}

Tender For Repairing/Construction Of 500M Gravel Approach Road, Repairing/ Construction Of Plinth, Road Over Plinth, Effluent Pit With Suitable Bundh /Embankment Etc., Construction Of C.C/R.C.C. Foundation With Pillows To Suit E-1400 (S-6) Rig Outfit At , DULIAJAN Oil Town-Assam

Oil India Limited has published Tender For Repairing/Construction Of 500M Gravel Approach Road, Repairing/ Construction Of Plinth, Road Over Plinth, Effluent Pit With Suitable Bundh /Embankment Etc., Construction Of C.C/R.C.C. Foundation With Pillows To Suit E-1400 (S-6) Rig Outfit At . Submission Date for this Tender is 07-11-2023. Civil Work Tenders in DULIAJAN Oil Town Assam. Bidders can get complete Tender details and download the document.




Tender Notice

40219303
Tender For Repairing/Construction Of 500M Gravel Approach Road, Repairing/ Construction Of Plinth, Road Over Plinth, Effluent Pit With Suitable Bundh /Embankment Etc., Construction Of C.C/R.C.C. Foundation With Pillows To Suit E-1400 (S-6) Rig Outfit At
Open Tender
Indian
Assam
Duliajan Oil Town
07-11-2023

Tender Details

Tender For Repairing/Construction Of 500M Gravel Approach Road, Repairing/ Construction Of Plinth, Road Over Plinth, Effluent Pit With Suitable Bundh /Embankment Etc., Construction Of C.C/R.C.C. Foundation With Pillows To Suit E-1400 (S-6) Rig Outfit At Any Location Or Multiple Locations In Central Field-East Area Including Supply Of All Materials Except Cement And Bitumen Drum Sheet -1 Surface dressing of the ground including removing vegetation and in-equalities not exceeding 15 cm deep and disposal of rubbish, lead upto 50 m and lift upto 1.5 m. All kinds of soil 2 Levelling and dressing road sides and verges including dressing the area and cutting earth upto 150mm depth and filling depression and breaking large earth lumps as directed. 3 Felling trees of the girth (measured at a height of 1 m above ground level) including cutting of trunks and branches removing the roots and stacking of serviceable material and disposal of unserviceable. Beyond 30 cm girth upto and including 60 cm girth. 4 Cutting / prunning / trimming of tree branches and stacking at site within 30 m or as directed. 5 Collecting / excavating sand, soil, silt, ordinary earth from any source, load into lorries, transport it to distant place of work including procuring earth and laying in layer of 150mm thickness and compacting, profile properly made for taking measurement, including all measurable lead upto 30m and lift as required. (The contractor shall be responsible for all formalities of supply of earth such as purchase of land including royalties, monopoly / other statutory taxes as required from any distance.) 6 CONSTRUCTION OF 100MM (CONSOLIDATED) GRANULAR SUB-BASE consolidated by dry rolling to proper grade including providing well compacted berms with earth on either side 1.2m wide levelled with finished road surface, dressing sub-grade including cutting surface upto75mm deep to required level and as per clause 401 (Road roller supplied by contractor). 7 REPAIR OF DAMAGED GRAVELLED ROAD SURFACE by dry and wet rolling gravel (25mm to 65mm) and sand shingles spread evenly over damaged surface including rolling out damaged portions etc.as per clause 401 (Road roller supplied by company). 8 CONSTRUCTIONS OF 150 MM THICK (CONSOLIDATED) GRAVELLED ROAD including providing well compacted side berms with earth on either sides, one metre wide and 50mm thick above final level of gravelled road, dressing sub-grade (including cutting of earth up to 75mm deep) to required level, spreading gravel in two layers with bindage of dry earth and dry rolling each layer separately until fully compacted and finally spreading sand shingles uniformly to 25mm thick and re-rolled as directed.(Ref. to MoRTH Spec.401)(Road roller provided by contractor). 9 Spreading gravel, pea-gravel or brick bat over sunken road surface, including carrying from a distance of 30.00m. 10 Spreading sand / filling, dry sand over sunken road surface, including carrying from a distance of 30.00 m. 11 Hire charges of Diesel Road Roller - 8 to 10 tonne 12 Supplying & Laying Reinforced cement concrete pipe NP3 900 mm dia(prestressed concrete pipe) for culverts on first class bedding of granular material in single row including fixing collar with cement mortar 1:2 but excluding excavation, protection works, backfilling, concrete and masonry works in head walls and parapets. 13 Supplying & Laying Reinforced cement concrete pipe NP3 600 mm dia (prestressed concrete pipe) for culverts on first class bedding of granular material in single row including fixing collar with cement mortar 1:2 but excluding excavation, protection works, backfilling, concrete and masonry works in head walls and parapets. 14 Forest Royalty of 3% for Group A. Additional 10% Cess on forest royalties for each of MMDRRF and DMFT. SECTION B 1 Supply of Full size jhama Bricks (slightly over burnt not badly out of shape) 2 Supply of Gravel (65mm graded down to 25mm), hard, clean and free from foreign materials 3 Supply of approved quality granular materials from approved quarry, free from organic matter including stacking in measurable stacks as directed. 4 Supply of Sand for general use with normal moisture content to be clean and free from clay rubbish GROUP B SECTION A 1 Felling trees of the girth (measured at a height of 1 m above ground level) including cutting of trunks and branches removing the roots and stacking of serviceable material and disposal of unserviceable. Beyond 120 cm girth upto and including 240 cm girth. 2 Cutting and removing bamboos (Jati / Bhaluka) and stacking them at about 30m. distance away from site of operation including cutting branches and cleaning the site. 3 Uprooting tree stumps and removing them to 30m from site of operation for girth of tree from 300mm upto one metre. but for girth of tree over one metre and upto 2 metre. 4 Uprooting bamboo stumps 5 Surface dressing of the ground including removing vegetation and in-equalities not exceeding 15 cm deep and disposal of rubbish, lead upto 50 m and lift upto 1.5 m. All kinds of soil 6 Collecting / excavating sand, soil, silt, ordinary earth from any source, load into lorries, transport it to distant place of work including procuring earth and laying in layer of 150mm thickness and compacting, profile properly made for taking measurement, including all measurable lead upto 30m and lift as required. (The contractor shall be responsible for all formalities of supply of earth such as purchase of land including royalties, monopoly / other statutory taxes as required from any distance). 7 Clearing, removing, mud, silt etc. from steel / R.C.C. tanks, bowzers etc. including disposing off to a distance of 30m. 8 Construction of subgrade and earthen shoulders with approved material obtained from borrow pits with all lifts & leads, transporting to site, spreading, grading to required slope and compacted to meet requirement of table No. 300.2 with lead upto1000 m as per Technical Specification Clause 303.1.(Road roller cost included) 9 CONSTRUCTION OF 150MM (CONSOLIDATED) GRANULAR SUB-BASE consolidated by dry rolling to proper grade including providing well compacted berms with earth on either side 1.2m wide levelled with finished road surface, dressing sub-grade including cutting surface upto75mm deep to required level and as per clause 401. (Road roller supplied by contractor). 10 CONSTRUCTIONS OF 150 MM THICK (CONSOLIDATED) GRAVELLED ROAD including providing well compacted side berms with earth on either sides, one metre wide and 50mm thick above final level of gravelled road, dressing sub-grade (including cutting of earth up to 75mm deep) to required level, spreading gravel in two layers with bindage of dry earth and dry rolling each layer separately until fully compacted and finally spreading sand shingles uniformly to 25mm thick and re-rolled as directed.(Ref. to MoRTH Spec.401)(Road roller provided by contractor). 11 Hire charges of Diesel Road Roller - 8 to 10 tonne 12 Providing sand bags by filling minimum 0.02 cu. m of sand in empty cement bags, stitching and stacking in place upto 1.5m height, carrying upto 100m complete as directed including supply of empty Cement bags.(Cost of sand will be measured and paid separately). 13 Removal of unserviceable soil including excavation, loading and disposal upto 1000 metres lead but excluding replacement by suitable soil which shall be paid separately as per clause 305) 14 Driving vertically pipe piles of dia 150mm to 200mm including all handling, making pile shoes, marking pile length in metres, jointing, hoisting & driving with locally made pile drives gear, by manual labour/ crab winch and cutting off the surplus length after driving(Cutting/welding set to be provided by the Company) with 150mm to 200mmdia. pipe piles. 15 Providing & erecting protecting bamboo palisade to prevent erosion of road embankment or bridge/culvert abutments using matured Jati bamboo piles driven 1.5m deep underground and projecting 2 metres above ground closely spaced touching each other in a line and tying the exposed lengths of bamboo piles to two half bamboo horizontal (one inside and one outside) spaced 300mm apart with thick gauge tying wires. All materials tools supplied by contractor. 16 Providing & erecting bamboo palisade to prevent erosion/damage of road embankment or bridge/culvert abutments, effluent pit bundh etc. using matured jati bamboo piles driven 1.5m deep underground and projecting 2mabove ground at interval of 200mm to 250mm in a line and tying the exposed length of bamboo piles to two half bamboo horizontal (one inside and one outside ) spaced 300mm apart with thick gauge tying wire and fitting inside drum sheet lining and tying the same to frame work as directed including cutting & straightening empty drums. All materials and tools to be supplied by the contractor except empty drum.4 17 Supply And Making Standard 6.09m x 6.09m Bamboo Rafts with full size Jati bamboo horizontally both ways at 0.61m apart, tying with 18 gauge G.I. wire, placing and anchoring in position as directed by engineer at site and tying big sized tree branches on the raft fully packed, including supply of all materials such as brushwood, bamboo etc. and also transport of all materials to work site. 18 Spreading gravel, pea-gravel or brick bat over sunken road surface, including carrying from a distance of 30.00m. 19 Spreading sand / filling, dry sand over sunken road surface, including carrying from a distance of 30.00 m. 20 Hire charges of Pump set of capacity 4000 litres/hour. 21 Earth work in excavation by mechanical means (Hydraulic excavator) / manual means over areas (exceeding 30cm in depth. 1.5m in width as well as 10 sqm on plan) including disposal of excavated earth, lead upto 50m and lift upto 1.5m, disposed earth to be levelled and neatly dressed. All kinds of soil 22 Laying in position cement concrete of specified grade excluding the cost of centring and shuttering - All work upto plinth level: 1:2:4 (1Cement: 2 coarse sand: 4 graded stone aggregate 20 mm nominal size) 23 Centring and shuttering including strutting, propping etc. and removal of form for: Foundations, footings, bases of columns, etc. for mass concrete. 24 Laying in position specified grade of reinforced cement concrete excluding the cost of centring, shuttering, finishing and reinforcement- All work upto plinth level: 1:2:4 (1 cement: 2 coarse sand : 4 graded stone aggregate 20 mm nominal size) 25 Steel reinforcement for R.C.C. work incl 26 Forest Royalty of 3% for Group B. Additional 10% Cess on forest royalties for each of MMDRRF and DMFT. SECTION B 1 Supply of Gravel (65mm graded down to 25mm), hard, clean and free from foreign materials 2 Supply of Sand Shingle (containing 60 to 80% sand & 40 to 20%shingle of size 20mm graded down to 5mm), clean and free from clay and rubbish etc. 3 Supply of approved quality granular materials from approved quarry, free from organic matter including stacking in measurable stacks as directed. 4 Supply of Broken stone-Boulder broken (25mm graded down to 12mm), hard and clean. 5 Supply of Timber for shuttering 6 Supply of Sand for general use with normal moisture content to be clean and free from clay rubbish 7 Supply of Jhama bricks bats-each bat not smaller then 1/3 of a full brick SECTION C 1 Carriage of material by mechanical transport including loading unloading and stacking: Cement, stone blocks, G.I., C.I., A.C. & C.C. pipes below 100 mm dia and other heavy materials: Beyond 4KM and Upto5KM 2 Extra on Carriage of material by mechanical transport including loading unloading and stacking: Cement, stone blocks, G.I., C.I., A.C. & C.C. pipes below 100 mm dia and other heavy materials on every additional KM: Beyond 5KM and Upto 10KM3 Extra on Carriage of material by mechanical transport including loading unloading and stacking: Cement, stone blocks, G.I., C.I., A.C. & C.C. pipes below 100 mm dia and other heavy materials on every additional KM: Beyond 10KM and Upto 20KM 4 Extra on Carriage of material by mechanical transport including loading unloading and stacking: Cement, stone blocks, G.I., C.I., A.C. & C.C. pipes below 100 mm dia and other heavy materials on every additional KM: Beyond 20KM GROUP C SECTION A 1 Demolishing R.C.C. work manually / by mechanical means including stacking of steel bars and disposal of unserviceable material within 50metres lead as per direction of Engineer-in-Charge. 2 Demolishing brick work manually / by mechanical means including stacking of serviceable material and disposal of unserviceable material within 50 metres lead as per direction of Engineer-in-Charge. In cement mortar 3 Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom, backfilling the excavation earth to the extent required and utilising the remaining earth locally for roadwork) for Ordinary Soil by Manual Means (Depth upto 3 m) 4 Surface dressing of the ground including removing vegetation and in-equalities not exceeding 15 cm deep and disposal of rubbish, lead upto 50 m and lift upto 1.5 m. All kinds of soil 5 Laying in position cement concrete of specified grade excluding the cost of centring and shuttering - All work upto plinth level: 1:3:6 (1Cement: 3 coarse sand: 6 graded stone aggregate 20 mm nominal size) 6 Laying in position specified grade of reinforced cement concrete excluding the cost of centring, shuttering, finishing and reinforcement- All work upto plinth level: 1:2:4 (1 cement: 2 coarse sand: 4 graded stone aggregate 20 mm nominal size) 7 Centring and shuttering including strutting, propping etc. and removal of form for: Foundations, footings, bases of columns, etc. for mass concrete. 8 Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete upto plinth level. Thermo-Mechanically Treated bars of grade Fe-500D or more. 9 BAMBOO PILING including stiffness etc. using #Bhaluka bamboo# or big size #Jati# bamboo at river bank and water logging areas, including supply of bamboo and necessary ropes etc. complete. 10 12mm cement plaster of mix: 1:4 (1 cement: 4 coarse sand) 11 Spreading sand / filling, dry sand over sunken road surface, including carrying from a distance of 30.00 m. 12 Forest Royalty of 2% for Group C. Additional 10% Cess on forest royalties for each of MMDRRF and DMFT. SECTION B 1 Supply of Broken stone-Boulder broken (25mm graded down to 12mm), hard and clean. 2 Supply of Timber for shuttering DM3 3 Supply of Sand for general use with normal moisture content to be clean and free from clay rubbish M3 SECTION C 1 Carriage of material by mechanical transport including loading unloading and stacking: Cement, stone blocks, G.I., C.I., A.C. & C.C. pipes below 100 mm dia and other heavy materials: Beyond 4KM and Upto 5KM TON 2 Extra on Carriage of material by mechanical transport including loading unloading and stacking: Cement, stone blocks, G.I., C.I., A.C. & C.C. pipes below 100 mm dia and other heavy materials on every additional KM: Beyond 5KM and Upto 10KM TPM 3 Extra on Carriage of material by mechanical transport including loading unloading and stacking: Cement, stone blocks, G.I., C.I., A.C. & C.C. pipes below 100 mm dia and other heavy materials on every additional KM: Beyond 10KM and Upto 20KM TPM 4 Extra on Carriage of material by mechanical transport including loading unloading and stacking: Cement, stone blocks, G.I., C.I., A.C. & C.C. pipes below 100 mm dia and other heavy materials on every additional KM: Beyond 20KM TPM

Key Value

Document Fees
Refer document
EMD
Refer document
Tender Value
INR 1.40 Crore /-
Disclaimer :
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.
Tell us about your Product / Services,
We will Find Tenders for you

Copyright © 2025 · All Rights Reserved. Terms of Usage | Privacy Policy

For Tender Information Services Visit : TenderDetail