| 1 | Main Item - Supply, Installation, Testing and Commissioning along with Loading, Unloading, Transport, Transit Insurance etc. - Details as per Section V of the tender document |
| 2 | Civil and allied works |
| 3 | UPS 2 X 300 KVA |
| 4 | SMF Batteriesfor 2 X 300 KVA along with Battery Stand, Isolator, DC cabling etc. |
| 5 | UPS 2 X 755 KVA |
| 6 | SMFBatteries for 2 X 755 KVA along with Battery Stand, Isolator, DC cabling etc. |
| 7 | LVElectrical Components , AllLT Panels, DBs, Bus bars, End feed units, Tap off boxes, Isolator Panels, ATS Panels etc. |
| 8 | All LT Cabling –Power and Control, Earthing, , Cable Trays, SS Cable Tray, Supports, Cable terminations, Glands and other accessories etc. |
| 9 | Internal Illumination System along with DBs |
| 10 | Free Cooling Chillers along with piping, Pumps, Thermal Storage Tank, Air Separator, Expansion Tanks, All types of valves and Acutators etc. to complete the job |
| 11 | Rear Door heat Exchanger -30 KW and 15 KW complete along with hose and accessories etc. |
| 12 | 2 X 15 Tr DX based PAC unit along with all accessories including CU piping ODU unit etc. |
| 13 | Chilled Water Based PAHU unit 2 X 5 Tonss in Battery room |
| 14 | Fire Alarm system for Data Center areaand UPS area including Detectors, panels, cabling and associated accessories etc. |
| 15 | Fire Suppression system for Data Center area including Gas release panel, cylinder, Manifold, piping and associated accessories etc. |
| 16 | NOVEC Gas for Data center area |
| 17 | Fire Suppression system for UPSarea including Gas release panel, cylinder, NOVEC, Gas, Manifold, piping and associated accessories etc |
| 18 | NOVEC Gas for UPSarea |
| 19 | IBMS software includingsystem ( Computer ,Monitor) integration of third party devices, I/O modules, all control and communication cabling etc. |
| 20 | Other IBMS including Water leak detectors, Rodent Repellent, VesdaWater quality sensor system |
| 21 | Server Rack -45U along withDuel PDU ,cable manager and blanking plates , Branding, |
| 22 | Any other item, material required to complete the solution |
| 23 | Operation and Maintenance –Year-1 |
| 24 | Operation and Maintenance –Year-2 |
| 25 | AMC- Operation and Maintenance –Year-3 |
| 26 | AMC- Operation and Maintenance –Year-4 |
| 27 | AMC- Operation and Maintenance –Year-5 |