| 1 | Painting with enamel paint of approved quality and shade over surface with two coats over one coat of primer (ground floor) |
| 2 | Painting with enamel paint of approved quality and shade over surface with two coats over one coat of primer(1st floor) |
| 3 | Painting two coats to walls with weathercoat of approved shade including all cost ,conveyance and royality etc complete as per direction of EIC |
| 4 | Finishing wall surface with cement based wall putty(water based )of approved make and finished smooth and even surface to receive painting including cost of scaffolding ,stagging charges with cost of all materials ,taxes,labour T & P etc |
| 5 | Wall painting two coats with plastic emulsion paint of appoved shade on new work to give an even shade including cost of paint(for 10sqm) |
| 6 | Painting 2 coats to walls with weather coat of approved shade including all cost ,conveyance and royality etc as per direction of EIC |
| 7 | Finishing surface of walls with cement based wall p utty (water based ) of approved make and finished smooth and even surface to receive painting including cost of scafffolding stagging charges with cost of all materials,taxes labour,,T & P etc complete |
| 8 | Wall painting 2 coats with plastic emulsion paint of approved shade on new work to give an even shade Inculding cost of paint (For 10 Sqm.) 1st floor |
| 9 | 4 cm grading concrete (1:2:4) on roof slab with 12mmand down graded size black hard granite chips fo old work per 1 sqm |
| 10 | Dismantling and removing 2.5 cm thick gradingconcrete from roof slab |
| 11 | Earhwork in excavation in hard soil within initial lead and lift including ough dressing and breaking clods to max 5cm to 7 cm sizes and laying in layes |
| 12 | Filling in foundation and plinth with excavated materials including watering,ramming as directed by EIC |
| 13 | Cementconcrete (1:3:6)with 4cmsizehard granite metal per 1cum |
| 14 | Reinforced cement concrete work of M20 grade with 20mm and down graded black hard ganite (crusher broken )stone chips including hoisting and laying including cost conveyance taxes and royality of all materials and labour with T & P complete in all respect |
| 15 | Drainbase |
| 16 | drainwall |
| 17 | coverslab |
| 18 | existing drain cover slab |
| 19 | Kitchen Shed Plinth |
| 20 | Supplying ,fitting,and placing uncoated MS reinforcement as per drawing and specification |
| 21 | Rigid and Smooth centering and shuttering for RCC Works. |
| 22 | Cementconcrete (1:2:4) using 12mm to 20mm sizehard granite metal per 1cum |
| 23 | Flyassh brickwork in CM (1:6) in super structure |
| 24 | Providing 12mm thick CP(1:6) to Outside smooth surface |
| 25 | Providing 16 mm thick CP(1:6) to Outside smooth surface |
| 26 | Dismantling and removing old tiled flooring including removing the base coarse and stacking the useful materials for reuse and removing the debris within 50m lead |
| 27 | Floor tiles of Toilet/Bathroom |
| 28 | Wall Tiles of toilet and Bathroom |
| 29 | Fixing tiles in floors trades or steps and landing on 25mm bed of cement mortar 1:1 jointed with neat cement slury mixed with pigment to match the shade of the tiles including rubbing and polishing complete excluding cost of precast tiles per 1sqm (data for 10sqm) |
| 30 | Glazed Tiles 30cm x 30cm Floor Tiles |
| 31 | Fixing tiles in dados striking and rises of steps on 12mm cement plaster ( 1:3 ) jointed with neat cement slury mixed with pigment to match the shade of the tiles including rubbing and polishing complete excluding cost of precast tiles per 1sqm (data for 10sqm) |
| 32 | Glazed Tiles20cm x 30cm Wall Tiles |
| 33 | Supplying and welding of Iron work wrought and put up in Trusses and record Racks etc all complete. |
| 34 | Labour for fixing G.C.I. sheet in roof drilling holes in windtisincluding fixing of ridges. (0.40mm thick) |
| 35 | Providing fitting, fixing of Al. door with anodized Al. door section of 9202 as vertical member,9201 as top member and 9200 as bottom and middle member with frame section as 9221 with tapered clip No.4660 and the frame to be completed by means of jointing angle No. 1855including all cost of labour,T&P ,hirechargesofdrillingmachine,labour charges etc.complete.excluding cost of laminated board |
| 36 | Supplying,fitting,fixingupwindow(sliding type) madeup aluminumSection9778, as windows frame section No. 4095,4096 and 9777,3994 as shutter frame with5mmthickblackglass aspanel fitted arrangementincludingallfittingincluding cost of materials all taxes labour, T&P including cost of glassetc.completeasperdirectionofEngineer-in-charge. |
| 37 | Iron work for door, window, grills, welding, Labour, carrrage placing in position etc complete . |