Construction Work Of Rural Godown In Kulali Gp At Mudhol Taluka - Klulks The Cost Of All Materials Centering Transportation Fixing Wastage And Other Extra Charges Etc Excluding The Cost Of Unskilled Labour,Klulks Add Brush Putty Sand Paper At 2 Percent On Cost Of Paint,Klulks Water Proofing Cement Paint,Klulks Add Brush Puty Glue At 5 Percent On Cost Of Paint,Klulks Whitening,Klulks Dry Distemper,Klulks Broken Granite Metal 10 Mm,Klulks Broken Granite Metal 12.5 Mm,Klulks Bitumen Washer,Klulks Gi Washers,Klulks Gi J L Hook With Nuts And Bolts 8Mm Dia,Klulks Ac Sheet 6Mm Thick Corrugated,Klulks Tools And Plants And Electrical Charges At 2 Percent,Klulks Add Brush At 1 Percent On Cost Of Paint,Klulks Enamel Metal Paint,Klulks Hom Of Cutting And Grinding Machine,Klulks Hom Of Welding And Grinding Machine,Klulks Carbon Electrodes,Klulks Anchor Bolts 750Mm,Klulks Base Plate / Base Plate,Klulks Gusset Plates 6 Mm Thick,Klulks Ms Angle Iron 40Mm X 40Mm X 6Mm 33.8 Metre In Length At 3.5Kg Per Metre,Klulks Ms Angle Iron 50Mm X 50Mm X 6Mm 33.8 Metre In Length At 4.5Kg Per Metre,Klulks Casurina Poles 75 - 100 Mm Dia,Klulks Jungle Wood Runners And Planks,Klulks Silver Oak Or Equivalent Planks 38Mm Thick,Klulks Binding Wire,Klulks Tmt Bars Fe 500,Klulks Add,Klulks Welder Grade I,Klulks Z Section,Klulks Reeded Glass 2Mm Thick,Klulks Tw Beading For Fixing Glass,Klulks Stays,Klulks Hinges 5 Inch Heavy Duty,Klulks Handles,Klulks Ms Clamps,Klulks Mullion Section,Klulks T Section,Klulks Bottom Lock Nail,Klulks Ms Handles,Klulks Locking Arrangements,Klulks Center Pully,Klulks Ball Bearing For Rolling Shutters,Klulks High Tension Coil,Klulks Ms Side Shed Clamps,Klulks Suspension Shaft,Klulks Side Guides,Klulks 18 Guage 75Mm Ms Laths Of 2.8 M Length,Klulks Add Hom Of Welding And Grinding Machine At 2 Percent On Material,Klulks Add Handling Loading And Unloading At 2 Percent On Labour,Klulks Add Providing And Removing Sccaffolding At 3 Percent On Labour,Klulks Painter Class I,Klulks Add Wire Brush Fine Steel Wool Putty Sand Paper At 3 Percent On Cost Of Paint,Klulks Ready Mix Primer Paint (Ready Mix Red Lead Paint),Klulks Fitter Class I,Klulks Ms Sheet 20 Gauge,Klulks Burnt Bricks Of Class Designation 35 Modular,Klulks Add Watering Charges At 1 Percent On Labour,Klulks Add Sundries Charges 1 Percent On Labour,Klulks Add Sundries Charges 2 Percent On Material,Klulks Add Handling Loading And Unloading At 1 Percent On Material,Klulks Casurina Poles 100 -150 Mm,Klulks Stone Chistler Class Ii,Klulks Mason Class Ii (With Tools),Klulks Mason Class I (With Tools),Klulks Mixer (Concrete Small Used In Culvert),Klulks Boulders,Klulks Bond Stone 20 X 20 X 45 Cm,Klulks Size Stone 20 X 20 X 25 Cms,Klulks Hom Of Vibrator 0.71 Days,Klulks Plasticizer / Super Plasticizer,Klulks Add Watering Charges At 1 Percent On Material,Klulks Mixer (Concrete) - 1 Cum Capacity,Klulks Portland Cement,Klulks Coarse Sand (Zone Iii),Klulks Kullalli Broken Srone Aggregate 12 Mm To 10 Mm Size,Klulks Kullalli Broken Srone Aggregate 20 Mm Size,Klulks Kullalli Broken Srone Aggregate 40 Mm Size,Klulks Transportation/Loading And Unloading Of Materiallifting Of Material/Centering Charges Wherever Necessary/Over Head/Wastage/Unforeseen Charges/Miscellaneous Which Are Necessary During Execution,Klulks Add Sundries Charges 1 Percent On Material