Construction Of Kitchen Shed At Government High School Rmsa Of Budni P. M. Village In Mantur Gp Of Mudhol Taluka - Bdktn001 Pigment,Bdktn001 Cudddapah Slab 2.5 Cms Thick,Bdktn001 Mathi/Nandi Wood Scantling,Bdktn001 Hom Of Machinaries For Planing,Bdktn001 Add Cutting And Other Wastage 5Percent,Bdktn001 Mathi/Nandi Wood Planks For Panels 25 Mm Thick,Bdktn001 Add Brush At 1 Percent On Cost Of Paint,Bdktn001 Enamel Metal Paint,Bdktn001 Add Wire Brush, Fine Steel Wool, Putty, Sand Paper, At 3 Percent On Cost Of Paint,Bdktn001 Ready Mix Primer Paint (Ready Mix Red Lead Paint),Bdktn001 Add Hom Of Welding And Grinding Machine At 4 Percent On Material,Bdktn001 Welder Grade I,Bdktn001 Fitter Class I,Bdktn001 Ms Flat,Bdktn001 M.S Rods,Bdktn001 Add Hom Of Welding And Grinding Machine At 2 Percent On Material,Bdktn001 Fabricator,Bdktn001 5.50 Mm Thick Plain Glass,Bdktn001 Chrominum Plated Screws,Bdktn001 Cleat Angles,Bdktn001 Alluminium Handles - 15 Mm,Bdktn001 Alluminium Tower Bolt - 20 Cm,Bdktn001 Pvc Edge Beading,Bdktn001 Rubber Beading For Shutters Beading,Bdktn001 Nylon Rollers,Bdktn001 Aluminium Window Frame Section 1.20 Mm Thick,Bdktn001 Vitrified Tiles 600X600 Mm,Bdktn001 Add Brush, Putty, Sand Paper At 2 Percent On Cost Of Paint,Bdktn001 Water Proofing Cement Paint,Bdktn001 Add Brush, Putty, Sand Paper, Roller At 5 Percent On Cost Of Paint,Bdktn001 Plastic Emulsion Paint,Bdktn001 Painter Class I,Bdktn001 Add Brush, Putty At 5 Percent On Cost Of Distemper Primer,Bdktn001 Distemper Primer,Bdktn001 Add Providing And Removing Scaffolding At 3 Percent On Labour,Bdktn001 Burnt Bricks Class 35 (Non Modular),Bdktn001 Add Handling , Loading And Unloading At 1 Percent On Material,Bdktn001 Stone Chistler Class Ii,Bdktn001 Boulders,Bdktn001 Size Stone 20 X 20 X 25 Cms,Bdktn001 Mason Class Ii (With Tools),Bdktn001 Mason Class I (With Tools),Bdktn001 Mixer (Concrete Small Used In Culvert),Bdktn001 Bond Stone 20 X 20 X 45 Cm,Bdktn001 Rubble Stones,Bdktn001 Binding Wire,Bdktn001 Tmt Bars Fe 500,Bdktn001 Casurina Poles 75 - 100 Mm Dia,Bdktn001 Add Sundries Charges At 2 Percent On Material,Bdktn001 Add Handling , Loading And Unloading At 2 Percent On Material,Bdktn001 Casurina Poles 100 - 150 Mm,Bdktn001 Silver Oak Or Equivalent Planks 38 Mm Thick,Bdktn001 Jungle Wood Runners And Planks,Bdktn001 Hom Of Vibrator 0.71 Days,Bdktn001 Plasticizer / Super Plasticizer,Bdktn001 Add Watering Charges At 1 Percent On Material,Bdktn001 Mixer (Concrete) - 1 Cum Capacity,Bdktn001 Portland Cement,Bdktn001 Coarse Sand (Zone Iii),Bdktn001 Broken Stone Aggregate 12 Mm To 10 Mm Size,Bdktn001 Broken Stone Aggregate 20 Mm Size,Bdktn001 Over Head And Other Miscellaneous Charges,Bdktn001 Add Sundries Charges At 1 Percent On Material