Power Government Departments Closing in 0 days TDR #48034337

Tender For Work For Increasing Capacity Of 33/11 Kv Sub-Station Sarsawa Town From 2×10+1×5 Mva To 3×10+1×5 Mva In District Sahararnpur - Safe Carriage Of Following Stock Material From Any Stores Centres Under Pvvnl, Depending Upon The Availability Of Mate

Issued by Government Departments · meerut, Uttar Pradesh
Tender Value
24.99 Lakhs
Estimated cost
Bid Submission
06 Mar 2025
0 days left
EMD
30000
Bank guarantee accepted
Document Fee
3540
Non-refundable
Tender Type
Online

Tender Overview

Competition Type
NCB
Bidding Type
Tender
Location / State
meerut → Uttar Pradesh
EMD Exemption
Not Available
Quantity
Not Available

Project Description

Tender For Work for Increasing Capacity of 33/11 KV Sub-Station Sarsawa Town from 2×10+1×5 MVA to 3×10+1×5 MVA in District Sahararnpur - Safe carriage of following stock material from any stores centres under PVVNL, depending upon the availability of material at Stores Centres, with loading & unloading at both ends respectively.33 KV C.T. 400/200/1-A 2 33 KV PT, 33 KV/110V-1 Phase 3 33KV VCB 800A, 750 MVA 4 33KV VCB 1250A 5 33 KV Fuse Set 6 33KV control panel of Single T/F 7 33 KV Lightning Arrestors 8 33 KV Line Isolator, 800A, 33 KV 9 33 KV Bus Isolator, 800A, 33 KV 10 33 KV Post Insulators 11 Disc Insulators B&S 70 KN, 33 KV 12 Disc Fittings B&S 70 KN, 33 KV for Dog 13 33 KV Pin Insulators 14 33 KV Pins With Nuts 15 ACSR Dog Conductor 16 11 KV XLPE Cable 3×300mm² XLPE 17 11 KV XLPE Cable 3×185mm² XLPE 18 11KV Cable J/kit outdoor type for 3x300mm 19 11KV Cable J/kit indoor type for 3x300mm 20 11KV Cable J/kit outdoor type for 3x185mm 21 11KV Cable J/kit indoor type for 3x185mm 22 24 V Battery with Battery Charger & Cabinet 23 M.S. Angle (75×75×6)mm 24 M.S. Angle (65×65×6)mm 25 M.S. Angle (50×50×6)mm 26 M.S. Channel (125×65)mm 27 M.S. Channel (100×50)mm 28 Isolator StructureFabrication & erection of Isolator structure (Line & Bus)–3 Nos. size of plinth (0.9×0.30×1.0)m as per drawing no. RES-39 a) Excavation of earth for making 04 Nos. pits of size (0.9×0.30×1.0)m 29 b) Fabrication and erection of Isolator structure (Bus & Line) each by using 3.5 m long 04 Nos. of M.S. channel of size (125×65×6)mm with bracing by M.S. Angle (50×50×6)mm size and providing 02 Nos. M.S. Angle (75×75×8)mm and 2.6m long on the top of Channel at both side of Isolator. The work also includes cutting, drilling, welding and proper alignment of the same for completion of work. 30 c) C.C. work in ratio of 1:4:8 (cement, fine sand and brick ballast) of size (0.9×0.3×0.15)m for 04 Nos. pits for making bed after proper ramming etc. 31 d) C.C. work of ratio 1:3:6 (cement, coarse sand and 25 mm stone grit) for pre-fabricated structure of Line and Bus isolator size of plinth (0.9×0.3×1.00)m for 04 Nos. 32 e) 12 mm thick plaster with cement mortar ratio 1:4 (cement & fine sand) of plinth of 0.15 m above ground level. 33 L.A.s/P.I.s,/C.T.s/P.T.s/Fuse Set structure:– (22 Nos)Fabrication & erection of Lightening Arrestors, Post Insulators/Fuse Set, C.T.s structure and Plinth for the same as per drawing No. RES-39 details (Quantity for five structures):–a) Excavation of earth (0.30×0.30×1.0)m for 02 Nos. Pits of above structures. 34 b) Fabrication and erection of L.A.s/P.I.s/C.T.s/Fuse Set structure by using M.S. Channel (125×65) mm size and 3.5 m minimum height with 2 Nos. M.S. Angle (65×65×6/50×50×6)mm size on top of structure for installation L.A.s/P.I.s/C.T.s/Fuse Set. (01 No. each) 35 c) C.C. work in ratio of 1:4:8 (cement, fine sand and brick ballast) of size (0.30×0.30×0.15)m for 02 Nos. pits for making bed for each structure. Work includes proper ramming etc. 36 d) C.C. Work of ratio 1:3:6 (cement, coarse sand and 25 mm size stone grit) for the above plinths for structure of L.A.s, P.I.s/C.T.s/ Fuse Set after ramming of earth of size (0.3×0.3×1.00)m. Over stone pad/bed 37 e) 12 mm thick plaster with cement mortar ratio 1:4 (cement & fine sand) of plinth of 0.15 m above ground level. 38 Plinth for 10 MVA TransformerConstruction of plinth for 10 MVA, 33/11 KV Transformer of size (4.46×3.46×1.0)m (0.50m below ground level and 0.5 m above ground level) as per details & drawing attached:–a) Excavation of earth (4.50×3.50×0.5)m 39 b) Flooring of plinth in C.C. 1:4:8 (cement, sand & brick ballast) for making foundation bed. Size (4.50×3.50×0.15)m 40 c) Ist Class brick work for side walls size 0.345 m wide upto 0.3 M height and 0.23 m wide upto 0.35 m height C.C. ratio of 1:4 (cement & find sand) 41 d) Filling of brick ballast in plinth in ratio 1:4:8 (cement, coarse sand & brick ballast) with proper ramming. Size (4.0×3.0×0.65)m 42 e) R.C.C. work in the top layer of plinth in ratio 1:2:4 in size (4.46×3.46)m and 0.20 m thickness by using MS bar of 12mm dia both ways. The work also includes binding of steel reinforcement. 43 f) Quantity of M.S. Tor of size 12 mm dia required for reinforcement of plinth in R.C.C. work should be 18 nos. bars of 3.4 mtr length and 12 nos. bars of 4.40 mtr. length. Work also includes cutting, bending and laying etc. in the T/F plinth. 44 g) Providing of 90 LBS Rail piece and Grouting of 02 Nos. 90/105 lb. Rail pieces of 3.46 M long and (50×50×6)mm M.S. Angle in R.C.C. work at the top of plinth work also includes cutting of rail and angle pieces etc. 45 h) 12 mm thick plaster with cement mortar ratio 1:4 (cement & fine sand) of plinth of 0.5 M above ground level. 46 Plinth for 33 KV V.C.B. (02 Nos.)Construction of plinth for the structure of 33 KV VCB as per details a) Excavation of earth of size (2.4×1.5×1.0) m pits for construction of plinth. 47 b) Brick Ballast ratio (1:4:8) (cement, sand & brick ballast ) for foundation work (2.4×1.5×0.15)m plinth. 48 c) C.C. work in ratio 1:2:4 (cement, coarse sand &stone grit) of 20mm size for making plinth of size (2.4×1.5×1.00)m and grouting of foundation bolts 04 Nos. for 33 KV VCB. 49 d) 12 mm thick plaster with cement mortar in ratio 1:4 (cement & fine sand) of plinth of 0.15 m above ground level size (2.4×1.5)m. 50 Hiring of D/G Set including carriage, loading, unloading & operating charges (with fuel) at 33/11 KV Substation under construction in case L.T. supply is not available near S/S within prescribed accessible limit.63 KVA, Three phase, D/G Set for fabrication of different structure at Substation. 51 Miscellaneous Electrical works at Newly proposedInstallation of 33/11 KV, 10 MVA Transformer :a) Boring and lowering of G.I. Pipe size 32 mm dia… into the ground up to water level 20 Mtr., with the lower end of solid copper cone Approx 225mm long and 750 gm in weight shall be provided and screwed in pipe as well as bringing out a continuous copper wire 6 SWG from the cone up to the ground surface where it will be bolted to the M.S. earth Strip for Transformer neutral connection, the earth strip will be welded to the G.I. pipe and neutral earthing support. 52 b) Fabrication and erection of neutral earthing L Type support made of M.S. Channel size 100×50mm. Structure shall be 4 Mtr. long with 1 Mtr. Arms. Structure shall be grouted in ratio 1:3:6 in block size 300×300×700mm and painted with one coat of Ready Mixed primer and Two coat of enamel Aluminium paint work includes connecting neutral bushing rod of power Transformer and M.S. Earthing strip with the help of flexible copper bond, M.S. Bolt and washer. 53 c) Fabrication and erection of cable support made of two pieces of M.S. Angle (50×50×6)/65×65×6) mm, 2.75 meter long, joined to each other by means of 5 Nos. M.S. Flat (50×6)mm pieces of size 150 mm long each by welding at equal intervals and grouting in a block of size (300×300×700)mm in CC 1:3:6 complete with one coat of ready mixed primer and two coats of Al. paint. Work includes providing of three Nos. M.S. clamps made of (50×6)mm M.S. Flat for holding the cable including nuts and bolts. 54 d) Fabrication and grouting of M.S. frames 3.60 mt. long for support of copper Bus Bar. Bus Bar will be provided in L.V. Side of Power transformer. The M.S. frame shall be made of M.S. channel (100×50)mm in T shape. Providing 2 Nos. support of M.S. Angle iron (50×50×6)mm, 0.60 mt. long below the top channel, drilling of 3 Nos. hole on the top channel for fixing of 11 KV pin insulator. The M.S. frame shall be painted with one coat of primer & two coat of aluminum paint and grouting the frame in C.C. ratio 1:3:6 in a block of size (300×300×700)mm. The work also includes the fixing of 3 Nos. 11 KV pin insulator with pin and binding the copper Bus Bar with the pin insulator by Aluminum binding wire in complete. 55 e) Supply & Fabrication of copper bus bar of size (2000×50×6)mm in L.V. side of 10MVA 33/11 KV, power transformer. Work includes connection of outside bus bar in L.V. side busing rod of Power Transformer and other side with outdoor 11 KV cable box as well as providing empire tape and H.T. tape etc. for proper insulation work. 56 H.T. Power Cable Laying :i) Laying 11 KV, (3x300)/(3×185) mm2 XLPE Cable from power transformer to 11 KV incoming switch gear and in the cable trench and 0.45 m wide, 0.90m depth. Providing 150 mm local sand for cushion beneath and 150 mm above the cable. The cable shall be dully protected by brick. On both side of cable by laying brick along the cable ............. The work includes digging of trenches, laying of cable in under ground trenches, joining of terminals, back filling of earth and testing and commissioning of power cable etc. 57 ii) Laying and dressing of 11 KV (3x300)/(3×185) mm2 power cable in air/Trench. 58 iii) Providing and Erection of Fixing 150mm dia 2mm thick 2M long G.I.Pipe over 11KV, 3x300Sq.mm XLPE Cable before mounting the 2No. Cable on cable support structure. Work includes fixing of all Clamp. 59 Preparation of 11 KV Power Cable ends:i) Making of cable end termination by Heat shrinkable Out door jointing kits suitable for 11KV, 3x300/3x185q.mm XLPE cable. Providing, fixing and crimping of proper size good quality lugs complete in all respect. 60 ii) Making of cable end termination by Heat shrinkable indoor jointing kits suitable for 11KV, 3x300/3x185Sq.mm XLPE cable. Providing, fixing and crimping of proper size good quality lugs complete in all respect. 61 Control Cable Laying a) Providing of control cable and Laying of different size of (2×2.5)mm2 control cables i.e. from Buchholz realy to Marshalling box Marshalling box to switch gear room, 33 KV CTs to CTs CT 33 KV, V.C.B. Control Panel Junction Box to 33 KV VCB control panel and control panel to 33 KV VCB outdoor operating mechanism panel from T/F etc. in the cable trench including making proper connection at Buchholz Relay, Marshalling box as per required for installed equipment. 62 b) Providing of control cable and Laying of different size of (4×2.5)mm2 control cables i.e. from Buchholz realy to Marshalling box Marshalling box to switch gear room, 33 KV CTs to CTs CT 33 KV, V.C.B. Control Panel Junction Box to 33 KV VCB control panel and control panel to 33 KV VCB outdoor operating mechanism panel from T/F etc. in the cable trench including making proper connection at Buchholz Relay, Marshalling box as per required for installed equipment. 63 c) Providing of control cable and Laying of different size of (6×2.5)mm2 control cables i.e. from Buchholz realy to Marshalling box Marshalling box to switch gear room, 33 KV CTs to CTs CT 33 KV, V.C.B. Control Panel Junction Box to 33 KV VCB control panel and control panel to 33 KV VCB outdoor operating mechanism panel from T/F etc. in the cable trench including making proper connection at Buchholz Relay, Marshalling box as per required for installed equipment. 64 d) Providing of control cable and Laying of different size of (10×2.5)mm2 control cables i.e. from Buchholz realy to Marshalling box Marshalling box to switch gear room, 33 KV CTs to CTs CT 33 KV, V.C.B. Control Panel Junction Box to 33 KV VCB control panel and control panel to 33 KV VCB outdoor operating mechanism panel from T/F etc. in the cable trench including making proper connection at Buchholz Relay, Marshalling box as per required for installed equipment. 65 Testing & commissioning of Power T/F and all 33KV & 11KV switchgears / Panels. providing required No. of technicians with proper testing equipments during commissioning & energisation. 66 Providing of M.S Round 32mm dia and Digging of Pits for making delta by laying 32mm. dia M.S.Round in tringle shape. Electric welding on cross joints by providing “U” Clamp in size 25×6mm. of M.S.Flat, with over lap joint by providing M.S.Round-12mm dia, on both sides of over lap joints of M.S.Round, by electric welding. All joints shall be painted with black bituminious paint. 67 Earthing of 33KV LA, Neutral link structure, Power T/F body (both side) by providing G.I.Strip in size 50×6mm. with 32mm. dia M.S.Round laid in trench with proper electric welding. 68 Installation of 33 KV Isolators :Assembling and installation of line/Bus Isolator on the isolator structure. Adjusting of operating mechanism in proper alignment so as to ensure smooth operation of the same. In case of Line Isolator proper operation of earth links shall also be ensured. The work includes fabrication for proper fixing if required. 69 Installation of 33 KV Post Insulators : Installation of 3 Nos. PI on structure. The work includes fabrication for proper fixing, if required. 70 Installation of 33 KV Lightening Arrestors ::-Assembling and installation/mounting of 3 Nos. lighting arrestors on the L.A.s structure/terminal gantry, complete with earthing and line connections. The work includes fabrication for proper fixing, if required. 71 Installation of 33 KV VCBAssembling and installation of 33 KV VCB on the VCB out door structure on the plinth. Adjustment of operating mechanism in proper alignment for smooth operation of the same. The work also includes fabrication of addition arrangement for proper fixing, if required. 72 Installation and commissioning of 33 KV C.T.s :-Installation of 3 Nos. C.T.s on the C.T.s structure. The work includes fabrication for proper fixing, if required to complete the work. 73 Installation of 33 KV Fuse Set with Structure:Assembling and installation of fuse set on the fuse set structure. The work includes fabrication for proper fixing, if required. 74 Installation of 24 V Battery and Battery Charger :Assembling and installation of the cabinet of 24 V battery and battery charger in switch gear control room including grouting of foundation bolts as per drawing of manufacture, including providing the foundation nuts and bolts of proper size. The electrical connection between battery and battery charge with flexible copper lead of size 7/20 SWG shall be done properly. The work includes installation, wiring upto control panel, testing and commissioning complete in all respect. 75 Installation of 33 KV P.T.s Installation of 3 nos. P.T.s on P.T. Structure. The work includes any fabrication work for fixing, if required to complete the work. 76 Installation of 33 KV VCB Control PanelCarefully and safely shifting of 33 KV VCB control panel from outside of the switch gear room to inside of the switch gear room, grouting with anchor bolts in the floor, work also includes cutting & proper finishing of floor if necessary for completion of work. Placing and fixing of panel on foundation, bolts of proper size in proper position and alignment. 77 Testing & commissioning of Power T/F and all 33KV & 11KV switchgears / Panels. providing required No. of technicians with proper testing equipments during commissioning & energisation. 78 Construction of SSOs approached road with material 79 Construction of Control Cable Trench with Material 80 Extension of S/S fencing with material 81 Painting of Sub-Station Structure & Equipment 82 Fabrication charges of Angle, Channel 83 Fabrication charges of Strcuture 84 Fabrication charges of Bus-bar Gantry 85 Laying charges of 11 KV XLPE cable 86 Jumpering, including clamping/binding with ACSR Dog/Panther conductor:a) 33 KV Line Insulator to 33 KV bus bar through post insulators 87 b) 33 KV Bus bar to 33 KV Bus Isolator. 88 c) 33 KV Bus Isolator to Post Insulator 89 d) 33 KV Bus Isolator to 33 KV VCB 90 e) 33 KV VCB to 33 KV CT 91 f) 33 KV Bus-Bar to 33 KV PT 92 g) 33 KV CT to 33 KV Fuse Set 93 33 KV Fuse Set to 33/11 Power Transformer through 33 KV Lightening Arrestors work includes supply & installation of proper size copper lugs with power Transformer. 94 Leveling & dressing of the Switchyard including cutting up rooting of grass/grass vegetation making proper slope watering & ramming. 95 Providing & fixing of following 33 KV connecting clamps duly casted made of aluminium alloy complete with G.I. Nut, bolts, washers and spring washers suitable for ACSR Dog Conductora) 33 KV Transformers Clamps 96 b) 33 KV Fuse Set Clamps 97 c) 33 KV Isolator Clamps 98 d) 33 KV Post Insulator Clamps 99 e) 33 KV V.C.B. Connecting Clamp 100 f) 33 KV C.T. Connecting Clamp 101 g) 33 KV P.T. Connecting Clamp 102 h) 33 KV Lightning Arrestor Clamps 103 i) PG Clamps for Dog to Dog

BOQ

Name of Work: Work for Increasing Capacity of 33/11 KV Sub-Station Sarsawa Town from 2×10+1×5 MVA to 3×10+1×5 MVA in District Sahararnpur
Sl. No. Item Description
1Safe carriage of following stock material from any stores centres under PVVNL, depending upon the availability of material at Stores Centres, with loading & unloading at both ends respectively.33 KV C.T. 400/200/1-A
233 KV PT, 33 KV/110V-1 Phase
333KV VCB 800A, 750 MVA
433KV VCB 1250A
533 KV Fuse Set
633KV control panel of Single T/F
733 KV Lightning Arrestors
833 KV Line Isolator, 800A, 33 KV
933 KV Bus Isolator, 800A, 33 KV
1033 KV Post Insulators
11Disc Insulators B&S 70 KN, 33 KV
12Disc Fittings B&S 70 KN, 33 KV for Dog
1333 KV Pin Insulators
1433 KV Pins With Nuts
15ACSR Dog Conductor
1611 KV XLPE Cable 3×300mm² XLPE
1711 KV XLPE Cable 3×185mm² XLPE
1811KV Cable J/kit outdoor type for 3x300mm
1911KV Cable J/kit indoor type for 3x300mm
2011KV Cable J/kit outdoor type for 3x185mm
2111KV Cable J/kit indoor type for 3x185mm
2224 \"V\" Battery with Battery Charger & Cabinet
23M.S. Angle (75×75×6)mm
24M.S. Angle (65×65×6)mm
25M.S. Angle (50×50×6)mm
26M.S. Channel (125×65)mm
27M.S. Channel (100×50)mm
28Isolator StructureFabrication & erection of Isolator structure (Line & Bus)–3 Nos. size of plinth (0.9×0.30×1.0)m as per drawing no. RES-39 a) Excavation of earth for making 04 Nos. pits of size (0.9×0.30×1.0)m
29b) Fabrication and erection of Isolator structure (Bus & Line) each by using 3.5 m long 04 Nos. of M.S. channel of size (125×65×6)mm with bracing by M.S. Angle (50×50×6)mm size and providing 02 Nos. M.S. Angle (75×75×8)mm and 2.6m long on the top of Channel at both side of Isolator. The work also includes cutting, drilling, welding and proper alignment of the same for completion of work.
30c) C.C. work in ratio of 1:4:8 (cement, fine sand and brick ballast) of size (0.9×0.3×0.15)m for 04 Nos. pits for making bed after proper ramming etc.
31d) C.C. work of ratio 1:3:6 (cement, coarse sand and 25 mm stone grit) for pre-fabricated structure of Line and Bus isolator size of plinth (0.9×0.3×1.00)m for 04 Nos.
32e) 12 mm thick plaster with cement mortar ratio 1:4 (cement & fine sand) of plinth of 0.15 m above ground level.
33L.A.s/P.I.s,/C.T.s/P.T.s/Fuse Set structure:– (22 Nos)Fabrication & erection of Lightening Arrestors, Post Insulators/Fuse Set, C.T.\"s structure and Plinth for the same as per drawing No. RES-39 details (Quantity for five structures):–a) Excavation of earth (0.30×0.30×1.0)m for 02 Nos. Pits of above structures.
34b) Fabrication and erection of L.A.\"s/P.I.\"s/C.T.\"s/Fuse Set structure by using M.S. Channel (125×65) mm size and 3.5 m minimum height with 2 Nos. M.S. Angle (65×65×6/50×50×6)mm size on top of structure for installation L.A.\"s/P.I.\"s/C.T.s/Fuse Set. (01 No. each)
35c) C.C. work in ratio of 1:4:8 (cement, fine sand and brick ballast) of size (0.30×0.30×0.15)m for 02 Nos. pits for making bed for each structure. Work includes proper ramming etc.
36d) C.C. Work of ratio 1:3:6 (cement, coarse sand and 25 mm size stone grit) for the above plinths for structure of L.A.\"s, P.I.\"s/C.T.\"s/ Fuse Set after ramming of earth of size (0.3×0.3×1.00)m. Over stone pad/bed
37e) 12 mm thick plaster with cement mortar ratio 1:4 (cement & fine sand) of plinth of 0.15 m above ground level.
38Plinth for 10 MVA TransformerConstruction of plinth for 10 MVA, 33/11 KV Transformer of size (4.46×3.46×1.0)m (0.50m below ground level and 0.5 m above ground level) as per details & drawing attached:–a) Excavation of earth (4.50×3.50×0.5)m
39b) Flooring of plinth in C.C. 1:4:8 (cement, sand & brick ballast) for making foundation bed. Size (4.50×3.50×0.15)m
40c) Ist Class brick work for side walls size 0.345 m wide upto 0.3 M height and 0.23 m wide upto 0.35 m height C.C. ratio of 1:4 (cement & find sand)
41d) Filling of brick ballast in plinth in ratio 1:4:8 (cement, coarse sand & brick ballast) with proper ramming. Size (4.0×3.0×0.65)m
42e) R.C.C. work in the top layer of plinth in ratio 1:2:4 in size (4.46×3.46)m and 0.20 m thickness by using MS bar of 12mm dia both ways. The work also includes binding of steel reinforcement.
43f) Quantity of M.S. Tor of size 12 mm dia required for reinforcement of plinth in R.C.C. work should be 18 nos. bars of 3.4 mtr length and 12 nos. bars of 4.40 mtr. length. Work also includes cutting, bending and laying etc. in the T/F plinth.
44g) Providing of 90 LBS Rail piece and Grouting of 02 Nos. 90/105 lb. Rail pieces of 3.46 M long and (50×50×6)mm M.S. Angle in R.C.C. work at the top of plinth work also includes cutting of rail and angle pieces etc.
45h) 12 mm thick plaster with cement mortar ratio 1:4 (cement & fine sand) of plinth of 0.5 M above ground level.
46Plinth for 33 KV V.C.B. (02 Nos.)Construction of plinth for the structure of 33 KV VCB as per details a) Excavation of earth of size (2.4×1.5×1.0) m pits for construction of plinth.
47b) Brick Ballast ratio (1:4:8) (cement, sand & brick ballast ) for foundation work (2.4×1.5×0.15)m plinth.
48c) C.C. work in ratio 1:2:4 (cement, coarse sand &stone grit) of 20mm size for making plinth of size (2.4×1.5×1.00)m and grouting of foundation bolts 04 Nos. for 33 KV VCB.
49d) 12 mm thick plaster with cement mortar in ratio 1:4 (cement & fine sand) of plinth of 0.15 m above ground level size (2.4×1.5)m.
50Hiring of D/G Set including carriage, loading, unloading & operating charges (with fuel) at 33/11 KV Substation under construction in case L.T. supply is not available near S/S within prescribed accessible limit.63 KVA, Three phase, D/G Set for fabrication of different structure at Substation.
51Miscellaneous Electrical works at Newly proposedInstallation of 33/11 KV, 10 MVA Transformer :a) Boring and lowering of G.I. Pipe size 32 mm dia… into the ground up to water level 20 Mtr., with the lower end of solid copper cone Approx 225mm long and 750 gm in weight shall be provided and screwed in pipe as well as bringing out a continuous copper wire 6 SWG from the cone up to the ground surface where it will be bolted to the M.S. earth Strip for Transformer neutral connection, the earth strip will be welded to the G.I. pipe and neutral earthing support.
52b) Fabrication and erection of neutral earthing L Type support made of M.S. Channel size 100×50mm. Structure shall be 4 Mtr. long with 1 Mtr. Arms. Structure shall be grouted in ratio 1:3:6 in block size 300×300×700mm and painted with one coat of Ready Mixed primer and Two coat of enamel Aluminium paint work includes connecting neutral bushing rod of power Transformer and M.S. Earthing strip with the help of flexible copper bond, M.S. Bolt and washer.
53c) Fabrication and erection of cable support made of two pieces of M.S. Angle (50×50×6)/65×65×6) mm, 2.75 meter long, joined to each other by means of 5 Nos. M.S. Flat (50×6)mm pieces of size 150 mm long each by welding at equal intervals and grouting in a block of size (300×300×700)mm in CC 1:3:6 complete with one coat of ready mixed primer and two coats of Al. paint. Work includes providing of three Nos. M.S. clamps made of (50×6)mm M.S. Flat for holding the cable including nuts and bolts.
54d) Fabrication and grouting of M.S. frames 3.60 mt. long for support of copper Bus Bar. Bus Bar will be provided in L.V. Side of Power transformer. The M.S. frame shall be made of M.S. channel (100×50)mm in \"T\" shape. Providing 2 Nos. support of M.S. Angle iron (50×50×6)mm, 0.60 mt. long below the top channel, drilling of 3 Nos. hole on the top channel for fixing of 11 KV pin insulator. The M.S. frame shall be painted with one coat of primer & two coat of aluminum paint and grouting the frame in C.C. ratio 1:3:6 in a block of size (300×300×700)mm. The work also includes the fixing of 3 Nos. 11 KV pin insulator with pin and binding the copper Bus Bar with the pin insulator by Aluminum binding wire in complete.
55e) Supply & Fabrication of copper bus bar of size (2000×50×6)mm in L.V. side of 10MVA 33/11 KV, power transformer. Work includes connection of outside bus bar in L.V. side busing rod of Power Transformer and other side with outdoor 11 KV cable box as well as providing empire tape and H.T. tape etc. for proper insulation work.
56H.T. Power Cable Laying :i) Laying 11 KV, (3x300)/(3×185) mm2 XLPE Cable from power transformer to 11 KV incoming switch gear and in the cable trench and 0.45 m wide, 0.90m depth. Providing 150 mm local sand for cushion beneath and 150 mm above the cable. The cable shall be dully protected by brick. On both side of cable by laying brick along the cable ............. The work includes digging of trenches, laying of cable in under ground trenches, joining of terminal\"s, back filling of earth and testing and commissioning of power cable etc.
57ii) Laying and dressing of 11 KV (3x300)/(3×185) mm2 power cable in air/Trench.
58iii) Providing and Erection of Fixing 150mm dia 2mm thick 2M long G.I.Pipe over 11KV, 3x300Sq.mm XLPE Cable before mounting the 2No. Cable on cable support structure. Work includes fixing of all Clamp.
59Preparation of 11 KV Power Cable ends:i) Making of cable end termination by Heat shrinkable Out door jointing kits suitable for 11KV, 3x300/3x185q.mm XLPE cable. Providing, fixing and crimping of proper size good quality lugs complete in all respect.
60ii) Making of cable end termination by Heat shrinkable indoor jointing kits suitable for 11KV, 3x300/3x185Sq.mm XLPE cable. Providing, fixing and crimping of proper size good quality lugs complete in all respect.
61Control Cable Laying a) Providing of control cable and Laying of different size of (2×2.5)mm2 control cables i.e. from Buchholz realy to Marshalling box Marshalling box to switch gear room, 33 KV CT\"s to CT\"s CT 33 KV, V.C.B. Control Panel Junction Box to 33 KV VCB control panel and control panel to 33 KV VCB outdoor operating mechanism panel from T/F etc. in the cable trench including making proper connection at Buchholz Relay, Marshalling box as per required for installed equipment.
62b) Providing of control cable and Laying of different size of (4×2.5)mm2 control cables i.e. from Buchholz realy to Marshalling box Marshalling box to switch gear room, 33 KV CT\"s to CT\"s CT 33 KV, V.C.B. Control Panel Junction Box to 33 KV VCB control panel and control panel to 33 KV VCB outdoor operating mechanism panel from T/F etc. in the cable trench including making proper connection at Buchholz Relay, Marshalling box as per required for installed equipment.
63c) Providing of control cable and Laying of different size of (6×2.5)mm2 control cables i.e. from Buchholz realy to Marshalling box Marshalling box to switch gear room, 33 KV CT\"s to CT\"s CT 33 KV, V.C.B. Control Panel Junction Box to 33 KV VCB control panel and control panel to 33 KV VCB outdoor operating mechanism panel from T/F etc. in the cable trench including making proper connection at Buchholz Relay, Marshalling box as per required for installed equipment.
64d) Providing of control cable and Laying of different size of (10×2.5)mm2 control cables i.e. from Buchholz realy to Marshalling box Marshalling box to switch gear room, 33 KV CT\"s to CT\"s CT 33 KV, V.C.B. Control Panel Junction Box to 33 KV VCB control panel and control panel to 33 KV VCB outdoor operating mechanism panel from T/F etc. in the cable trench including making proper connection at Buchholz Relay, Marshalling box as per required for installed equipment.
65Testing & commissioning of Power T/F and all 33KV & 11KV switchgears / Panels. providing required No. of technicians with proper testing equipments during commissioning & energisation.
66Providing of M.S Round 32mm dia and Digging of Pits for making delta by laying 32mm. dia M.S.Round in tringle shape. Electric welding on cross joints by providing “U” Clamp in size 25×6mm. of M.S.Flat, with over lap joint by providing M.S.Round-12mm dia, on both sides of over lap joints of M.S.Round, by electric welding. All joints shall be painted with black bituminious paint.
67Earthing of 33KV LA, Neutral link structure, Power T/F body (both side) by providing G.I.Strip in size 50×6mm. with 32mm. dia M.S.Round laid in trench with proper electric welding.
68Installation of 33 KV Isolators :Assembling and installation of line/Bus Isolator on the isolator structure. Adjusting of operating mechanism in proper alignment so as to ensure smooth operation of the same. In case of Line Isolator proper operation of earth links shall also be ensured. The work includes fabrication for proper fixing if required.
69Installation of 33 KV Post Insulators : Installation of 3 Nos. PI on structure. The work includes fabrication for proper fixing, if required.
70Installation of 33 KV Lightening Arrestors ::-Assembling and installation/mounting of 3 Nos. lighting arrestors on the L.A.\"s structure/terminal gantry, complete with earthing and line connections. The work includes fabrication for proper fixing, if required.
71Installation of 33 KV VCBAssembling and installation of 33 KV VCB on the VCB out door structure on the plinth. Adjustment of operating mechanism in proper alignment for smooth operation of the same. The work also includes fabrication of addition arrangement for proper fixing, if required.
72Installation and commissioning of 33 KV C.T.\"s :-Installation of 3 Nos. C.T.\"s on the C.T.\"s structure. The work includes fabrication for proper fixing, if required to complete the work.
73Installation of 33 KV Fuse Set with Structure:Assembling and installation of fuse set on the fuse set structure. The work includes fabrication for proper fixing, if required.
74Installation of 24 V Battery and Battery Charger :Assembling and installation of the cabinet of 24 V battery and battery charger in switch gear control room including grouting of foundation bolts as per drawing of manufacture, including providing the foundation nuts and bolts of proper size. The electrical connection between battery and battery charge with flexible copper lead of size 7/20 SWG shall be done properly. The work includes installation, wiring upto control panel, testing and commissioning complete in all respect.
75Installation of 33 KV P.T.s Installation of 3 nos. P.T.s on P.T. Structure. The work includes any fabrication work for fixing, if required to complete the work.
76Installation of 33 KV VCB Control PanelCarefully and safely shifting of 33 KV VCB control panel from outside of the switch gear room to inside of the switch gear room, grouting with anchor bolts in the floor, work also includes cutting & proper finishing of floor if necessary for completion of work. Placing and fixing of panel on foundation, bolts of proper size in proper position and alignment.
77Testing & commissioning of Power T/F and all 33KV & 11KV switchgears / Panels. providing required No. of technicians with proper testing equipments during commissioning & energisation.
78Construction of SSO\"s approached road with material
79Construction of Control Cable Trench with Material
80Extension of S/S fencing with material
81Painting of Sub-Station Structure & Equipment
82Fabrication charges of Angle, Channel
83Fabrication charges of Strcuture
84Fabrication charges of Bus-bar Gantry
85Laying charges of 11 KV XLPE cable
86Jumpering, including clamping/binding with ACSR Dog/Panther conductor:a) 33 KV Line Insulator to 33 KV bus bar through post insulators
87b) 33 KV Bus bar to 33 KV Bus Isolator.
88c) 33 KV Bus Isolator to Post Insulator
89d) 33 KV Bus Isolator to 33 KV VCB
90e) 33 KV VCB to 33 KV CT
91f) 33 KV Bus-Bar to 33 KV PT
92g) 33 KV CT to 33 KV Fuse Set
9333 KV Fuse Set to 33/11 Power Transformer through 33 KV Lightening Arrestors work includes supply & installation of proper size copper lugs with power Transformer.
94Leveling & dressing of the Switchyard including cutting up rooting of grass/grass vegetation making proper slope watering & ramming.
95Providing & fixing of following 33 KV connecting clamps duly casted made of aluminium alloy complete with G.I. Nut, bolts, washers and spring washers suitable for ACSR Dog Conductora) 33 KV Transformers Clamps
96b) 33 KV Fuse Set Clamps
97c) 33 KV Isolator Clamps
98d) 33 KV Post Insulator Clamps
99e) 33 KV V.C.B. Connecting Clamp
100f) 33 KV C.T. Connecting Clamp
101g) 33 KV P.T. Connecting Clamp
102h) 33 KV Lightning Arrestor Clamps
103i) PG Clamps for Dog to Dog

AI Tender Summary

OUR REF NO 48034337
AUTHORITY Government Departments
TENDER VALUE 24.99 Lakhs
LAST DATE 06-03-2025
Authority
Authority Name Paschimanchal Vidyut Vitran Nigam Limited
Work Description Tender For Work for Increasing Capacity of 33/11 KV Sub-Station Sarsawa Town from 2×10+1×5 MVA to 3×10+1×5 MVA in District Sahararnpur - Safe carriage of following stock material from any stores centres under PVVNL, depending upon the availability of material at Stores Centres, with loading & unloading at both ends respectively.33 KV C.T. 400/200/1-A 2 33 KV PT, 33 KV/110V-1 Phase 3 33KV VCB 800A, 750 MVA 4 33KV VCB 1250A 5 33 KV Fuse Set 6 33KV control panel of Single T/F 7 33 KV Lightning Arrestors 8 33 KV Line Isolator, 800A, 33 KV 9 33 KV Bus Isolator, 800A, 33 KV 10 33 KV Post Insulators 11 Disc Insulators B&S 70 KN, 33 KV 12 Disc Fittings B&S 70 KN, 33 KV for Dog 13 33 KV Pin Insulators 14 33 KV Pins With Nuts 15 ACSR Dog Conductor 16 11 KV XLPE Cable 3×300mm² XLPE 17 11 KV XLPE Cable 3×185mm² XLPE 18 11KV Cable J/kit outdoor type for 3x300mm 19 11KV Cable J/kit indoor type for 3x300mm 20 11KV Cable J/kit outdoor type for 3x185mm 21 11KV Cable J/kit indoor type for 3x185mm 22 24 V Battery with Battery Charger & Cabinet 23 M.S. Angle (75×75×6)mm 24 M.S. Angle (65×65×6)mm 25 M.S. Angle (50×50×6)mm 26 M.S. Channel (125×65)mm 27 M.S. Channel (100×50)mm 28 Isolator StructureFabrication & erection of Isolator structure (Line & Bus)–3 Nos. size of plinth (0.9×0.30×1.0)m as per drawing no. RES-39 a) Excavation of earth for making 04 Nos. pits of size (0.9×0.30×1.0)m 29 b) Fabrication and erection of Isolator structure (Bus & Line) each by using 3.5 m long 04 Nos. of M.S. channel of size (125×65×6)mm with bracing by M.S. Angle (50×50×6)mm size and providing 02 Nos. M.S. Angle (75×75×8)mm and 2.6m long on the top of Channel at both side of Isolator. The work also includes cutting, drilling, welding and proper alignment of the same for completion of work. 30 c) C.C. work in ratio of 1:4:8 (cement, fine sand and brick ballast) of size (0.9×0.3×0.15)m for 04 Nos. pits for making bed after proper ramming etc. 31 d) C.C. work of ratio 1:3:6 (cement, coarse sand and 25 mm stone grit) for pre-fabricated structure of Line and Bus isolator size of plinth (0.9×0.3×1.00)m for 04 Nos. 32 e) 12 mm thick plaster with cement mortar ratio 1:4 (cement & fine sand) of plinth of 0.15 m above ground level. 33 L.A.s/P.I.s,/C.T.s/P.T.s/Fuse Set structure:– (22 Nos)Fabrication & erection of Lightening Arrestors, Post Insulators/Fuse Set, C.T.s structure and Plinth for the same as per drawing No. RES-39 details (Quantity for five structures):–a) Excavation of earth (0.30×0.30×1.0)m for 02 Nos. Pits of above structures. 34 b) Fabrication and erection of L.A.s/P.I.s/C.T.s/Fuse Set structure by using M.S. Channel (125×65) mm size and 3.5 m minimum height with 2 Nos. M.S. Angle (65×65×6/50×50×6)mm size on top of structure for installation L.A.s/P.I.s/C.T.s/Fuse Set. (01 No. each) 35 c) C.C. work in ratio of 1:4:8 (cement, fine sand and brick ballast) of size (0.30×0.30×0.15)m for 02 Nos. pits for making bed for each structure. Work includes proper ramming etc. 36 d) C.C. Work of ratio 1:3:6 (cement, coarse sand and 25 mm size stone grit) for the above plinths for structure of L.A.s, P.I.s/C.T.s/ Fuse Set after ramming of earth of size (0.3×0.3×1.00)m. Over stone pad/bed 37 e) 12 mm thick plaster with cement mortar ratio 1:4 (cement & fine sand) of plinth of 0.15 m above ground level. 38 Plinth for 10 MVA TransformerConstruction of plinth for 10 MVA, 33/11 KV Transformer of size (4.46×3.46×1.0)m (0.50m below ground level and 0.5 m above ground level) as per details & drawing attached:–a) Excavation of earth (4.50×3.50×0.5)m 39 b) Flooring of plinth in C.C. 1:4:8 (cement, sand & brick ballast) for making foundation bed. Size (4.50×3.50×0.15)m 40 c) Ist Class brick work for side walls size 0.345 m wide upto 0.3 M height and 0.23 m wide upto 0.35 m height C.C. ratio of 1:4 (cement & find sand) 41 d) Filling of brick ballast in plinth in ratio 1:4:8 (cement, coarse sand & brick ballast) with proper ramming. Size (4.0×3.0×0.65)m 42 e) R.C.C. work in the top layer of plinth in ratio 1:2:4 in size (4.46×3.46)m and 0.20 m thickness by using MS bar of 12mm dia both ways. The work also includes binding of steel reinforcement. 43 f) Quantity of M.S. Tor of size 12 mm dia required for reinforcement of plinth in R.C.C. work should be 18 nos. bars of 3.4 mtr length and 12 nos. bars of 4.40 mtr. length. Work also includes cutting, bending and laying etc. in the T/F plinth. 44 g) Providing of 90 LBS Rail piece and Grouting of 02 Nos. 90/105 lb. Rail pieces of 3.46 M long and (50×50×6)mm M.S. Angle in R.C.C. work at the top of plinth work also includes cutting of rail and angle pieces etc. 45 h) 12 mm thick plaster with cement mortar ratio 1:4 (cement & fine sand) of plinth of 0.5 M above ground level. 46 Plinth for 33 KV V.C.B. (02 Nos.)Construction of plinth for the structure of 33 KV VCB as per details a) Excavation of earth of size (2.4×1.5×1.0) m pits for construction of plinth. 47 b) Brick Ballast ratio (1:4:8) (cement, sand & brick ballast ) for foundation work (2.4×1.5×0.15)m plinth. 48 c) C.C. work in ratio 1:2:4 (cement, coarse sand &stone grit) of 20mm size for making plinth of size (2.4×1.5×1.00)m and grouting of foundation bolts 04 Nos. for 33 KV VCB. 49 d) 12 mm thick plaster with cement mortar in ratio 1:4 (cement & fine sand) of plinth of 0.15 m above ground level size (2.4×1.5)m. 50 Hiring of D/G Set including carriage, loading, unloading & operating charges (with fuel) at 33/11 KV Substation under construction in case L.T. supply is not available near S/S within prescribed accessible limit.63 KVA, Three phase, D/G Set for fabrication of different structure at Substation. 51 Miscellaneous Electrical works at Newly proposedInstallation of 33/11 KV, 10 MVA Transformer :a) Boring and lowering of G.I. Pipe size 32 mm dia… into the ground up to water level 20 Mtr., with the lower end of solid copper cone Approx 225mm long and 750 gm in weight shall be provided and screwed in pipe as well as bringing out a continuous copper wire 6 SWG from the cone up to the ground surface where it will be bolted to the M.S. earth Strip for Transformer neutral connection, the earth strip will be welded to the G.I. pipe and neutral earthing support. 52 b) Fabrication and erection of neutral earthing L Type support made of M.S. Channel size 100×50mm. Structure shall be 4 Mtr. long with 1 Mtr. Arms. Structure shall be grouted in ratio 1:3:6 in block size 300×300×700mm and painted with one coat of Ready Mixed primer and Two coat of enamel Aluminium paint work includes connecting neutral bushing rod of power Transformer and M.S. Earthing strip with the help of flexible copper bond, M.S. Bolt and washer. 53 c) Fabrication and erection of cable support made of two pieces of M.S. Angle (50×50×6)/65×65×6) mm, 2.75 meter long, joined to each other by means of 5 Nos. M.S. Flat (50×6)mm pieces of size 150 mm long each by welding at equal intervals and grouting in a block of size (300×300×700)mm in CC 1:3:6 complete with one coat of ready mixed primer and two coats of Al. paint. Work includes providing of three Nos. M.S. clamps made of (50×6)mm M.S. Flat for holding the cable including nuts and bolts. 54 d) Fabrication and grouting of M.S. frames 3.60 mt. long for support of copper Bus Bar. Bus Bar will be provided in L.V. Side of Power transformer. The M.S. frame shall be made of M.S. channel (100×50)mm in T shape. Providing 2 Nos. support of M.S. Angle iron (50×50×6)mm, 0.60 mt. long below the top channel, drilling of 3 Nos. hole on the top channel for fixing of 11 KV pin insulator. The M.S. frame shall be painted with one coat of primer & two coat of aluminum paint and grouting the frame in C.C. ratio 1:3:6 in a block of size (300×300×700)mm. The work also includes the fixing of 3 Nos. 11 KV pin insulator with pin and binding the copper Bus Bar with the pin insulator by Aluminum binding wire in complete. 55 e) Supply & Fabrication of copper bus bar of size (2000×50×6)mm in L.V. side of 10MVA 33/11 KV, power transformer. Work includes connection of outside bus bar in L.V. side busing rod of Power Transformer and other side with outdoor 11 KV cable box as well as providing empire tape and H.T. tape etc. for proper insulation work. 56 H.T. Power Cable Laying :i) Laying 11 KV, (3x300)/(3×185) mm2 XLPE Cable from power transformer to 11 KV incoming switch gear and in the cable trench and 0.45 m wide, 0.90m depth. Providing 150 mm local sand for cushion beneath and 150 mm above the cable. The cable shall be dully protected by brick. On both side of cable by laying brick along the cable ............. The work includes digging of trenches, laying of cable in under ground trenches, joining of terminals, back filling of earth and testing and commissioning of power cable etc. 57 ii) Laying and dressing of 11 KV (3x300)/(3×185) mm2 power cable in air/Trench. 58 iii) Providing and Erection of Fixing 150mm dia 2mm thick 2M long G.I.Pipe over 11KV, 3x300Sq.mm XLPE Cable before mounting the 2No. Cable on cable support structure. Work includes fixing of all Clamp. 59 Preparation of 11 KV Power Cable ends:i) Making of cable end termination by Heat shrinkable Out door jointing kits suitable for 11KV, 3x300/3x185q.mm XLPE cable. Providing, fixing and crimping of proper size good quality lugs complete in all respect. 60 ii) Making of cable end termination by Heat shrinkable indoor jointing kits suitable for 11KV, 3x300/3x185Sq.mm XLPE cable. Providing, fixing and crimping of proper size good quality lugs complete in all respect. 61 Control Cable Laying a) Providing of control cable and Laying of different size of (2×2.5)mm2 control cables i.e. from Buchholz realy to Marshalling box Marshalling box to switch gear room, 33 KV CTs to CTs CT 33 KV, V.C.B. Control Panel Junction Box to 33 KV VCB control panel and control panel to 33 KV VCB outdoor operating mechanism panel from T/F etc. in the cable trench including making proper connection at Buchholz Relay, Marshalling box as per required for installed equipment. 62 b) Providing of control cable and Laying of different size of (4×2.5)mm2 control cables i.e. from Buchholz realy to Marshalling box Marshalling box to switch gear room, 33 KV CTs to CTs CT 33 KV, V.C.B. Control Panel Junction Box to 33 KV VCB control panel and control panel to 33 KV VCB outdoor operating mechanism panel from T/F etc. in the cable trench including making proper connection at Buchholz Relay, Marshalling box as per required for installed equipment. 63 c) Providing of control cable and Laying of different size of (6×2.5)mm2 control cables i.e. from Buchholz realy to Marshalling box Marshalling box to switch gear room, 33 KV CTs to CTs CT 33 KV, V.C.B. Control Panel Junction Box to 33 KV VCB control panel and control panel to 33 KV VCB outdoor operating mechanism panel from T/F etc. in the cable trench including making proper connection at Buchholz Relay, Marshalling box as per required for installed equipment. 64 d) Providing of control cable and Laying of different size of (10×2.5)mm2 control cables i.e. from Buchholz realy to Marshalling box Marshalling box to switch gear room, 33 KV CTs to CTs CT 33 KV, V.C.B. Control Panel Junction Box to 33 KV VCB control panel and control panel to 33 KV VCB outdoor operating mechanism panel from T/F etc. in the cable trench including making proper connection at Buchholz Relay, Marshalling box as per required for installed equipment. 65 Testing & commissioning of Power T/F and all 33KV & 11KV switchgears / Panels. providing required No. of technicians with proper testing equipments during commissioning & energisation. 66 Providing of M.S Round 32mm dia and Digging of Pits for making delta by laying 32mm. dia M.S.Round in tringle shape. Electric welding on cross joints by providing “U” Clamp in size 25×6mm. of M.S.Flat, with over lap joint by providing M.S.Round-12mm dia, on both sides of over lap joints of M.S.Round, by electric welding. All joints shall be painted with black bituminious paint. 67 Earthing of 33KV LA, Neutral link structure, Power T/F body (both side) by providing G.I.Strip in size 50×6mm. with 32mm. dia M.S.Round laid in trench with proper electric welding. 68 Installation of 33 KV Isolators :Assembling and installation of line/Bus Isolator on the isolator structure. Adjusting of operating mechanism in proper alignment so as to ensure smooth operation of the same. In case of Line Isolator proper operation of earth links shall also be ensured. The work includes fabrication for proper fixing if required. 69 Installation of 33 KV Post Insulators : Installation of 3 Nos. PI on structure. The work includes fabrication for proper fixing, if required. 70 Installation of 33 KV Lightening Arrestors ::-Assembling and installation/mounting of 3 Nos. lighting arrestors on the L.A.s structure/terminal gantry, complete with earthing and line connections. The work includes fabrication for proper fixing, if required. 71 Installation of 33 KV VCBAssembling and installation of 33 KV VCB on the VCB out door structure on the plinth. Adjustment of operating mechanism in proper alignment for smooth operation of the same. The work also includes fabrication of addition arrangement for proper fixing, if required. 72 Installation and commissioning of 33 KV C.T.s :-Installation of 3 Nos. C.T.s on the C.T.s structure. The work includes fabrication for proper fixing, if required to complete the work. 73 Installation of 33 KV Fuse Set with Structure:Assembling and installation of fuse set on the fuse set structure. The work includes fabrication for proper fixing, if required. 74 Installation of 24 V Battery and Battery Charger :Assembling and installation of the cabinet of 24 V battery and battery charger in switch gear control room including grouting of foundation bolts as per drawing of manufacture, including providing the foundation nuts and bolts of proper size. The electrical connection between battery and battery charge with flexible copper lead of size 7/20 SWG shall be done properly. The work includes installation, wiring upto control panel, testing and commissioning complete in all respect. 75 Installation of 33 KV P.T.s Installation of 3 nos. P.T.s on P.T. Structure. The work includes any fabrication work for fixing, if required to complete the work. 76 Installation of 33 KV VCB Control PanelCarefully and safely shifting of 33 KV VCB control panel from outside of the switch gear room to inside of the switch gear room, grouting with anchor bolts in the floor, work also includes cutting & proper finishing of floor if necessary for completion of work. Placing and fixing of panel on foundation, bolts of proper size in proper position and alignment. 77 Testing & commissioning of Power T/F and all 33KV & 11KV switchgears / Panels. providing required No. of technicians with proper testing equipments during commissioning & energisation. 78 Construction of SSOs approached road with material 79 Construction of Control Cable Trench with Material 80 Extension of S/S fencing with material 81 Painting of Sub-Station Structure & Equipment 82 Fabrication charges of Angle, Channel 83 Fabrication charges of Strcuture 84 Fabrication charges of Bus-bar Gantry 85 Laying charges of 11 KV XLPE cable 86 Jumpering, including clamping/binding with ACSR Dog/Panther conductor:a) 33 KV Line Insulator to 33 KV bus bar through post insulators 87 b) 33 KV Bus bar to 33 KV Bus Isolator. 88 c) 33 KV Bus Isolator to Post Insulator 89 d) 33 KV Bus Isolator to 33 KV VCB 90 e) 33 KV VCB to 33 KV CT 91 f) 33 KV Bus-Bar to 33 KV PT 92 g) 33 KV CT to 33 KV Fuse Set 93 33 KV Fuse Set to 33/11 Power Transformer through 33 KV Lightening Arrestors work includes supply & installation of proper size copper lugs with power Transformer. 94 Leveling & dressing of the Switchyard including cutting up rooting of grass/grass vegetation making proper slope watering & ramming. 95 Providing & fixing of following 33 KV connecting clamps duly casted made of aluminium alloy complete with G.I. Nut, bolts, washers and spring washers suitable for ACSR Dog Conductora) 33 KV Transformers Clamps 96 b) 33 KV Fuse Set Clamps 97 c) 33 KV Isolator Clamps 98 d) 33 KV Post Insulator Clamps 99 e) 33 KV V.C.B. Connecting Clamp 100 f) 33 KV C.T. Connecting Clamp 101 g) 33 KV P.T. Connecting Clamp 102 h) 33 KV Lightning Arrestor Clamps 103 i) PG Clamps for Dog to Dog
Basic Detail
Tender No 17/ECWC1/MRT/2024-25
Bidding Type Tender
Location
City meerut
State Uttar Pradesh
Key Dates
Publish Date 01 Mar 2025
Submission Date 06 Mar 2025
Open Date 07 Mar 2025
Finance
Tender Value 24.99 Lakhs
Tender Fee 3540
EMD 30000
Exemption Not Available
Document List
TenderDocumentsC117.pdf
Tendernotice_1.pdf
c947dc96-d9c5-4609-9a6d-692cd1cdccba.html
BOQ_1815094.xls
FormAandB.pdf

Unlock Full AI Tender Summary

Get instant access to the complete AI-generated analysis — scope, eligibility, timeline & more.

Instant Access Secure Free
Your details are secure and used only for document delivery.

Tender Timeline

Mar 01, 2025
11:30 IST

Tender Published

Tender notice published.

Completed
Mar 06, 2025
17:00 IST

Bid Submission Deadline

Online submission via eProcurement portal.

Completed
Mar 07, 2025

Bid Opening Date

Technical bids will be opened and evaluated.

Completed

Tender Documents

Download All (ZIP) ↓
pdf

TenderDocumentsC117.pdf

pdf

Tendernotice_1.pdf

html

c947dc96-d9c5-4609-9a6d-692cd1cdccba.html

xls

BOQ_1815094.xls

pdf

FormAandB.pdf

Disclaimer

We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender