| 1 | Taking down cement plaster of any description and in any position including raking outfor keys, scrubbing down with water etc of any thikness & brick or stone wall etc. cement or cement lime plaster any description complete all as specified and directed. |
| 2 | Material and labour for 15mm thick rendering in cement mortar (1:6)on surface of any description of brick or concrete surface of wall and finished the surface even and smooth without using extra cement complete all as specified and as directed. |
| 3 | Material and labour for 15mm thick rendering in cement mortar (1:4)on surface of any description of brick or concrete surface of wall and finished the surface even and smooth without using extra cement complete all as specified and as directed. |
| 4 | Material andlabour for granules textured homogeneous wall finishing system consisting of a two component system of dry granules (25 Kgs Pack) made of 92% silica particles coated with fade resistant pigments, 100% acrylic polymer bonding agent (5 Kgs Pack) with the applied thickness of the coating being between 0.8 mm - 1.2 mm to be applied on cured, smooth level plastered surfaces, as per manufacture\"s directions, applied by approved applicator of the manufactures as per the directions / supervision of the Engineer-in-Charge. The above textured coating should confirm to surface spread of flame class one of BS 476 : Part 7 : 1971 and pull off strength of the coating to meet JISA 6909 complete all as specified and directed and as manufactures specification/instructions. MAKE : - The item will be executed by authorized applicator only of Bakelite Hylam Limited or equivalent approved company by GE. Contractor shall submit details of authorised applicator for approval of GE before commencement of work in respect of above item. |
| 5 | Material andlabour for rough cast plaster with and including 15mm thick rendering in CM 1:3 on brick wall or concrete surface as specified in clause 14.22 of SSR Part-I complete all as specified and directed.Note:-(i) After applying the under coat of cement and sand mortar 1:3 not less than 10 mm thick and while it is still in plastic state the rough cast mixture consisting of crushed stone or fine gravel aggregate (which is generally of size between 6 to 12 mm depending on the texture required) mixed with coarse sand and cement in the ratio of 1: 1: 1 shall be applied and finished even.(ii) The mix of cement and sand shall be made slightly loose/wetter than normal for rendering to ensure that larger aggregates are thoroughly covered.(iii) Contractor\"s quoted rate shall include all above provisions and no extra shall be admissible on this account. |
| 6 | Material andlabour for preparation of exposed brick wall surface by cleaning the surface wire brush to remove all dirt/loose materials from the bricks and from the joints between the bricks. Prepared surface should be then washed with diluted HCL acid (dilution ratio of 1:50) for three times in a day for two days. After acid wash surface should be allowed to be air dried for one day. NOTE : - Further treatment over the surface so achieved will be carried out only after approved of the same by GE. |
| 7 | Material and labour for carrying out efflorescence treatment to unplastered wall surface comprising of the following specifications and sequence with and including 15 mm thick rendering in CM 1:4 finished even and smooth without using extra cement : - (a) Prime the prepared surface with one of the following product mixed with cement in 1:1 ratio as bonding agent : - (i) Pidicrete URP of M/S Pidilite. (ii) Sika Latex of M/S Sika. (iii) Nitobond SBR Latex of M/S FOSROC.(b) Immediately after priming the surface PMM (Polymer Modified Mortar) to be applied “BY HAND” while the prime is tacky. PMM should be prepared by mixing one of the following compounds in Cement Mortar 1:3 as per manufacturer’s instructions: -(i) Pidicrete URP of M/S Pidilite. (ii) Sika Latex of M/S Sika. (iii) Nitobond SBR Latex of M/S FOSROC.(c) PMM surface should be allowed to dry for one day. After that it should painted with two coats of one of the following compound mixed with cement only in ratio of 1 (selected compound) : 1:5 (Cement) : - (i) Pidicrete URP of M/S Pidilite. (ii) Sika Latex of M/S Sika. (iii) Nitobond SBR Latex of M/S FOSROC.(d) Now apply two coats of one of the following compound over the surface. These compounds are to be used as per manufacturer’s instructions: -(i) Pidifin 2K of M/S Pidilite. (ii) Brush Coat of M/S Sika. (iii) Brush Bond of M/S FOSROC.NOTE : - Both coats should be perpendicular to each other and gap between two coats shall be minimum 6 hours. (e) Sprinkle loose coarse sand after second coat while surface is tacky.NOTE: - (i) The item will be executed by authorized applicator only of the selected / approved company. Contractor shall submit details of authorised applicator for approval of GE before commencement of work in respect of above item. (ii) Every stage of work will be approved by GE, then only next layer will be executed by contractor. |
| 8 | Material and labour for 10mm thick cement plaster in CM (1:3) to ceiling surfaceand finished the surface even and smooth without using extra cement with and including applyingthree coats of white wash on ceiling complete all specified and directed. |
| 9 | Material andlabour for preparation of new plastered surfaces of walls and applying two coats of oil bound distemper with hand roller, over a coat of alkaline resistant primer over a coat of wall care puttynot less than 1mm thick as per manufacturer\"s instruction complete all as specified and directed. |
| 10 | Material and labour for preparation of new plastered surfaces of wall and applying two coats of cement base paint over a coat of primer on walls complete all as specified and directed. |
| 11 | Material andlabour for preparation of new plastered surfaces of walls and applying two coats of exterior emulsion paint with hand roller, over a coat ofprimer complete all as specified and directed. |
| 12 | Material and labour for complete removal of existing treatment on surface of walls by using appropriate technique as approved by Engineer-in-Charge for complete removal of all layers of treatment and reaching upto old plastered surface and applying a coat of wall care putty not less than 1mm thick as per manufacture instructions and applying two coats of oil emulsion paint over a coat of alkaline resistant primer complete all as specified and directed. |
| 13 | Material andlabour for preparing old painted surfaces of walls plastered/unplatered by washing, rubbing down and stopping of distempered and painted surfaces and applying one coat of OBD complete all as specified and directed. |
| 14 | Material and labour for complete removal of existing treatment on surfaces of walls, chajjas, fascias etc and effloroscent salts and treating oil and greasy spots washing down with water and applying two coats of cement base paint over a coat of alkaline resistant primer including filling up all cracks with tar plastic (STP) crack filler and also, make good to plastered surface complete all as specified and directed. |
| 15 | Material and labour forpreparing old painted surfaces of walls, chajjas, fascias etcplastered/unplatered by washing, rubbing down and stopping of distempered and painted surfaces and applying one coat of cement base paint including filling up all cracks with tar plastic (STP) crack filler and also, make good to plastered surface complete all as specified and directed. |
| 16 | Material and labour for complete removal of existing treatment on surface of walls, chajjas etceffloroscent salts and treating oil and greasy spots washing down with water and applying and applying two coats of exterior emulsion paint over a coat of alkaline resistant primer including necessary scaffolding etc complete all as specified and directed. |
| 17 | Material and labour for one coat of exterior emulsion paint including preperation of old decorated surfaces of wall chajjas balcony / pillars facis etc complete all as specified and directed. |
| 18 | Material andlabour for preperation of old decorated brick/concrete, plastered or unplastered surfaces of walls, pillars cornices etc and applying one coat ofwhite wash complete all as specified and directed. |
| 19 | Material andlabour for preperation of old decorated brick/concrete, plastered or unplastered surfaces of ceilings etc and applying one coat ofwhite wash complete all as specified and directed. |
| 20 | Material andlabour for preperation of old decorated brick/concrete, plastered or unplasteredsurfaces of ceiling by brooming down with steel wire brushing,scraping down smoke soot , moulds, moss andeffloroscent salts, trading oil and greasy spots etc. and applying one coat ofoil emulsion paint on ceiling complete all as specified and directed. |
| 21 | Material and labour for preparation of old wood and wooden based surfaces of any description not otherwise described over 10 cm in width or girth and applying one coat of synthetic enamel complete all as specified anddirected. |
| 22 | Material andlabour forpreparingold painted steel surfaces of any description not otherwise described over 10 cm width orgirthand applying one coat of synthetic enamel paint complete all as specified and directed. |
| 23 | Material andlabour forpreparingold painted steel surfaces of any description not otherwise described over 10 cm width orgirthand applying two coats of aluminium enamel paint complete all as specified and directed. |
| 24 | Material andlabour for writing letters or figures (Block, Roman, Italic or Indian) on plastered surfaces with using black synthetic enamel paint on back ground and letter & numbers written with white synthetic enamel paint of 100mm hight etc complete all as specified and directed. |
| 25 | Cleaningand removing all scaleand dirt, etcfrom existing water storage tanks of capacityexceeding 250 litres andnot exceeding 500 litres by emptying,drying and cleaning the tank by scrubbing the dust with wire brush from tank includingcleaning from mouths of circulating pipes, to entire satisfaction of Engineer-in–charge of cleaning ,including writing date of cleaning with oil paint of of visible colour in font size not less than 100 mm, complete all as specified and directed (The rates includes for disconnecting of existing water tank, lowering if required and hoisting, reconnecting and refixing in same position after cleaning ) NOTE: - (i) The whole process ofdisconnecting, reconnecting and refixing in same position after cleaning shall be done on the same day, if failing so, Rs. 100/- shall be deducted for each tank per day from the contractor due.(ii) A separate register to be maintained by contractor for cleaning and occupant signature with date to be obtained in it. |
| 26 | Cleaningand removing all scaleand dirt, etcfrom existing water storage tanks of capacity exceeding 500 litres andnot exceeding 1000 litres by emptying,drying and cleaning the tank by scrubbing the dust with wire brush from tank includingcleaning from mouths of circulating pipes, to entire satisfaction of Engineer-in–charge of cleaning, including writing date of cleaning with oil paint of of visible colour in font size not less than 100 mm, complete all as specified and directed (The rates includes for disconnecting of existing water tank, lowering if required and hoisting, reconnecting and refixing in same position after cleaning ) NOTE: - (i) The whole process ofdisconnecting, reconnecting and refixing in same position after cleaning shall be done on the same day, if failing so, Rs. 100/- shall be deducted for each tank per day from the contractor due.(ii) A separate register to be maintained by contractor for cleaning and occupant signature with date to be obtained in it. |
| 27 | Refixing old serviceable steel water tubing of 15 mm bore, in new or old position,any grade, including S&F new fittings as required, fixed to walls and ceilings or laying in floors including necassary cutting/chasing/pinning in wall and making good the disturbed surfaces as per existing wherever required , including taking down of old tubing as existing at site and removal, complete all as specified and as directed |
| 28 | Refixing old serviceable steel water tubing of 20 mm bore, in new or old position,any grade, including S&F new fittings as required, fixed to walls or laid in floors/roofs etc including necassary cutting/chasing/pinning in wall if required and making good the disturbed surfaces as per existing wherever required , including taking down of old tubing as existing at site and removal, complete all as specified and as directed |
| 29 | Supply and fixing in repair of stop valve 15mm dia, cast copper alloy, screwed down, high pressure with crutch or butter fly handle, screwed both ends for iron pipes or unions, complete all as specified and as directed.(NOTE: - Weight of stop cock shall not be less than 0.575 Kg) |
| 30 | Supply and fixing in repair of stop valve 20mm dia, cast copper alloy, screwed down, high pressure with crutch or butter fly handle, screwed both ends for iron pipes or unions, complete all as specified and as directed.(NOTE: - Weight of stop cock shall not be less than 0.900 Kg) |
| 31 | NOTE:- Amount of credit ofRs. 750.00 for retrieved materials is mentioned in Schedule of Credit Page No 19 of tender documents in pdf form which will be deducted offline while acceptance of tender. |