| 1 | PART- I : Drilling of 150 mm dia DTH Borewell & It\"s related work at Site |
| 2 | Drilling work with transportation charges :200 / 215 mm dia Borewell drilling work in Soil & Murum Strata / Formation& in hard rock 150 mm dia (Wet Drilling) |
| 3 | Yield Testing of Bore well by Flushing & 90® V Notch system After completion of Bore well by Air Lift Method (For half an hour) |
| 4 | 150 mm dia threaded M.S Casing Pipe M.S.E.R.W. Medium class (As per IS : 1239)4.80 mm thickness with Socket |
| 5 | Lowering & grouting rate for 150 mm dia threaded M.S Casing Pipe, 4.80 mm thickness. |
| 6 | Cap for 150 mm diathreaded M.S. Casing Pipe |
| 7 | 180 mm dia PVC Casing Pipe for 150mm dia DTH borewell (6 Kg/Cm2) As per IS : 4985-1988 |
| 8 | 180 mm dia PVC Casing Pipe for 150mm dia DTH borewell (8 Kg/Cm2) As per IS : 4985-1988 |
| 9 | Lowering, handling & grouting of 180 mm dia PVC Casing Pipe (6 Kg/Cm2 & 8kgCm2)(Up to 12 Mtrs) |
| 10 | Lowering, handling & grouting of 180 mm dia PVC Casing Pipe (6 Kg/Cm2 & 8kgCm2)(Above to 12 Mtrs) |
| 11 | Cap for 180 mm diaP.V.C. Casing Pipe |
| 12 | PART-IIDrilling of 115 mm dia DTH Borewell & Its related work at Site (Surface Bore/ PROBE BORE) |
| 13 | Drilling work with Transportation Charges: 150mm dia Borewell drilling work in Soil/Murum Strata formation with Riming & in hard rock 115 mm diadrilling work (Wet Drilling) |
| 14 | Yield Testing of Bore well by Flushing & 90® V Notch system After completion of Bore well by Air Lift Method (For half an hour) |
| 15 | 125 mm dia threaded M.S Casing Pipe M.S.E.R.W. Medium class (As per IS : 1239)4.80 mm thickness with Socket |
| 16 | Lowering and grouting of 125mm dia threaded M.S Casing Pipe |
| 17 | Cap for 125 mm diathreaded M.S. Casing Pipe |
| 18 | 140 mm dia PVCCasing Pipe for 115mm dia DTH borewell (4 kg /Cm2 ) As per IS : 4985-1988 |
| 19 | 140 mm dia PVCCasing Pipe for 115mm dia DTH borewell(6 kg /Cm2 )As per IS : 4985-1988 |
| 20 | Lowering & grouting of 140 mm dia PVC Casing Pipe (4 kg /Cm2 ) |
| 21 | Lowering & grouting of 140 mm dia PVC Casing Pipe for (6 kg /Cm2 ) |
| 22 | Cap for 140 mm diaP.V.C. Casing Pipe |
| 23 | Labour charges for lowering and lifting of Machine Stand fordrilling work in well & Liftting of cutting material of the work |
| 24 | Lowering bencher and other material from machine and lifting again after completion of work. Also preparing site for unconventinal borewell and moving bencher one borewell site to other. |
| 25 | PART-III : Installation of New Handpump & Construction of Platform on borewell |
| 26 | Installation of Hand Pump India Mark – II / India Mark – III / Extra Deep well / VLOM 50 Pump (with Lowring of Rising Pipe & Connecting Rod) |
| 27 | Excavation for platform -(2.60 Cum) |
| 28 | Refilling of dry Rubble stone-(2.329 Cum) |
| 29 | 1:2:4 (M 150) RCCfor platform-(1.143 cum) |
| 30 | Transportation Charges (Limit of 40 Km.) Per Handpump Installation and Construction of Platform work (Vech : Tempo / Mini Truck) |
| 31 | Painting of Steel Board (Size 9.5 Inches x 5.5 Inches) & Installation of it on new Handpumpfor indication Scheme Name, Fund Name & Year (M.P & M.L.A etc.) |
| 32 | Note- Construction of Handpump Platform should be as per UNICEF Specification & Design |
| 33 | PART-IV : Yield Testing of Borewell By Power Pump |
| 34 | Yield Testing of Borewell by Powerpump (With Electric Generator or By suitable compressor) |
| 35 | Removal & Re-installation of HandPump From Borewell for Hydro- facturing of borewell, Flusing,Special Repair of Borewell, Yield Testing Etc. |
| 36 | PART-V |
| 37 | Rejuvenation,Redrilling,Flushingof 150/115 mm dia borewell with transportation charges |
| 38 | PART-VI : Supply of India Mark - II Hand Pump Set |
| 39 | India Mark II hand pump set confirming to IS no.15500( part-2)/2004] complete with accessories along with 12 No. of medium class riser pipes of 32mm dia nominal bore as per IS 1239 part 2nd 1992, hot dip galvanized screwed & socketed fitted with socket made of seamless or machined from solid bar.(Socket fitted at one end & thread protector at the other end), 12 No. of connecting rod 12 mm dia X 3 mtr long made of bright bar electro galvanized fitted with hexagonal Socket, chain, handle, head, water tank, and third plate with coupler, telescopic stand. |
| 40 | Special Water Chamber Specially design for Dual Pump Installation (Galvanized) |
| 41 | Stainless steel bottom nipple for dual pump. |