Construction Of Sanjeevini Shed Work At Kolur Village Of Koppal District - Display Board,.,Work Site Facility,Electrification,.,Cost Of 6.5 Mm M, S. Coil,Polyethylene Pipes High Density 32 Mm Dia External Dia.,Pvc Pipe Of 4 Kg / Cum , 75 Mm,Pvc Pipe, Of 6Kg Cum,63 Mm,Pvc Pipe, Of 10Kg Cum,110 Mm,Polyenthylene Water Storage Tank Of Specifief Capacity L,Licenced Plumber With Tools,,Indian Type Water Closet, Of Size 580 Mm Of Specified Make With Footrests,Border, Tiles 30 X 10 Cms,Glazed, Tiles 300X450.,Ceramic Tiles 30 X 30 Cms.,Vitrified Tiles 600 X 600 Mm.,Lime,,Painter Class L,Honnewood Planks, For Panels 20 Mm Thick,Honne, Wood,Unit Cost As Per The, Specification.,Mathi/ Nandi Wood Planks For Panels 25 Mm Thick,Binding, Wire,Tmt Bars Fe, 500,Casurina Poles, 75 - 100 Mm Dia,Mason Class L (With Tools),Solid Concrete Block (40X 15 X20 Cms)- 5.00 N/Sqmm,Burnt Bricks Class 35, (Non Modular),Casurina Poles 100 - 150,Mm,Silver Oak Or Equivalent, Planks,Jungle Wood,Runners And Planks,Mixer ( Concrete Small, Used In Culvert),Boulders,.,,Bond Stone 20 X 20 X 45, Cm,Size Stone, 20 X 20 X 25 Cms.,Hom Of Vibrator 0.71, Days.,Plasticizer, / Super Plasticizer.,Form Work For Foundation Upto Plinth,.,Over Head And Other Miscellaneous Charges.,Mixer (Concrete) - 1,Cum Capacity.,Portland, Cement.,Coarse Sand (Zone -Lll),Broken Stone Aggreate 12, Mm To 10,Mm Size,Broken Stone Aggregate 20,Mm Size.,Broken Stone Aggregate 40Mm Size.