}

Tender For The Work Of Construction Of 11Kv/Lt Lines, 11/.04 Kv S/S And Other Associated Work For Releasing New Connection/Shifting Of Line Against Packages, To Be Passed From Time To Time In Deposit Scheme Under Edd-I, Sikandra, Agra., 1 Carriage Of Fo, agra-Uttar Pradesh

Government Departments has published Tender For The Work Of Construction Of 11Kv/Lt Lines, 11/.04 Kv S/S And Other Associated Work For Releasing New Connection/Shifting Of Line Against Packages, To Be Passed From Time To Time In Deposit Scheme Under Edd-I, Sikandra, Agra., 1 Carriage Of Fo. Submission Date for this Tender is 27-09-2024. Civil Work Tenders in agra Uttar Pradesh. Bidders can get complete Tender details and download the document.




Tender Notice

45342567
Tender For The Work Of Construction Of 11Kv/Lt Lines, 11/.04 Kv S/S And Other Associated Work For Releasing New Connection/Shifting Of Line Against Packages, To Be Passed From Time To Time In Deposit Scheme Under Edd-I, Sikandra, Agra., 1 Carriage Of Fo
Open Tender
Indian
Uttar Pradesh
Agra
27-09-2024

Tender Documents

Tender Details

Tender For The Work Of Construction Of 11Kv/Lt Lines, 11/.04 Kv S/S And Other Associated Work For Releasing New Connection/Shifting Of Line Against Packages, To Be Passed From Time To Time In Deposit Scheme Under Edd-I, Sikandra, Agra., 1 Carriage of following from 132 KV Taj Agra to dump site through the Kacha and Pakka road including the work of its loading and unloading at the respective ends including the cost of arrangement of labour, T&P, carrier etc. required for proper completion of work.(Distance 00-50Kms.) a) ST pole 9.0/11.0/13.0 Mtr. long 2 Carriage of following from 132 KV Taj Agra to dump site through the Kacha and Pakka road including the work of its loading and unloading at the respective ends including the cost of arrangement of labour, T&P, carrier etc. required for proper completion of work.(Distance 00-50Kms.) b) PCC pole 8.5 Mtr. long 3 Carriage of following from 132 KV Taj Agra to dump site through the Kacha and Pakka road including the work of its loading and unloading at the respective ends including the cost of arrangement of labour, T&P, carrier etc. required for proper completion of work.(Distance 00-50Kms.) C) 16/25 KVA T/F 4 Carriage of following from 132 KV Taj Agra to dump site through the Kacha and Pakka road including the work of its loading and unloading at the respective ends including the cost of arrangement of labour, T&P, carrier etc. required for proper completion of work.(Distance 00-50Kms.) E) 63 KVA T/F 5 Carriage of following from 132 KV Taj Agra to dump site through the Kacha and Pakka road including the work of its loading and unloading at the respective ends including the cost of arrangement of labour, T&P, carrier etc. required for proper completion of work.(Distance 00-50Kms.) F) 100 KVA T/F 6 Carriage of following from 132 KV Taj Agra to dump site through the Kacha and Pakka road including the work of its loading and unloading at the respective ends including the cost of arrangement of labour, T&P, carrier etc. required for proper completion of work.(Distance 00-50Kms.) F) 250 KVA T/F 7 Carriage of following from 132 KV Taj Agra to dump site through the Kacha and Pakka road including the work of its loading and unloading at the respective ends including the cost of arrangement of labour, T&P, carrier etc. required for proper completion of work.(Distance 00-50Kms.) G) Metering Cubical 8 Carriage of following from 132 KV Taj Agra to dump site through the Kacha and Pakka road including the work of its loading and unloading at the respective ends including the cost of arrangement of labour, T&P, carrier etc. required for proper completion of work.(Distance 00-50Kms.) H) LT PVC Cable 3.5x70/120/185/240 sq.mm. 9 Carriage of following from 132 KV Taj Agra to dump site through the Kacha and Pakka road including the work of its loading and unloading at the respective ends including the cost of arrangement of labour, T&P, carrier etc. required for proper completion of work.(Distance 00-50Kms.) I) 11 KV 3×35/70/3×120/185sqm cable 10 Cartiage of following materialfrom 132 KV Taj store Agra to dump site through the Kacha and Pakka road including the work of its loading and unloading at the respective ends including the cost of arrangement of labour, T&P, carrier etc. required for proper completion of work.(Distance 00-50Kms.) J)Line material viz. Aerial bunch conductor/Weasal conductor/Dog, G.I. earth wire, cross arm, angle, channel, insulators,clamps and other line material, if required 11 Cutting of kharanja/mettalic road/concrete portion while digging pit for erection of PCC/STP poles, stays rod and giving the exact shape after exicution work as per direction of supervising engineer. It includes the cost of labour, T & P, carrier etc reauired for proper completion of work. 12 Erection and grouting in 1:2:4 ratio (cement, sand and bricks balast) on Single Pole 9/11/13 Mtr. long ST poles including fixing ofall accessoriesfor 11 KV line as per RESPO norms.Labour, T &P and carrier, grouting material etc. required for proper completion of work shall be done by the contractor at his own cost. 13 Erection and grouting in 1:2:4 ratio (cement, sand and bricks balast) on Double Pole 9/11/13 Mtr. long ST poles including fixing ofall accessoriesfor 11 KV line as per RESPO norms.Labour, T &P and carrier, grouting material etc. required for proper completion of work shall be done by the contractor at his own cost. 14 Erection and grouting in 1:2:4 ratio (cement, sand and bricks balast) single Pole on 8.5 Mtr. longPCC poles including fixing ofall accessories for 11 KV/LT Line as per RESPO norms Labour, T &P and carrier, grouting material etc. required for proper completion of work shall be done by the contractor at his own cost. 15 Erection and grouting in 1:2:4 ratio (cement, sand and bricks balast) Double Pole on 8.5 Mtr. longPCC poles including fixing ofall accessories for 11 KV/LT Line as per RESPO norms Labour, T &P and carrier, grouting material etc. required for proper completion of work shall be done by the contractor at his own cost. 16 Erection and grouting stay of ratio 1:2:4 (cement, sand and bricks balast) as per RESPO norms including the costof arrangement of labour, T&P, carrier etc. required for proper completion of work. Grouting material i.e. cement, sand, brick ballast/stone ballast etc. shall be arranged by the contractor at his own cost. 17 Fixing of earthing rod (20x2500mm) as per RESPO norms including the cost of arrangement of labour, T&P, carrier etc. required for proper completion of work. 18 Distmentaling of 8.5 Mtr. long PCC Single pole by digging of pits and opening of all l 11KV/LT accessories & its carriage with material from site to concerning JE Store with the work of loading and unloading at both ends. (0-40 KM) 19 Distmentaling of 8.5 Mtr. long PCC Double pole by digging of pits and opening of all l 11KV/LT accessories & its carriage with material from site to concerning JE Store with the work of loadig and unloading at both ends. (0-40 KM) 20 Removal of following damaged conductor from the line with its bundling and stacking with the work of carriage fromsite to concerning JE Store with the work of loading and unloading at both ends. (0-40 KM) A) ACSR Weasel Conductor 21 Removal of following damaged conductor from the line with its bundling and stacking with the work of carriage fromsite to concerning JE Store with the work of loading and unloading at both ends. (0-40 KM) B) ACSR Dog/Racoon Conductor 22 Removal of following damaged conductor from the line with its bundling and stacking with the work of carriage fromsite to concerning JE Store with the work of loading and unloading at both ends. (0-40 KM) C) 50/95/120 sqmm Areal Bunch Conductor. 23 Laying sagging stringing and binding and jumpering of conductor in LT line as per RESPO manual and as per direction of supervising engineer. It includes the cost of labour, T & P, carrier etc reauired for proper completion of work. a) ACSR Weasal conductor 24 Laying sagging stringing and binding and jumpering of conductor in LT line as per RESPO manual and as per direction of supervising engineer. It includes the cost of labour, T & P, carrier etc reauired for proper completion of work. c) ACSR DOG/Raccon Conductor 25 Laying sagging stringing and binding and jumpering of conductor in LT line as per RESPO manual and as per direction of supervising engineer. It includes the cost of labour, T & P, carrier etc reauired for proper completion of work. C)50/95/120 sqmm Areal Bunch Conductor. 26 Construction of plinth for 250 KVA Transformer of size 5’x5’x4’ above the ground lable and 1 feet below the ground. At the bottom there shall be CC pad of brick ballast of size 5x5’x3” thick in ratio 1:3:6 [Cement, sand and brick ballast].The first class brick wall work shall be 9” thick in ratio 1:4 [Cement and sand].The hollow portion among the wall shall be filled up with the brick ballast. On the top of the wall of plint there shall be RCC workin ratio 1:3:6 [Cement, Sand and grit stone] by using 12 mm dai MS bar at distance of 9’’. There shall be plastering all over the plinth 12 mm thick in ratio 1:4 [Cement and sand] above the ground level. Proper watering and curing of the plinth shall be carried out as per directionof supervising engineer. 27 Fencing of250 KVA T/Fsas per following specification -Fabrication of 50x50x6 mm size MS Angle frame of size 3000x2400mm with 450 mm long angle for grouting the frame and fixing of 2x1.5, 10 SWG welded wire mesh with MS strip of 24x5mm size all round the frame and drilling 9 mm holes insides of frames at as distance of 300mm for jointing of frame with the help of boslts and nuts including cost of material. The width of panal may vary as per site conditions, Grouting and fixing of angle iron frames in ratio 1:2:4 (cement, coarse sand and stone ballast ) in the pocket of 150x150x150mm all round the plinth and bolting of frames with 25x8 mm size bolts and nuts, Making main gate in front of the plinth of size 3000x2400 mm by making two leaves of size 3000x1200mm size and groutingthe same in ratio and method mentioned at item (b) above fixing with hinges with dandlas for locking system & Painting of entire wire mesh angle iron etc. with Bus Green super enamelled pain in two coats on the primer two coatsof Redoxide. 28 Earthing of 250 KVA distribution transformer by maintenance free Earthing Electrods (Chemical) by digging pits 6 dia 3mtr. deep including inserting pipe in pipe technology concept involve two mild steel pipes one inserted inside the other of size ;-1. Inner pip dia meter 50 Mm.2. outer pipe dia meter 100 mm. length of the both pipeshall be 3000 mm. The M.S.pipe shall be ISI mark of class B as per IS 1239. Thickness of the pipe shall be 12 swg. The empty space in the pipe shall be filled with the specially developed crystalline material conductiv mixture such as copper and aluminimum powder.conductive carbon and bonding material etc. mixed in diffrentproportions. Conductive mixture contents shall be 70 % carbon powder & 30% metal powder preferably pure copper or aluminum material along with the required quantity of bonding materials. Granule size of the carbon & metal powder shall be 100 mesh. The mixture if forced (pressurized) inside the earth electrode in empty space of inner pipe & in empty space between the inner & outer pipe of the earth electrode, in paste form and after soldification of the same the bottom end cap as well as top end cap is provided. The mixture shall be pressed by machine in the pipe. Precaution shall be taken has to have no air gap inside the pipe while pressing.The back fill compound (earth enhancment material ) shall be superior conductive material that improvesearthing effectiveness especially in areas of poor conductivity such as rocky ground, sandy soil & areas of moisture varation. It may contain conductive cement (20%) graphite carbon powder(50%), hydrous aluminum siliacate(10%), Sodium montmorillonite (20%) etc. it shall be placed around earth electrode in the earth pit to improve the conductive of earth electrode & ground contact area. Mild steel electro galavanizedFlat 50x6 mm shall welded to earth electrode pips & connected with Trasnformer neutral and body as below with the hlep of steel nut & boltor through welding as per requirment of site, to GI pipe and filling of chemical mixutre around the GI pipe upto 3 mtr. including making of chamber & connecting the top of the inserted pipe with transformer body& neutral through M.S.flat 50x6mm with the help of nut & bolt or through welding and making a main hole of size 2×2 and covering the same by a stone pad for the purpose of poring water for moisture. 29 Mounting of followingT/F on existing double pole/single pole & making HT/LT connection a) 16/25 KVA T/F. 30 Mounting of followingT/F on existing double pole/single pole & making HT/LT connection c) 63 KVA T/F. 31 Mounting of followingT/F on existing double pole/single pole & making HT/LT connectionD) 100 KVA T/F. 32 Installation for 250 KVA T/F on Plinth in proper alignment direction & making HT/LT connection all Cost of labour and T&P which required for completion of work. 33 Laying of LT PVC Cable 3.5x70/120/185/240 sq.mm as RESPO Norms. 34 Laying of 11 KV 3x35/70/120/185 sqmm XLPE cable in trenchwith making loop (at a distance of approx. 4 mtr.) laying of bricks (18 nos. in one meter), filling of sand in trench then laying earth and its levelling and rammuring etc., complete work as RESSPO norms. 35 Laying and dressing of 11 KV under ground cable of size 3x 35/70/120/185 sq mm in the trench 450 mm fine sand cushion beneath and 150 mm fine sand cushion above the cable. The cable shall be duly protected by 1 class brick two on either side and third on top of the cables. Laid in series one after the other. The work includes supplying of fine sand & bricks refilling and ramming of the left out soil closing the trench and leveling Spare cable shall be left and buried in the trench in the shape of rings at both ends. Cables laying work includes unroling cutting / megaring & sealing both ends of the cable. 36 Rmoval of 100 KVA T/F from existing double pole after opening HT/LT connections and their carriage to 132 KV Taj store agra including laodiing and unloading at both end. 37 Rmoval of 63 KVA T/F from existing double pole after opening HT/LT connections and their carriage to 132 KV Taj store agra including laodiing and unloading at both end. 38 Rmoval of 25 KVA T/F from existing double pole after opening HT/LT connections and their carriage to 132 KV Taj store agra including laodiing and unloading at both end. 39 Cutting, chopping, triming of tree branches to clear the line route to give2 mtr. horizontal and vertical clearance to the line coming in the route ofdifferent feeders as per direction of supervising engineer 40 Making HT T off connection on existing mains labour, T &P and carrier etc. required for proper completion of work. 41 Installation of D.O. Fuse set on Double pole 42 Filling of 11KV 3×35/70/120/185 sqmm outdoor/Indoor cable boxes and making connection as per direction of supervising engineer on double pole. 43 Fixing of LT dustribution boxes on already errected pole for giving supply to consumer by connecting consumer cables by using appropriated alumunium lugs tape N & B provided by conractor as per requirement. 44 Providing & Fixing ofBolt & Nut of various sizes as per RESPO Manual Labour, T &P and carriageetcand other associated works to complete the work. All work shall be born by the contractor at his own cost. 45 Fabircation & Fixing of Top Channel, Dropper Channel, T-off Channel & Base Angle with Hole as per RESPO Manual Labour, T &P and carriageetcand other associated works to complete the work. All work shall be born by the contractor at his own cost. 46 Providing & Fixing of Stone Pad 300x300x75 mm Make as per RESPO Manual Labour, T &P and carriageetcand other associated works to complete the work. All work shall be born by the contractor at his own cost. 47 Providing & Fixing ofClamp for 16 KVA T/F Make as per RESPO Manual Labour, T &P and carriageetcand other associated works to complete the work. All work shall be born by the contractor at his own cost. 48 Fixing of TPMO on Double Poles as per Site requirment and RESPO Norms. 49 Guarding of HT line by laying, stringing, sagging and binding of 2 Nos. parallel GI wire 6 SWG after providing, fabrication and fixing of guarding angle and fabrication and fixing of X-guards (Tillis) of GI wire at distance of 3 Mtr. including the cost of arrangement of abour, T&P etc.required for proper completion of work. 50 Installation of 11 KV Meter Piller Box & Making connection.

Key Value

Document Fees
INR 1180 /-
EMD
INR 10000.0 /-
Tender Value
INR 10 Lakhs /-

Attachment

FileName File Description File Size
Click here to download tender document Tender Notice 0 KB
Click here to download tender document Tender Document 0 KB
Click here to download tender document Tender Document 0 KB
Click here to download tender document Tender Document 0 KB
Disclaimer :
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.
Tell us about your Product / Services,
We will Find Tenders for you

Copyright © 2024 · All Rights Reserved. Terms of Usage | Privacy Policy

For Tender Information Services Visit : TenderDetail