}

Work Of Bifurcation And Construction Of 11 Kv Line, Construction Of 11/0.4 Kv Substation, Increasing Capacity Of11/0.4 Kv Substations, Fortification Work Of 11 Kv Line, Fortification Of 33/11 Kv Substations Under Business Plan Scheme 2024-25 (Part-2) In T, Ghaziabad-Uttar Pradesh

Government Departments has published Work Of Bifurcation And Construction Of 11 Kv Line, Construction Of 11/0.4 Kv Substation, Increasing Capacity Of11/0.4 Kv Substations, Fortification Work Of 11 Kv Line, Fortification Of 33/11 Kv Substations Under Business Plan Scheme 2024-25 (Part-2) In T. Submission Date for this Tender is 13-11-2024. Civil Work Tenders in Ghaziabad Uttar Pradesh. Bidders can get complete Tender details and download the document.




Tender Notice

46086326
Work Of Bifurcation And Construction Of 11 Kv Line, Construction Of 11/0.4 Kv Substation, Increasing Capacity Of11/0.4 Kv Substations, Fortification Work Of 11 Kv Line, Fortification Of 33/11 Kv Substations Under Business Plan Scheme 2024-25 (Part-2) In T
Open Tender
Indian
Uttar Pradesh
Ghaziabad
13-11-2024

Tender Documents

Tender Details

work of bifurcation and construction of 11 kv line, construction of 11/0.4 kv Substation, increasing capacity of11/0.4 kv substations, fortification work of 11 kv line, fortification of 33/11 kv substations Under Business Plan Scheme 2024-25 (Part-2) in the area of EUDD-IV, EUDD-VII, EUDD-X, Ghaziabad. Under the jurisdiction of SE, EUDC-III, Ghaziabad.- 1 Carriage of 250 kva 11/0.4 kv New from Store center to various work site loading and unloading both side. distance 1 km to 50 km. 2 Carriage of ST Pole 11 Mtr long from Store center to various work site loading and unloading both side. distance 1 km to 50 km. 3 Carriage of Pcc Pole 8.5 Mtr long from Store center to various work site loading and unloading both side. distance 1 km to 50 km. 4 Carriage of Pcc Pole 11 Mtr long from Store center to various work site loading and unloading both side. distance 1 km to 50 km. 5 Carriage of ABC (3x120+1x95+1x16) Sqmm from Store center to various work site loading and unloading both side. distance 1 km to 50 km. 6 Carriage of ACSR Dog Conductor from Store center to various work site loading and unloading both side. distance 1 km to 50 km. 7 Carriage of 3 Phase Distributiong Box from Store center to various work site loading and unloading both side. distance 1 km to 50 km. 8 Carriage of Cable All. 3x185 Sqmm XLPE 11 kv from Store center to various work site loading and unloading both side. distance 1 km to 50 km. 9 Carriage of LT XLPE Cable All. 1x400 Sqmm from Store center to various work site loading and unloading both side. distance 1 km to 50 km. 10 Carriage of LT XLPE Cable All. 1x240 Sqmm from Store center to various work site loading and unloading both side. distance 1 km to 50 km. 11 Carriage of 11 kv VCB I/C CTR 600/300/5 A 350 MVA from Store center to work site loading and unloading both side. distance 1 km to 50 km. 12 Carriage of 11 kv VCB O/G CTR 200/100/5 A, 350 MVAfrom Store center to various work site loading and unloading both side. distance 1 km to 50 km. 13 Carriage of ACSR Weasel Conductor from Store center to various work site loading and unloading both side. distance 1 km to 50 km. 14 Carriage of other line material as:- Earthing Rod- 12 Nos, Earthing of Pole- 4 Nos, 11 kv Polymeric Disc Insulator- 18 Nos, 11 kv Polymeric Disc Insulator with Fitting- 54 Nos, Disc Fitting 45 KN- 18 Nos, 11 kv Polymeric Pin Insulator- 261 Nos, 11 kv X Arm V Type- 42 Nos, Stay Set Complete- 15 Nos, D.O Fuse Set 11 Kv- 3 Nos, 11 kv TPMO Set- 3 Nos, 11 kv Cable Jointing Kit (3x185 Sqmm) O/D- 60 Nos, 11 kv Cable Jointing Kit (3x185 Sqmm) I/D- 2 Nos, 11 kv Fuse Set- 2 Nos, MS Angle 65x65x6 MM For GI Pipe Support- 280 Kg, MS Channel 100x50- 900 Kg ...etc.. from Store center to work site loading and unloading both side. distance 1 km to 50 km. 15 Dismantling of ACSR Weasel Condutor/GI Scrap and Safley carriage from work site to Store center/JE store loading and unloading both side. 16 Dismantling of Gatar Pole Damage and Safley carriage from work site to Store center/JE store loading and unloading both side. 17 Dismantling of ST Pole Damage and Safley carriage from work site to Store center/JE store loading and unloading both side. 18 Dismantling of MS Scrap and Safley carriage from work site to Store center/JE store loading and unloading both side. 19 Dismantling of 100 Kva O/D T/F and Safley carriage from work site to Store center/JE store loading and unloading both side. 20 Erection of ST pole 11 Mtr long at site complete in all respect as per RESPO norms. 21 Erection of PCC pole 11 Mtr long at site complete in all respect as per RESPO norms. 22 Erection of PCC pole 8.5 Mtr long at site complete in all respect as per RESPO norms. 23 Providing Concreating of Pole complete in all respect as per RESPO norms. 24 Providing and construction of plinth for 2x2x1.5 M for Transformer with Material at various site complete in all respect as per RESPO norms. 25 Mounting & Safely placing of 250 kva new Transformer on the plinth by the help of Crane/Chain Cuppie etc. complete in all respect as per Respo Norms at various site. 26 Providing and fabrication & fixing of Fancing of Transformer Plinth at various site complete in all respect as per RESPO norms. 27 Providing and Chemical Earthing of Transformer at various site complete in all respect as per RESPO norms. 28 Laying, Lifting and sagging of LT AB Cable 3x120+1x95+1x16 sqmm. at various site complete in all respect as per RESPO norms. 29 Laying, Lifting and sagging/ Jumpering of ACSR Weasel Conductor at various site complete in all respect as per RESPO norms. 30 Laying, Lifting and sagging of ACSR Dog conductor at various site complete in all respect as per RESPO norms. 31 Fixing of 3 Phase Distributiong Box at various site complete in all respect as per RESPO norms. 32 Fixing of MS Angle 65x65x6 MM For GI Pipe Support at various site complete in all respect as per RESPO norms. 33 Fixing of MS Channel 100x50 at various site complete in all respect as per RESPO norms. 34 Laying of LT XLPE Cable All. 1x400 Sqmm at various site complete in all respect as per RESPO norms. 35 Laying of LT XLPE Cable All. 1x240 Sqmm at various site complete in all respect as per RESPO norms. 36 Fixing/Installation of 11 kv VCB I/C CTR 600/300/5 A 350 MVA complete in all respect as per RESPO norms. 37 Fixing/Installation of 11 kv VCB O/G CTR 200/100/5 A, 350 MVA at various site complete in all respect as per RESPO norms. 38 Fixing/Installation of Earthing Rod at various site complete in all respect as per RESPO norms. 39 Fixing/Installation of Earthing of Pole at various site complete in all respect as per RESPO norms. 40 Fixing/Installation of 11 kv Polymeric Disc Insulator at various site complete in all respect as per RESPO norms. 41 Fixing/Installation of 11 kv Polymeric Disc Insulator with Fitting at various site complete in all respect as per RESPO norms. 42 Fixing/Installation of Disc Fitting 45 KN at various site complete in all respect as per RESPO norms. 43 Fixing/Installation of 11 kv Polymeric Pin Insulator at various site complete in all respect as per RESPO norms. 44 Fixing/Installation of 11 kv X Arm V Type at various site complete in all respect as per RESPO norms. 45 Fixing/Installation of Stay Set Complete at various site complete in all respect as per RESPO norms. 46 Fixing/Installation of D.O Fuse Set 11 Kv at various site complete in all respect as per RESPO norms. 47 Fixing/Installation of 11 kv TPMO Set at various site complete in all respect as per RESPO norms. 48 Fixing/Installation of 11 kv Cable Jointing Kit (3x185 Sqmm) O/D at various site complete in all respect as per RESPO norms. 49 Fixing/Installation of 11 kv Cable Jointing Kit (3x185 Sqmm) I/D at various site complete in all respect as per RESPO norms. 50 Fixing/Installation of 11 kv Fuse Set at various site complete in all respect as per RESPO norms. 51 Laying of 3x185 sqmm cable Double Ckt with tranchless method complete in all respect as per RESPO norms. 52 Laying of 3x185 sqmm cable Double Ckt with the help of Sand & Bricks complete in all respect as per RESPO norms. 53 Laying, Lifting and fixing of 3x185 sqmm cable complete in all respect as per RESPO norms. 54 Providing & fixing of Stone Pad at various site complete in all respect as per RESPO norms. 55 Providing & fixing of MS Nut & Bolt at various site complete in all respect as per RESPO norms. 56 Providing & fixing of Cable Route Marker at various site complete in all respect as per RESPO norms. 57 Providing & fixing of Dropper Channel 100x50 MM at various site complete in all respect as per RESPO norms. 58 Providing & fixing of 11 kv Top Channel at various site complete in all respect as per RESPO norms. 59 Providing & fixing of Dead end clamp with Eye hook at various site complete in all respect as per RESPO norms. 60 Providing & fixing of Dead end clamp at various site complete in all respect as per RESPO norms. 61 Providing & fixing of Suspension Clamp with Eye hook at various site complete in all respect as per RESPO norms. 62 Providing & fixing of Suspension Clamp at various site complete in all respect as per RESPO norms. 63 Providing & fixing of All. Crimping Lug 400 at various site complete in all respect as per RESPO norms. 64 Providing & fixing of Peircing Connector at various site complete in all respect as per RESPO norms. 65 Providing & fixing of 11 kv X Arm Clamp at various site complete in all respect as per RESPO norms. 66 Providing & fixing of F Clamp at various site complete in all respect as per RESPO norms. 67 Providing & fixing of J Hook at various site complete in all respect as per RESPO norms. 68 Providing & fixing of GI Pipe 6 Dia at various site complete in all respect as per RESPO norms. 69 Providing & fixing of 3 Phase Distributiong Box Clamp at various site complete in all respect as per RESPO norms. 70 Providing & fixing of Copper I Piece bus bar at various site complete in all respect as per RESPO norms. 71 Providing & fixing of MS Holding Clamp at various site complete in all respect as per RESPO norms. 72 Making of all HT/LT connections required to energize the line and restoring of electricity supply to consumer properly complete in all respect.

Key Value

Document Fees
INR 3540 /-
EMD
INR 89416.0 /-
Tender Value
Refer document

Attachment

FileName File Description File Size
Click here to download tender document Tender Notice 0 KB
Click here to download tender document Tender Document 0 KB
Click here to download tender document Tender Document 0 KB
Click here to download tender document Tender Document 0 KB
Disclaimer :
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.
Tell us about your Product / Services,
We will Find Tenders for you

Copyright © 2024 · All Rights Reserved. Terms of Usage | Privacy Policy

For Tender Information Services Visit : TenderDetail