Supply Of Materials For Construction Of Godown At R.S.No 83 Of Navalihal Village In Chikkodi Taluk. - Lumpsum Material,Enamel Paint-02,Plastic Emulsion Paint-02,Pvc Automatic Flushing Cistern 5 Litres With Fittings,White Vitreous China Clay Wall Corner Type, Lipped Front Urinal Basis Of Size 340 X 410 X 265Mm,Plumber.,.,Brass Stop Cock,,Lead Or Pvc Connection Pipe 32 Mm Dia (For Wash Basin),Cp Brass Waste 32Mm Of Standard Pattern,Cp Brass Chain With Plug,.,Cp Brass Pillar Tap Elbow Operated.,White Vitreous China Clay Surgeon Type Wash Basin Size 660X460 Mm,Add White Lead Paint, Gasket, Cement, Sand For Making Good The Wall And Floor At 2% Material,Licenced Plumber With Tools.,.,G.I. Flush Pipe Of Standard Size And Cp Brass Spreaders, Brass Unions And Clamps Including Fittings,C.I. / M.S. Brackets For Flushing Cistern-02,P.V.C Automatic Flushing Cistern 7.5 Litres With Fittings.,White Vitreous China Clay Squalting Plate,Add Brush, Putty, Sand Paper At 5%, On Cost Of Paint,White Cement Based Putty At 2Sqm / Kg At Rs. 1050 Per Kgs.,,Honnewood Planks For Panels 20 Mm Thick,,Honne Wood,,Hom Of Machinaries For Planing,.,Add Cutting And Other Wastage 5%,,Mathi/Nandi Wood Planks For Panels 25 Mm Thick,,Add Hom Of Welding And Grinding Machine At 2% On Material,Fabricator_.,A 5.50 Mm Thick Plain Glass01,Chrominum Plated Screws.,.,Cleat Angles_,Alluminium Handles - 15 Mm.,.,Alluminium Tower Bolt - 20 Cm.,.,Pvc Edge Beading.,Rubber Beading For Shutters Beading,.,,Nylon Rollers,.,Aluminium Window Frame Section 1.20 Mm Thick.,.,Add Brush At 1% On Cost Of Paint.,,Enamel Metal Paint.,.,,Add Providing And Removing Scaffolding At 3% On Labour.,,Painter Class I.,,Add Wire Brush, Fine Steel Wool, Putty, Sand Paper, At 3% On Cost Of Paint.,Ready Mix Primer Paint (Ready Mix Red Lead Paint).,Add Hom Of Welding And Grinding Machine At 4% On Materi,Welder Grade 1.,Fitter Class I,,Ms Flat,.,M.S Rods_,Vitrified Tiles 10 Mm Thick 600 X 600, Mm,Mason Class I (With Tools).,.,,Add Watering Charges At 1 % On Labour.,,Add Sundries Charges At 1 % On Labour.,,Binding Wire,.,Tmt Bars Fe 500,.,Add Handling Loading And Unloading At 1% On Material.,,Burnt Bricks Class 35 (Non Modular).,,Add For Scaffolding 5 Per Cent Of Cost Of Labour And Material,Laboratory Asst., (Sslc Passed)/Mate/Supervisor,Mixer (Concrete Small Used In Culvert.),Bond Stone 20 X 20 X 45 Cm.,,Stone At Quarry-1,Add Sundries Charges At 2 % On Material-02,Casurina Poles 100 - 150 Mm.,,Add Handling Loading And Unloading At 2% On Material.,,Casurina Poles 75 - 100 Mm Dia.,Jungle Wood Runners And Plank.,,Silver Oak, Or Equivalent Planks 38 Mm Thick.,,Hom Of Vibrator 0.71 Days.,,Plasticizer / Super Plasticizer.,.,Add Sundries Charges At, 1 % On Material.,Add Watering Charges At 1 % On Material.,,Mixer (Concrete) - 1 Cum Capacity.,,Portland Cement,.,Coarse Sand (Zone Iii),,Broken Stone Aggregate 12 Mm To 10 Mm Size,,Broken Stone Aggregate 20 Mm Size,,Broken Stone Aggregate 40 Mm Size,