Construction Of Shg / Nrlm Shed At Yeragera Gp Under Mgngega Scheme - Broken Stone Aggregate 40 Mm Size 012, Broken Stone Aggregate 20 Mm Size 012, Broken Stone Aggregate 12 Mm To 10 Mm Size 012, Coarse Sand ( Zone Iii ) 012, Portland Cement 012, Mixer ( Concrete ) 1 Cum Capacity 012, Add Watering Charges At 1 Persent On Material 012, Add Sundries Charges At 1 Persent On Material 012, Over Head & Other Miscellaneous Charges 012, Size Stone 20 X 20 X 25 Cms 012, Bond Stone 20 X 20 X 45 Cm 012, Boulders 012, Mixer ( Concrete Small Used In Culvert ) 012, Add Sundries Charges At 1 Persent On Labour 012, Add Watering Charges At 1 Persent On Labour 012, Plasticizer / Super Plasticizer 012, Hom Of Vibrator 0.71 Days 012, Formwork, Centering & Scaffolding For Beams & Lintels Of Building - 60Persent 012, Solid Concrete Block ( 40X15x20 Cms ) 5.00 N / Sqmm 012, Mason Class I ( With Tools ) 012, Casurina Poles 100 To 150 Mm 012, Add Handling , Loading And Unloading At 1Persent On Material 012, Add Sundries Charges At 2 Persent On Material 012, Formwork, Centering & Scaffolding For Chejjas, Canopy & Other Architecturalprojections Of Minor Sections 45Persent 012, Tmt Bars Fe 500 012, Binding Wire 012, M.S Rods 012, Ms Flat 012, Fitter Class I 012, Welder Grade I 012, Add Hom Of Welding And Grinding Machine At 4Persent On Material 012, Ready Mix Primer Paint ( Ready Mix Red Lead Paint ) 012, Add Wire Brush, Fine Steel Wool, Putty, Sand Paper, At 3Persent On Cost Of Paint 012, Painter Class I 012, Add Providing And Removing Scaffolding At 3Persent On Labour 012, Add Handling , Loading And Unloading At 2Persent On Material 012, Enamel Metal Paint 012, Add Brush At 1Persent On Cost Of Paint 012, Mathi / Nandi Wood Planks For Panels 25 Mm Thick 012, Add Cutting And Other Wastage 5Persent 012, Hom Of Machinaries For Planing 012, Soild Partical Board Flush Doors 30 Mm Thick 012, Aluminium Window Frame Section 1.20 Mm Thick 012, Nylon Rollers 012, Rubber Beading For Shutters Beading 012, Pvc Beading 012, Alluminium Tower Bolt - 20 Cm 012, Alluminium Handles - 15 Mm 012, Cleat Angles 012, Chrominum Plated Screws 012, Thick Plain Glass 5.50 Mm 012, Add 15Persent Wastage For Glass 012, Fabricator 012, Add Hom Of Welding And Grinding Machine At 2Persent On Material 012, Mathi / Nandi Wood Scantling 012, Formwork, Centering & Scaffolding For Plastering & Painting Of Ceiling - 25Persent 012, Vitrified Tiles 600X600 Mm 012, High Bond Tile Adhesive For Vitrified Tiles 012, Adhesive For Joints 012, Machine Polished Granite Stone Slabs 20 Mm 012, Stone Dresser ( With Tools ) 012, White Cement Based Putty At 2Sqm / Kg At Rs. 1050 Per Kgs 012, Add Brush, Putty, Sand Paper, Roller At 5Persent On Cost Of Paint 012, Plastic Emulsion Paint 012, Enamel Paint 012, Formwork, Centering & Scaffolding For Plastering & Painting Of New Walls - 25Persent 012, Unit Cost As Per The Specification 012, Orissa Pattern Of Size 580X440mm With Integral Type Foot Rests 012, S Or P Trap 100Mm 012, P.V.C. Flushing Cistern 10 Lts Low Level With Fitting 012, C.I. / M.S. Brackets For Flushing Cistern 012, G.I. 32Mm Dia Telescopic Flush Pipes With Fittings Specials 012, M.S. Holder Bat Clamp 32Mm 012, G.I. Overflow Pipe 20Mm Dia 012, Special For Overflow Pipe 012, Mosquito Proof Coupling 25Mm 012, Add White Lead Paint, Gasket, Cement, Sand For Making Good The Wall And Floorat 2Persent On Material 012, European Type Water Classet Of Specific Make 012, White Glazed / Viterous China Clay 10Lts Low Lwvwl Flushingcistern, With Fittings Andbrackets And 40 Mm White C.P. Flush Pipe 012, Black Plastic Seat With Lid As Specified 012, White Vitreous China Clay Flat Back Wash Basin Size 550X400mm 012, Copper Plated Brass Piller Tap 15Mm 012, Cp Brass Chain With Plug 012, Cp Brass Waste 32 Mm Of Standard Pattern 012, Brass Stop Cock 012, Lead Or Pvc Connection Pipe 32Mm Dia ( For Wash Basin ) 012, Licenced Plumber With Tools 012, Granite Sink 23Cm Thick 012, Polyenthylene Water Storage Tank Of Specified Capacity L 012, Labour Charges For Lifting And Placing In Position And Making Connection At 7Persenton Material 012, Handling Loading And Unloading 3Persent On Material 012, Aqua Nylon Mesh 012, Charcoal 012, Cost Of 6.5Mm M.S. Coil 012, Fabrication Charges. 012, Transportation Charges Of Materials Beyond 5 Km At 10Persent 012, Labour Charges For Handing Errection Of Rcc Rings Etc. At 5Persent 012, Rcc Cap 1000 Mm Dia, 100 Mm Thick 012, Pvc Pipe Of 10Kg Cum 90 Mm 012, Add 012, Electrification 012, Miscellaneous / Contingencies Charges 012, Display Board / Cib 012