|
| 1 | Clearing grass /shrubs and weeds upto height of 1.5m anywhere inside the port premises includingremoval of rubbish up to a distance of 50m outside the periphery of the area cleared including all cost of labour, fuel, transport, tools, equipments, loading and unloading etc complete as directed at site by the Engineer - in - charge from time to time |
| 2 | Felling trees of the girth upto and including 60cm (measured at a height of 1 m above ground level), including cuttingof trunks and branches and stacking of serviceable material and disposalof unserviceable material including all cost of labour, fuel, transport, tools, equipments, loading and unloading etc complete as directed at site by the Engineer - in - charge from time to time |
| 3 | Painting Kerb wall and centre median (old work) with one coat of synthetic enamel paint of approvedbrand and manufacture of requirement colour to give an even shadeas per the requirment inside the port premises including all cost of labour,materials, fuel, transport, tools, equipments etc complete as directed at site by the Engineer - in - charge from time to time |
| 4 | Painting road marking (old work) with onecoats to give uniform finish with road marking paint of superior make as approved by the Engineer-in-Chargeover concrete surface including cleaning the surface of all dirt, scales, oil grease and other foreign materials etc and lining out complete as per the requirment inside the port premises including all cost of labour,materials, fuel, transport, tools, equipments etc complete as directed at site by the Engineer - in - charge from time to time |
| 5 | Painting road surface marking with one coat to give uniform finish with ready mixed road marking paint conforming to IS :164 on bituminous surface in white/ yellow shade, inculding cleaning the surface of all dirt, scales, oils, grease and forgign materials etc, complete including all cost of labour,materials, fuel, transport, tools, equipments etc complete as directed at site by the Engineer - in - charge from time to time |
| 6 | Replacing the damaged drain/cable chase slabs of maximum size of 1.5m x 0.3m x 0.2m availableinside the port premises as directed by Engineer-in- Charge including cost for JCB/Hydra crane, tractor, tools & pant, labours etc required to complete the work satisfactorily |
| 7 | Earth work in excavation by mechanical means Hydraulic excavator/ Manual means over area (exceeding 30cm in depth, 1.5m in width as well as 10 sqm in plan for providing storm water drain including getting out and disposal of excavated earth lead upto 50m andfor all lift, as directed by Engineer-in- Charge |
| 8 | Providing and fixing concertina coil fencing with punched tape concertina coil 600 mm / 900mm dia10 metre openable length ( total length 90 m), having 50 nos rounds per 6 metre length, upto3 m height of wall with existing angle iron ‘Y’ shaped placed 2.4m or 3.00 m apart and with9 horizontal R.B.T. reinforced barbed wire, stud tied with G.I. staples and G.I. clips to retain horizontal, including necessary bolts or G.I. barbed wire tied to angle iron, all complete including all cost of labour,materials, fuel, transport, tools, equipments etc complete as directed at site by the Engineer - in - charge from time to time |