Construction Of Kitchen Shed In Government Higher Primary School In Kasaba Jambagi Gp At Mudhol Taluka - Jmbksbb Beldar,Jmbksbb Mason Class I (With Tools),Jmbksbb Vitrified Tiles 600X600 Mm,Jmbksb Pigment,Jmbksb Cudddapah Slab 2.5 Cms Thick,Jmbksb Mathi/Nandi Wood Scantling,Jmbksb Hom Of Machinaries For Planing,Jmbksb Add Cutting And Other Wastage 5Percent,Jmbksb Mathi/Nandi Wood Planks For Panels 25 Mm Thick,Jmbksb Add Brush At 1Percent On Cost Of Paint,Jmbksb Enamel Metal Paint,Jmbksb Add Wire Brush Fine Steel Wool Putty Sand Paper At 3Percent On Cost Of Paint,Jmbksb Ready Mix Primer Paint (Ready Mix Red Lead Paint),Jmbksb Add Hom Of Welding And Grinding Machine At 4Percent On Material,Jmbksb Welder Grade I,Jmbksb Fitter Class I,Jmbksb Ms Flat,Jmbksb M.S Rods,Jmbksb Add Hom Of Welding And Grinding Machine At 2Percent On Material,Jmbksb Fabricator,Jmbksb 5.50 Mm Thick Plain Glass,Jmbksb Chrominum Plated Screws,Jmbksb Cleat Angles,Jmbksb Alluminium Handles - 15 Mm,Jmbksb Alluminium Tower Bolt - 20 Cm,Jmbksb Pvc Edge Beading,Jmbksb Rubber Beading For Shutters Beading,Jmbksb Nylon Rollers,Jmbksb Aluminium Window Frame Section 1.20 Mm Thick,Jmbksb Vitrified Tiles 600X600 Mm,Jmbksb Add Brush Putty Sand Paper At 2Percent On Cost Of Paint,Jmbksb Water Proofing Cement Paint,Jmbksb Add Brush Putty Sand Paper Roller At 5Percent On Cost Of Paint,Jmbksb Plastic Emulsion Paint,Jmbksb Painter Class I,Jmbksb Add Brush Putty At 5Percent On Cost Of Distemper Primer,Jmbksb Distemper Primer,Jmbksb Add Providing And Removing Scaffolding At 3Percent On Labour,Jmbksb Burnt Bricks Class 35 (Non Modular),Jmbksb Add Handling Loading And Unloading At 1Percent On Material,Jmbksb Stone Chistler Class Ii,Jmbksb Boulders,Jmbksb Size Stone 20 X 20 X 25 Cms,Jmbksb Mason Class Ii (With Tools),Jmbksb Mason Class I (With Tools),Jmbksb Mixer (Concrete Small Used In Culvert),Jmbksb Bond Stone 20 X 20 X 45 Cm,Jmbksb Rubble Stones,Jmbksb Binding Wire,Jmbksb Tmt Bars Fe 500,Jmbksb Casurina Poles 75 - 100 Mm Dia,Jmbksb Add Sundries Charges At 2 Percent On Material,Jmbksb Add Handling Loading And Unloading At 2Percent On Material,Jmbksb Casurina Poles 100 - 150 Mm,Jmbksb Silver Oak Or Equivalent Planks 38 Mm Thick,Jmbksb Jungle Wood Runners And Planks,Jmbksb Hom Of Vibrator 0.71 Days,Jmbksb Plasticizer / Super Plasticizer,Jmbksb Add Watering Charges At 1 Percent On Material,Jmbksb Mixer (Concrete) - 1 Cum Capacity,Jmbksb Portland Cement,Jmbksb Coarse Sand (Zone Iii),Jmbksb Broken Stone Aggregate 12 Mm To 10 Mm Size,Jmbksb Broken Stone Aggregate 20 Mm Size,Jmbksb Over Head & Other Miscellaneous Charges,Jmbksb Add Sundries Charges At 1 Percent On Material