Construction Of Sanjeevini Shed In Korti Village Of Korti Gp At Bilagi Taluka - Sanjshed01 Gst,Sanjshed01 Vibrator (Needle Type 40 Mm),Sanjshed01 Hire Charges Of Concrete Mixer 0.25 To 0.40 Cum With Hopper,Sanjshed01 Cement,Sanjshed01 Coarse Sand,Sanjshed01 Stone Aggregate Below 40 Mm Nominal Size,Sanjshed01 Stone Aggregate(Single Size) 10 Mm Nominal Size,Sanjshed01 Stone Aggregate(Single Size) 20 Mm Nominal Size,Sanjshed01 Chlorinated Polyvinyl - Chloride (Cpvc) Pipe 25 Mm Outer Dia,Sanjshed01 Carriage,Sanjshed01 Sundries,Sanjshed01 100 Mm S.C.I. Trap With Vent Heel,Sanjshed01 Flushing Cistern P.V.C. 10 Lts Capacity (Low Level) (White) (With Fittings, Accessories And Flush Pipe),Sanjshed01 Vitreous China Orrisa Type W.C. Pan Size 580 Mm,Sanjshed01 Handling Loading And Unloading 3Percent On Material,Sanjshed01 Labour Charges For Lifting And Placing In Position And Making Connection At 7 Percent On Material,Sanjshed01 Polyenthylene Water Storage Tank Of Specified Capacity L,Sanjshed01 Add Brush, Putty, Sand Paper, Roller At 5Percent On Cost Of Paint,Sanjshed01 Enamel Paint,Sanjshed01 Painter Class I,Sanjshed01 Add Brush, Putty, Glue At 5 Percent On Cost Of Paint,Sanjshed01 Whitening,Sanjshed01 Dry Distemper,Sanjshed01 White Cement,Sanjshed01 Ceramic Tiles 30 X 30 Cms,Sanjshed01 Teak Wood Beading 20 X 20 Mm,Sanjshed01 Add 15Percent Wastage,Sanjshed01 Reeded Glass 3 Mm Thick,Sanjshed01 Add 5 Percent Wastage Charges,Sanjshed01 Mathi/Nandi Wood Scantling For Styles Ad Rails 25 Mm Thick,Sanjshed01 Mathi/Nandi Wood Scantling For Styles And Rails 30 Mm Thick,Sanjshed01 Honnewood Planks For Panels 20 Mm Thick,Sanjshed01 Honne Wood,Sanjshed01 Hom Of Machinaries For Planing,Sanjshed01 Add Cutting And Other Wastage 5 Percent,Sanjshed01 Mathi/Nandi Wood Planks For Panels 25 Mm Thick,Sanjshed01 Vitrified Tiles 600X600 Mm,Sanjshed01 Add Providing And Removing Scaffolding At 3 Percent On Labour,Sanjshed01 Burnt Bricks Class 35 (Non Modular),Sanjshed01 Add Handling , Loading And Unloading At 1 Percent On Material,Sanjshed01 Brick,Sanjshed01 Add Sundries Charges At 2 Percent On Material,Sanjshed01 Casurina Poles 100 - 150 Mm,Sanjshed01 Add Handling , Loading And Unloading At 2 Percent On Material,Sanjshed01 Casurina Poles 75 - 100 Mm Dia,Sanjshed01 Jungle Wood Runners And Planks,Sanjshed01 Silver Oak Or Equivalent Planks 38 Mm Thick,Sanjshed01 Add Watering Charges At 1 Percent On Labour,Sanjshed01 Add Sundries Charges At 1 Percent On Labour,Sanjshed01 Stone Chistler Class Ii,Sanjshed01 Mason Class Ii (With Tools),Sanjshed01 Mason Class I (With Tools),Sanjshed01 Mixer (Concrete Small Used In Culvert),Sanjshed01 Boulders,Sanjshed01 Bond Stone 20 X 20 X 45 Cm,Sanjshed01 Size Stone 20 X 20 X 25 Cms,Sanjshed01 Binding Wire,Sanjshed01 Tmt Bars Fe 500,Sanjshed01 Hom Of Vibrator 0.71 Days,Sanjshed01 Plasticizer / Super Plasticizer,Sanjshed01 Transportation/Loading And Unloading Of Material/Lifting Of Material /Wastage/Unforeseen Charges/Miscellaneous Which Are Necessary During Execution.,Sanjshed01 Add Sundries Charges At 1 Percent On Material,Sanjshed01 Add Watering Charges At 1 Percent On Material,Sanjshed01 Mixer (Concrete) 1 Cum Capacity,Sanjshed01 Portland Cement,Sanjshed01 Coarse Sand (Zone Iii),Sanjshed01 Broken Stone Aggregate 12 Mm To 10 Mm Size,Sanjshed01 Broken Stone Aggregate 20 Mm Size,Sanjshed01 Broken Stone Aggregate 40 Mm Size