceramic Tiles 30 X 30 Cms (Kat01),Add Brush At 1 Percentage On Cost Of Paint (Kat01),Enamel Metal Paint (Kat01),Painter Class I (Kat01),Add Wire Brush, Fine Steel Wool, Putty, Sand Paper, At 3 Percentage On Cost Of Paint (Kat01),Ready Mix Primer Paint (Ready Mix Red Lead Paint) (Kat01),Add Hom Of Welding And Grinding Machine At 4 Percentage On Material (Kat01),Welder Grade I (Kat01),Fitter Class I (Kat01),Ms Flat (Kat01),M.S Rods (Kat01),Unit Cost As Per The Specification (Kat01),Mathi/Nandi Wood Scantling (Kat01),Hom Of Machinaries For Planing (Kat01),Add Cutting And Other Wastage 5 Percentage (Kat01),Mathi/Nandi Wood Planks For Panels 25 Mm Thick (Kat01),Vitrified Tiles 600X600 Mm (Kat01),Add Providing And Removing Scaffolding At 3 Percentage On Labour (Kat01),Solid Concrete Blocks (40X10x20 Cms)-4.00 N/Sqmm (Kat01),Add Handling , Loading And Unloading At 1 Percentage On Material (Kat01),Solid Concrete Blocks (40 X 15 X 20 Cms)-4.00 N/Sqmm (Kat01),Jungle Wood Runners And Planks (Kat01),Casurina Poles 75 - 100 Mm Dia (Kat01),Add Sundries Charges At 2 Percentage On Material (Kat01),Add Handling , Loading And Unloading At 2 Percentage On Material (Kat01),Casurina Poles 100 - 150 Mm (Kat01),Silver Oak Or Equivalent Planks 38 Mm Thick (Kat01),Add Watering Charges At 1 Percentage On Labour (Kat01),Add Sundries Charges At 1 Percentage On Labour (Kat01),Stone Chistler Class Ii (Kat01),Mason Class Ii (With Tools) (Kat01),Mason Class I (With Tools) (Kat01),Mixer (Concrete Small Used In Culvert) (Kat01),Boulders (Kat01),Bond Stone 20 X 20 X 45 Cm (Kat01),Size Stone 20 X 20 X 25 Cms (Kat01),Binding Wire (Kat01),Tmt Bars Fe 500 (Kat01),Hom Of Vibrator 0.71 Days (Kat01),Plasticizer / Super Plasticizer (Kat01),Granite/Trap Broken Metal 100 Mm And Down Size (Kat01),Transportation/Loading And Unloading Of Material/Lifting Of Material /Wastage/Unforeseen Charges/Miscellaneous Which Are Necessary During Execution. (Kat01),Add Sundries Charges At 1 Percentage On Material (Kat01),Add Watering Charges At 1 Percentage On Material (Kat01),Mixer (Concrete) - 1 Cum Capacity (Kat01),Portland Cement (Kat01),Coarse Sand (Zone Iii) (Kat01),Broken Stone Aggregate 12 Mm To 10 Mm Size(Kat01),Broken Stone Aggregate 20 Mm Size (Kat01),Broken Stone Aggregate 40 Mm Size (Kat01)