|
| 1 | CIVIL WORK |
| 2 | Dismentaling of old brick work in drain etc all complet |
| 3 | Earth Work in Excavation for foundations in silty/malva/garbeg soil including dressing and ramming of bottom and disposal of surplus excavated earthas directed by Engg.-In-Ch.SI 251.256 |
| 4 | Providing and laying Cement concrete 1:4:8 mix (1 cement, c/sand, graded STONE aggregate 40 mm) including supply of all materials. Labour and T&P etc.required for proper completion of the work and curing complete, also including cost of formwork in foundation and floors. |
| 5 | M Class-150 brick work in 1 : 3 cement and coarse sandmortar in foundationstructure including supply of all materials, labour and T & P etc. required for proper completion work for one brick wall thickness.SI no 307 |
| 6 | Pro & laying 25 mm thick D.P.C work is 1:2:4 cement, c/sand, s/grite with composil powder etc all complet SINO 361 |
| 7 | M Class-150 brick work in 1 : 3 cement and coarse sandmortar in superstructure including supply of all materials, labour and T & P etc. required for proper completion work for one brick wall thickness etc all complet |
| 8 | 12 mm thick Plaster with 1:3 mix (cement& C/sand mortor)etc all complet . SI 583 |
| 9 | P/Lof Vertified Tiels withbase mortar 1:2 mix (cement,C/sand) and jointing by cement silury etc all complete. |
| 10 | Providing and applying white cement based putty of average thickness 1 mm, of approved brand and manufacturer, over the plastered wall surface to prepare the surface even and smooth complete |
| 11 | Finishing walls with water proof cement paint of approved make and quality on new work with three coats to give an even shade i/c supply of all material , labour and t&p etc.requiredfor proper completion of work. |
| 12 | R.C.C. work with 1:2:4 cement, coarse sand and 20 mm guage approved stone grit to cover the crossing over drain etc all complet.SI NO.284 |
| 13 | M.S. steel bars for R.C.C. work with cutting and bindining etccomp.Sino 504 |
| 14 | 20mm thk. Plain skirting with 1:2 finished with a floating coat of neat cement coat with etc all complet |
| 15 | P/L of C.C. work with 1:2:4 cement, coarse sand and 6.7 mm s/grite on over brick work etc all complet.si no 279( b) |
| 16 | S/ F Of Doorpanel with mica sheel with all accesaries material laboure t& p all com. |
| 17 | DisposalCartage of earth up to 4.0 km distance loding and unloding charge including etc all complet. |
| 18 | 25 mm. thick C.C. flooring 1: 2: 4 plain cement concrete floor with cement, approved coarse snad and 20mm. Graded approved stone laid in panels finished with 3 mm. Floating coat of neat cement or cement and marble dust in 5 : 1 as specified over and including 75mm thk. base concrete consisting of cement, local sand and brick ballast 40mm guage in the proportion of 1:4:8 and removing any over lapping mortar at the joints of the panel if any and giving them a uniform finish including supply of all materials, labour and T&P etc.required for proper completion of the work. |
| 19 | Providing and fixng of chemical tretment in buliding etc all complet |
| 20 | S/F Wiring point for light point fan box,switch ,socket including 1 sqmm copper wire ,board with labour work complet |
| 21 | Head loading of material (30 m each chain)3 chain with loading unloading etc all complet |