Construction Of Upgraded High School Bojanalya Of Village Chhabbi Of Chhabbi Gram Panchayat - Tools And Plants And Electrical Charges At 2Per, Add Brush Putty Sand Paper Roller At 5Per On Cost Of Paint, Side Guides, Locking Arrangmentss, High Tension Coill, Gauge 75 Mm Ms Laths Of 2 8 M Length, Ball Bearing For Rolling Shutterss, Ms Angle Iron 50Mm X 50Mm X 6Mm, 33.8 Metre In Length At 4.5 Kg Per Metre, Anchor Bolts 750Mm, Base Plate / Base Plate, Gusset Plates 6 Mm Thick, Ms Angle Iron 40Mm X 40Mm X 6Mm, 23 Metre In Length At 3.5 Kg Per Metre, Add, Suspension Shaft, Add Providing And Removing Scaffolding At 3 On Lab, Add Handling Loading And Unloading At 1 Per On Mat, Solid Concrete Blocks 40 20 20 Cms 5 00 N Sq Mm, Painters Class I, Unit Cost As Per The Specifications, Hom Of Welding And Grinding Machines, Hom Of Cutting And Grinding Machines, Enamel Metals Paint, Corbon Electrodess, Ceramic Tiles 30 30 Cms, Welders Grade I, Rubble Stoness, Enamel Paintt, Plastic Emulsion Paintt, Ms Flat, Mason Class 1 ( With Tools ) , Mason Call-Ii ( With Tools ) , Fitter Calss I, Bond Stone 20X20x45 Cm, M S Rods, Mixer01, Add Sunderesh Charge 1Percent On Material, Add Water Charge 1Percent On Material, Display Board / Cib, Coarssed Sand ( Zone-Iii ) , Concrete Mixer ( 1Cum Capacity ) , Tmt Steel Bars Fe500, Silver Oak Or Equivalent Plankis 38Mm Thick, Casurina Poles 100-150 Mm Dia, Broken Stone Aggregate 40Mm Size, Broken Stone Aggregate 20Mm Size, Broken Stone Aggregate 12Mm To 10Mm Size, Plastisizer / Super Plastisier, Portland Cement