Supply Of Materials For Construction Of Godown In Housanur Village Tp Guledagudda - Add Brush, Putty, Glue At 5 Percentage On Cost Of Paint (Hos1),Whitening (Hos1),Dry Distemper (Hos1),Mason Class I (With Tools) (Hos1),Add Brush At 1Percentage On Cost Of Paint (Hos1),Enamel Metal Paint (Hos1),Add Providing And Removing Scaffolding At 3 Percentage On Labour (Hos1),Painter Class I (Hos1),Add Wire Brush, Fine Steel Wool, Putty, Sand Paper, At 3 Percentage On Cost Of Paint(Hos1),Ready Mix Primer Paint (Ready Mix Red Lead Paint)(Hos1),Add Hom Of Welding And Grinding Machine At 4 Percentage On Material (Hos1),Fitter Class I (Hos1),M.S Rods (Hos1),Unit Cost As Per The Specification (Hos1),Tools And Plants At 2 Percentage On Material (Hos1),Hom Of Cutting And Grinding Machine (Hos1),Mechanic Class Ii/Mechanic Hmp Grade I/Eme Grade (Hos1),Add (Hos1),Hom Of Welding And Grinding Machine (Hos1),Welder Grade I (Hos1),Corbon Electrodes (Hos1),Rms Gusset Plate (Hos1),Ms Pipes Of 80 Mm To 100 Mm Dia (Hos1),Add Handling , Loading And Unloading At 1Percentage On Material (Hos1),Burnt Bricks Class 35 (Non Modular)(Hos1),Casurina Poles 75 - 100 Mm Dia (Hos1),Add Sundries Charges At 2 Percentage On Material (Hos1),Add Handling , Loading And Unloading At 2Percentage On Material (Hos1),Bolts And Nuts (Hos1),Ms Flat (Hos1),Casurina Poles 100 - 150 Mm (Hos1),Silver Oak Or Equivalent Planks 38 Mm Thick (Hos1),Jungle Wood Runners And Planks (Hos1),Binding Wire (Hos1),Tmt Bars Fe 500 (Hos1),Hom Of Vibrator 0.71 Days (Hos1),Plasticizer / Super Plasticizer (Hos1),Mixer (Concrete Small Used In Culvert) (Hos1),Bond Stone 20X20x45 Cm (Hos1),Rubble Stones (Hos1),Add Watering Charges At 1 Percentage On Material (Hos1),Mixer (Concrete)-1 Cum Capacity (Hos1),Portland Cement (Hos1),Coarse Sand (Zone Iii)(Hos1),Broken Stone Aggregate 12 Mm To 10 Mm Size (Hos1),Broken Stone Aggregate 20 Mm Size (Hos1),Broken Stone Aggregate 40 Mm Size (Hos1),Add Watering Charges At 1 Percentage On Labour (Hos1),Add Sundries Charges At 1 Percentage On Labour (Hos1),Transportation/Loading And Unloading Of Material/Lifting Of Material /Wastage/Unforeseen Charges/Miscellaneous Which Are Necessary During Execution.(Hos1),Add Sundries Charges At 1 Percentage On Material Hos1