Tender for Running Deposit Works For Annual Deposit Work - Loading unloading & carriage of material from store KESCo to work site. /Erection of Material 2 Loading, Carriage and unloading of ST poles including old & used S.T. Pole from store to work site or vice-versa. 3 Erection of Single/Stud Pole including fitting of all material. 4 Erection of Double pole structure as per standard specifications including fitting of all material. (Cross bracings, Top Channel, Bottom Channel etc.) 5 Erection of Double pole structure from existing Single Pole including fitting of M.S. Channel and other accessories etc. 6 Grouting of pole with cement brick ballast and coarse sand as per standard specification including cost of all material. 7 Making of pole plinth of 400 mm dia, 400 mm height with C.C. in ratio 1:4:8 of cements, stone ballast and coarse sand including cost of materials. 8 Fabrication/modifications of M.S. Items as per requirement of site conditions. 9 Painting of M.S.structures fitted on single pole such as channel,angle, brackets including cost of all material. 10 Painting of M.S.structures fitted on double pole structure such as channel,angle, cross bracing including cost of all material. 11 Painting of Steel Tubular Pole with one coat of red oxide and two coats of first enamel Alm. Paint upto fuse set including cost of all materials. 12 Dismentalling of ST Pole including all fitting such as V-Type X-arm/M.S Channel/ Guarding Angle/LT Bracket, insulators etc. 13 Earthing of poles as per standard specifications. 14 Fixing of stay rod and its erection and grouting by fitting of stay clamp. Stay wire and its proper binding and tightening etc. 15 Loading, Carriage and unloading of ACSR/ Panther Conductor from store to work site or vice-versa. 16 Loading, Carriage and unloading of Earth wire/G.I. wire from store to work site or vice-versa. 17 Laying, stringing, tensioning & final sagging of 3 Phase 3 Wire H.T. O.H. line. 18 Laying, stringing, tensioning & final sagging of 3 Phase 4 Wire L.T. O.H. line. 19 Laying, stringing, tensioning & final sagging of Earth wire/G.I. wire including of cross lacing in every 2.5 mtr. 20 Dismentalling of binding wire from insulators and loosening of the ACSR mixed conductor on each pole then lowering down the ACSR mixedconductor & rolling into bundles. 21 Opening of H.T. Jumpers from the existing 3 Phase 3 Wire H.T. O.H. line for erection work. 22 Opening of L.T. Jumpers from the existing 3 Phase 4 Wire L.T. O.H. line for erection work. 23 Loading, Carriage and unloading of LT/HT (3*70 sqmm/3.5*70 sqmm to 3*400 sqmm/3.5*400 sqmm) cable from store to work site or vice-versa. 24 Digging of Trench for laying of LT/HT (3*70 sqmm/3.5*70 sqmm to 3*400 sqmm/3.5*400 sqmm) cable in normal soil in size of 30 cm. wide and 0.5 to 1.5 meter deep. 25 Digging of Trench for laying ofLT/HT (3*70 sqmm/3.5*70 sqmm to 3*400 sqmm/3.5*400 sqmm)cable in kharanja soil in size of 30 cm. wide and 0.5 to 1.5 meter deep. 26 Digging of Trench for laying of LT/HT (3*70 sqmm/3.5*70 sqmm to 3*400 sqmm/3.5*400 sqmm)cable in metallic road in size of 30 cm. wide and 0.5 to 1.5 meter deep. 27 Laying of LT/HT (3*70 sqmm/3.5*70 sqmm to 3*400 sqmm/3.5*400 sqmm)XLPE Cable in digged trench covering with bricks and back filling and proper ramming. 28 Laying of LT/HT (3*70 sqmm/3.5*70 sqmm to 3*400 sqmm/3.5*400 sqmm)XLPE Cable through GI/MS/HDPE pipe in digged trench. 29 Laying ofLT/HT (3*70 sqmm/3.5*70 sqmm to 3*400 sqmm/3.5*400 sqmm) XLPE through HDD Method With GI/MS/HDPE Pipe 30 Laying ofLT/HT (3*70 sqmm/3.5*70 sqmm to 3*400 sqmm/3.5*400 sqmm)XLPE through HDD Method Without Pipe 31 Laying of HT 3x70 mm2Cable Over head (Pole to Pole)with Fixing of Holding Clampon existing /newly erected ST Pole with stay wire 32 Laying of HT 3x185 mm2Cable Over head (Pole to Pole)with Fixing of Holding Clampon existing /newly erected ST Pole with stay wire 33 Laying of HT 3x300 mm2Cable Over head (Pole to Pole)with Fixing of Holding Clampon existing /newly erected ST Pole with stay wire 34 Making indoor/outdoor joints of LT/HT (3*70 sqmm/3.5*70 sqmm to 3*400 sqmm/3.5*400 sqmm)XLPE Cable where the cable is being laid. 35 Making straight through joint of LT/HT (3*70 sqmm/3.5*70 sqmm to 3*400 sqmm/3.5*400 sqmm)XLPE Cable where the cable is being laid. 36 Mounting of LT/HT ((3*70 sqmm/3.5*70 sqmm to 3*400 sqmm/3.5*400 sqmm) XLPE Cable on pole.. 37 Mounting of LT/HT (3*70 sqmm/3.5*70 sqmm to 3*400 sqmm/3.5*400 sqmm) XLPE Cable through GI/MS/HDPE pipe 38 Loading, carriage and unloading of Aearial Bunched Cable all size from store to work site or vice-versa. 39 Laying of LT Aerial Bunched Cableincluding fixing suspension clamp with eye hook , Dead end clamp with Eye hook on erected Steel Tubular Poleetc. 40 Mounting & Erection of single phase distribution box of AB Cable with Piercing Connector, L.T. Bare Neutral Connector, Alu. Lug 25 mm, L.T. Cable 1x25 mm etc. 41 Mounting & Erection of three phase distribution box of AB Cablewith Piercing Connector, L.T. Bare Neutral Connector, Alu. Lug 25 mm, L.T. Cable 1x25 mm etc. 42 Opening and reconnection of consumer service connections after replacement of line/ poles etc. 43 Erection of Distribution T/F upto 630 KVA on plinth/double pole structure. 44 Connection of H.T. Jumper from fuse set to H.T. Bushing of the transformer. 45 Fitting of L.T. D.B./LT CKT by brackets & clamps on double pole structure & L.T. Cable Connection from T/F Cable to L.T.D.B./LT CKT. 46 Connection of L.T. cable from L.T.D.B/LT CKT. to L.T.O.H. 47 Making of H.T. Section points by brackets, clamps & Insulator, tightening of Line, binding of conductor & proper connection. 48 Making of H.T. Jumpers with3 Phase 3 Wire H.T. O.H. line after erection of work. 49 Making of L.T. Section points by brackets, clamps & Insulator, tightening of Line, binding of conductor & proper connection. 50 Making of L.T. Shackle point by brackets, clamps, G.I. Shakle strips and insulators, tightening of line, binding of conductors and proper connections. 51 Dismentalling of LT/HT (3*70 sqmm/3.5*70 sqmm to 3*400 sqmm/3.5*400 sqmm) cable on each pole then lowering down the cable & rolling into bundles. 52 Making of L.T. Jumpers from 3 Phase 4 Wire L.T. O.H. line for erection work. 53 Chopping of tree branches lying in the route of HT/LT line touching the tree branches to the phase line conductor making fault to the feeder, for 75mm dia to 450mm dia or as per requirement of site. 54 Deep Bore GI Pipe Earthing including supply Size GI Pipe 40mm dia B-Class 60 feet long with socket cutter and connection of pipe to distribution T/F Neutral or Body with 50*5 mmsq GI strip all material shall be provided by contractor with cost of all material. 55 Deep Bore GI Pipe Earthing including supply Size GI Pipe 40mm dia B-Class 80 feet long with socket cutter and connection of pipe to distribution T/F Neutral or Body with 50*5 mmsq GI strip all material shall be provided by contractor with cost of all material. 56 Fabrication, erection & grouting of T/F fencingof frame size 3x2.4 mtr. including cost of M.S. Angle size 40x40x5 and M.S. Flat size 35x5, fixing of welded steel wire fabric on steel frames by welding of 10 SWG wire fabric, including Painting fo two coats of paint on iron based surfaces with ready mixed paint to give bus green shade including cleaning of oil and dust. 57 Connecting of newly erected network with Kesco mains including testing, commissioning and energization of the same completely. 58 Restoration of Metallic/RCC road after proper repairing with appropriate materials. 59 Stringing of Single Core L.T. Cable 60 Stringing of 3 ½ Core L.T. Cable 61 Construction of T/F plinth, suitable for mounting of distribution transformer. Size of the plinth will be 1.2 x 1.2 x 1.2 meter solid with brick work. 75 mm thick C.C. in ratio 1:3:6 with cement, coarse sand and brick ballast laid on the base and 75 mm thick done on all the exposed sides to the plinth. 62 Digging of Pit 2x2x1 mtr. for laying of cable through HDD Method. 63 Fixing of danger board on erected poles 64 Construction of plinth for H.T. pilffer metering cubical. 65 Loading,Carriage and unloading of H.T. metering cubical from store to site or vice-versa 66 Loading,Carriage and unloading of H.T. O/D type metering unit all range from store to site or vice-versa 67 Erection of O/D type metering unit on D/P structure 68 All electrical Connection of O/D unit and Metering cubical as perstandard norms. 69 Erection of H.T. metering cubical on plinth as per standard norms. 70 Deep Bore GI Pipe Earthing including supply Size GI Pipe 40mm dia B-Class 40 feet long with socket cutter and connection of pipe to O/D unit and metering cubical Body with 25*3 mmsq GI strip all material shall be provided by contractor with cost of all material. 71 Fixing of T.P.M.O on D/P structure. 72 Making and Fixing of D.O. fuse set/ H.T. fuse on D/P structure. 73 Loading,Carriage and unloading of distribution T/ffrom store to site or vice-versa 74 Loading,Carriage and unloading other material from store to site or vice-versa 75 Earthing of Pole for double metering work.