Construction Work Of Rural Godown In Kulali Gp At Mudhol Taluka - Klulks Add Sundries Charges 1 Percent On Material,Klulks Transportation/Loading And Unloading Of Materiallifting Of Material/Centering Charges Wherever Necessary/Over Head/Wastage/Unforeseen Charges/Miscellaneous Which Are Necessary During Execution,Klulks Kullalli Broken Srone Aggregate 40 Mm Size,Klulks Kullalli Broken Srone Aggregate 20 Mm Size,Klulks Kullalli Broken Srone Aggregate 12 Mm To 10 Mm Size,Klulks Coarse Sand (Zone Iii),Klulks Portland Cement,Klulks Mixer (Concrete) - 1 Cum Capacity,Klulks Add Watering Charges At 1 Percent On Material,Klulks Plasticizer / Super Plasticizer,Klulks Hom Of Vibrator 0.71 Days,Klulks Size Stone 20 X 20 X 25 Cms,Klulks Bond Stone 20 X 20 X 45 Cm,Klulks Boulders,Klulks Mixer (Concrete Small Used In Culvert),Klulks Mason Class I (With Tools),Klulks Mason Class Ii (With Tools),Klulks Stone Chistler Class Ii,Klulks Casurina Poles 100 -150 Mm,Klulks Add Handling Loading And Unloading At 1 Percent On Material,Klulks Add Sundries Charges 2 Percent On Material,Klulks Add Sundries Charges 1 Percent On Labour,Klulks Add Watering Charges At 1 Percent On Labour,Klulks Burnt Bricks Of Class Designation 35 Modular,Klulks Ms Sheet 20 Gauge,Klulks Fitter Class I,Klulks Ready Mix Primer Paint (Ready Mix Red Lead Paint),Klulks Add Wire Brush Fine Steel Wool Putty Sand Paper At 3 Percent On Cost Of Paint,Klulks Painter Class I,Klulks Add Providing And Removing Sccaffolding At 3 Percent On Labour,Klulks Add Handling Loading And Unloading At 2 Percent On Labour,Klulks Add Hom Of Welding And Grinding Machine At 2 Percent On Material,Klulks 18 Guage 75Mm Ms Laths Of 2.8 M Length,Klulks Side Guides,Klulks Suspension Shaft,Klulks Ms Side Shed Clamps,Klulks High Tension Coil,Klulks Ball Bearing For Rolling Shutters,Klulks Center Pully,Klulks Locking Arrangements,Klulks Ms Handles,Klulks Bottom Lock Nail,Klulks T Section,Klulks Mullion Section,Klulks Ms Clamps,Klulks Handles,Klulks Hinges 5 Inch Heavy Duty,Klulks Stays,Klulks Tw Beading For Fixing Glass,Klulks Reeded Glass 2Mm Thick,Klulks Z Section,Klulks Welder Grade I,Klulks Add,Klulks Tmt Bars Fe 500,Klulks Binding Wire,Klulks Silver Oak Or Equivalent Planks 38Mm Thick,Klulks Jungle Wood Runners And Planks,Klulks Casurina Poles 75 - 100 Mm Dia,Klulks Ms Angle Iron 50Mm X 50Mm X 6Mm 33.8 Metre In Length At 4.5Kg Per Metre,Klulks Ms Angle Iron 40Mm X 40Mm X 6Mm 33.8 Metre In Length At 3.5Kg Per Metre,Klulks Gusset Plates 6 Mm Thick,Klulks Base Plate / Base Plate,Klulks Anchor Bolts 750Mm,Klulks Carbon Electrodes,Klulks Hom Of Welding And Grinding Machine,Klulks Hom Of Cutting And Grinding Machine,Klulks Enamel Metal Paint,Klulks Add Brush At 1 Percent On Cost Of Paint,Klulks Tools And Plants And Electrical Charges At 2 Percent,Klulks Ac Sheet 6Mm Thick Corrugated,Klulks Gi J L Hook With Nuts And Bolts 8Mm Dia,Klulks Gi Washers,Klulks Bitumen Washer,Klulks Broken Granite Metal 12.5 Mm,Klulks Broken Granite Metal 10 Mm,Klulks Dry Distemper,Klulks Whitening,Klulks Add Brush Puty Glue At 5 Percent On Cost Of Paint,Klulks Water Proofing Cement Paint,Klulks Add Brush Putty Sand Paper At 2 Percent On Cost Of Paint,Klulks The Cost Of All Materials Centering Transportation Fixing Wastage And Other Extra Charges Etc Excluding The Cost Of Unskilled Labour