Tender For Testing Of Equipment At Various Stations Under Wrpl Jodhpur Base--- 1 Testing Of Equipment At Various Stations Under Wrpl Jodhpur Base 2 Testing Of Equipment At Smpl, Kot 3 Ultrasonic Thickness Testing Of Pressure Vesselspainting Of Date Of Testing, Serial No. & Next Due Date On Air Vessel As Per The Stipulations Of The Rajasthan Factory Rules , The Factories Act 1948 & Amendments There On And Issuing Certificate Of Testing / Inspection For Each Air Vessels Inclusive Of All Tools & Tackles, Labourers, Testing Equipment Etc., To The Satisfaction Of The Engineer-In-Charge. ( Frequency- Twice In A Year ) 4 Inspection, Hydrostatic Testing Of Air Pressure Vessels - Safe Working Pressure Equal To Or More Than 20 Kg / Sq. Cm, Painting Of Date Of Testing, Serial No. & Next Due Date On Air Vessels As Per The Stipulations Of The Rajasthan Factory Rules , The Factories Act 1948 & Amendments There On And Issuing Certificate Of Testing / Inspection For Each Air Vessels Inclusive Of All Tools & Tackles, Labourers, Testing Equipment Etc., To The Satisfaction Of The Engineer-In-Charge. ( Frequency- Once In Two Year ) 5 Inspection, Load Testing & Certification Of Hot / Eot Crane ( Including Chain Pulley Block, Sling Of Cranes ) Of 3 To 10 Ton Capacity, Painting Of Date Of Testing, Serial No. & Next Due Date On Crane As Per The Stipulations Of The Rajasthan Factory Rules , The Factories Act 1948 & Amendments There On And Issuing Certificate Of Testing / Inspection For Each Crane Including Manpower, Equipment, Tools & Tackles Like Hydra Etc., As Directed By Site Engineer / Engineer-In-Charge. Note: Dead Weights / Load Shall Be Provided By Iocl At Test Locations. ( Frequency- Once In A Year ) 6 Inspection, Load Testing & Certification Of Chain Pulley Blocks, High Mast Tower Pulleys, 1 To 5 Ton Capacity As Per The Stipulations Of The Rajasthan Factory Rules , The Factories Act 1948 & Amendments There On And Issuing Certificate Of Testing / Inspection For Each Chain Pulley Block Including Manpower, Equipment, Tools & Tackles Etc Like Hydra., As Directed By Site Engineer / Engineer-In-Charge. Note: Dead Weights / Load Shall Be Provided By Iocl At Test Locations. ( Frequency- Once In A Year ) 7 Physical Inspection & Testing Of Wire Rope Slings, D-Sackles, Web Sling As Per The Procedure Laiddown In The Factory Act 1948 And Rajasthan Factory Rule Prevailing As On Date And Submitting The Report Immediately After Completion Of The Inspection As Per Specification And Direction Of Engineer-In-Charge / Site Engineer, Including All Charges, Expenditures, Taxes For Carrying Out The Work. ( Once In A Year ) 8 Physical Inspection & Testing Of Safety Belts, As Per The Procedure Laid Down In The Factory Act 1948 And Rajasthan Factory Rule Prevailing As On Date And Submitting The Report Immediately After Completion Of The Inspectionas Per Specification And Direction Of Engineer-In-Charge / Siteengineer, Including All Charges, Expenditures, Taxes For Carrying Outthe Work. ( Once In Six Months ) 9 Repair And Servicing Of Hot / Eot Crane:- Complete Repair And Services Of Hot / Eot Crane Of 2 To 12 Ton Capacity Including Servicing Of All Auxiliaries Like Pulley Wheel, Pulley Chain, Guide Strip, Ball Valve, Girders, Rails, Etc., Alignment For Free Movement Of The Crane From One End To Other End & Vertical Movement And Cross Movement Including Manpower, Equipment, Tools & Tackles Etc., As Directed By Site Engineer / Engineer-In-Charge 10 Repair And Servicing Of Chain Pulley Blocks:- Complete Repair And Services Of Chain Pulley Blocks Of Capacity 1 To 5 Ton Including Servicing Of All Auxiliaries Like High Mast Tower Pulleys, Tripod Pulleys, Pulley Wheel, Pulley Chain, Guide Strip, Ball Valve Etc., Alignment For Free Movementincluding Manpower, Equipment, Tools & Tackles Etc., As Directed By Site Engineer / Engineer-In-Charge 11 Testing Of Equipment At Kspl, Kot 12 Ultrasonic Thickness Testing Of Pressure Vesselspainting Of Date Of Testing, Serial No. & Next Due Date On Air Vessel As Per The Stipulations Of The Rajasthan Factory Rules , The Factories Act 1948 & Amendments There On And Issuing Certificate Of Testing / Inspection For Each Air Vessels Inclusive Of All Tools & Tackles, Labourers, Testing Equipment Etc., To The Satisfaction Of The Engineer-In-Charge. ( Frequency- Twice In A Year ) 13 Inspection, Load Testing & Certification Of Hot / Eot Crane ( Including Chain Pulley Block, Sling Of Cranes ) Of 3 To 10 Ton Capacity, Painting Of Date Of Testing, Serial No. & Next Due Date On Crane As Per The Stipulations Of The Rajasthan Factory Rules , The Factories Act 1948 & Amendments There On And Issuing Certificate Of Testing / Inspection For Each Crane Including Manpower, Equipment, Tools & Tackles Like Hydra Etc., As Directed By Site Engineer / Engineer-In-Charge. Note: Dead Weights / Load Shall Be Provided By Iocl At Test Locations. ( Frequency- Once In A Year ) 14 Inspection, Load Testing & Certification Of Chain Pulley Blocks, High Mast Tower Pulleys, 1 To 5 Ton Capacity As Per The Stipulations Of The Rajasthan Factory Rules , The Factories Act 1948 & Amendments There On And Issuing Certificate Of Testing / Inspection For Each Chain Pulley Block Including Manpower, Equipment, Tools & Tackles Etc Like Hydra., As Directed By Site Engineer / Engineer-In-Charge. Note: Dead Weights / Load Shall Be Provided By Iocl At Test Locations. ( Frequency- Once In A Year ) 15 Physical Inspection & Testing Of Wire Rope Slings, D-Sackles, Web Sling As Per The Procedure Laiddown In The Factory Act 1948 And Rajasthan Factory Rule Prevailing As On Date And Submitting The Report Immediately After Completion Of The Inspection As Per Specification And Direction Of Engineer-In-Charge / Site Engineer, Including All Charges, Expenditures, Taxes For Carrying Out The Work. ( Once In A Year ) 16 Physical Inspection & Testing Of Safety Belts, As Per The Procedure Laid Down In The Factory Act 1948 And Rajasthan Factory Rule Prevailing As On Date And Submitting The Report Immediately After Completion Of The Inspectionas Per Specification And Direction Of Engineer-In-Charge / Siteengineer, Including All Charges, Expenditures, Taxes For Carrying Outthe Work. ( Once In Six Months ) 17 Repair And Servicing Of Hot / Eot Crane:- Complete Repair And Services Of Hot / Eot Crane Of 2 To 12 Ton Capacity Including Servicing Of All Auxiliaries Like Pulley Wheel, Pulley Chain, Guide Strip, Ball Valve, Girders, Rails, Etc., Alignment For Free Movement Of The Crane From One End To Other End & Vertical Movement And Cross Movement Including Manpower, Equipment, Tools & Tackles Etc., As Directed By Site Engineer / Engineer-In-Charge 18 Repair And Servicing Of Chain Pulley Blocks:- Complete Repair And Services Of Chain Pulley Blocks Of Capacity 1 To 5 Ton Including Servicing Of All Auxiliaries Like High Mast Tower Pulleys, Tripod Pulleys, Pulley Wheel, Pulley Chain, Guide Strip, Ball Valve Etc., Alignment For Free Movementincluding Manpower, Equipment, Tools & Tackles Etc., As Directed By Site Engineer / Engineer-In-Charge 19 Testing Of Equipment At Smpl Rajola 20 Ultrasonic Thickness Testing Of Pressure Vesselspainting Of Date Of Testing, Serial No. & Next Due Date On Air Vessel As Per The Stipulations Of The Rajasthan Factory Rules , The Factories Act 1948 & Amendments There On And Issuing Certificate Of Testing / Inspection For Each Air Vessels Inclusive Of All Tools & Tackles, Labourers, Testing Equipment Etc., To The Satisfaction Of The Engineer-In-Charge. ( Frequency- Twice In A Year ) 21 Inspection, Hydrostatic Testing Of Air Pressure Vessels - Safe Working Pressure Equal To Or More Than 20 Kg / Sq. Cm, Painting Of Date Of Testing, Serial No. & Next Due Date On Air Vessels As Per The Stipulations Of The Rajasthan Factory Rules , The Factories Act 1948 & Amendments There On And Issuing Certificate Of Testing / Inspection For Each Air Vessels Inclusive Of All Tools & Tackles, Labourers, Testing Equipment Etc., To The Satisfaction Of The Engineer-In-Charge. ( Frequency- Once In Two Year ) 22 Inspection, Load Testing & Certification Of Hot / Eot Crane ( Including Chain Pulley Block, Sling Of Cranes ) Of 3 To 10 Ton Capacity, Painting Of Date Of Testing, Serial No. & Next Due Date On Crane As Per The Stipulations Of The Rajasthan Factory Rules , The Factories Act 1948 & Amendments There On And Issuing Certificate Of Testing / Inspection For Each Crane Including Manpower, Equipment, Tools & Tackles Like Hydra Etc., As Directed By Site Engineer / Engineer-In-Charge. Note: Dead Weights / Load Shall Be Provided By Iocl At Test Locations. ( Frequency- Once In A Year ) 23 Inspection, Load Testing & Certification Of Chain Pulley Blocks, High Mast Tower Pulleys, 1 To 5 Ton Capacity As Per The Stipulations Of The Rajasthan Factory Rules , The Factories Act 1948 & Amendments There On And Issuing Certificate Of Testing / Inspection For Each Chain Pulley Block Including Manpower, Equipment, Tools & Tackles Etc Like Hydra., As Directed By Site Engineer / Engineer-In-Charge. Note: Dead Weights / Load Shall Be Provided By Iocl At Test Locations. ( Frequency- Once In A Year ) 24 Physical Inspection & Testing Of Wire Rope Slings, D-Sackles, Web Sling As Per The Procedure Laiddown In The Factory Act 1948 And Rajasthan Factory Rule Prevailing As On Date And Submitting The Report Immediately After Completion Of The Inspection As Per Specification And Direction Of Engineer-In-Charge / Site Engineer, Including All Charges, Expenditures, Taxes For Carrying Out The Work. ( Once In A Year ) 25 Physical Inspection & Testing Of Safety Belts, As Per The Procedure Laid Down In The Factory Act 1948 And Rajasthan Factory Rule Prevailing As On Date And Submitting The Report Immediately After Completion Of The Inspectionas Per Specification And Direction Of Engineer-In-Charge / Siteengineer, Including All Charges, Expenditures, Taxes For Carrying Outthe Work. ( Once In Six Months ) 26 Repair And Servicing Of Hot / Eot Crane:- Complete Repair And Services Of Hot / Eot Crane Of 2 To 12 Ton Capacity Including Servicing Of All Auxiliaries Like Pulley Wheel, Pulley Chain, Guide Strip, Ball Valve, Girders, Rails, Etc., Alignment For Free Movement Of The Crane From One End To Other End & Vertical Movement And Cross Movement Including Manpower, Equipment, Tools & Tackles Etc., As Directed By Site Engineer / Engineer-In-Charge 27 Repair And Servicing Of Chain Pulley Blocks:- Complete Repair And Services Of Chain Pulley Blocks Of Capacity 1 To 5 Ton Including Servicing Of All Auxiliaries Like High Mast Tower Pulleys, Tripod Pulleys, Pulley Wheel, Pulley Chain, Guide Strip, Ball Valve Etc., Alignment For Free Movementincluding Manpower, Equipment, Tools & Tackles Etc., As Directed By Site Engineer / Engineer-In-Charge 28 Testing Of Equipment At Kspl Jodhpur 29 Ultrasonic Thickness Testing Of Pressure Vesselspainting Of Date Of Testing, Serial No. & Next Due Date On Air Vessel As Per The Stipulations Of The Rajasthan Factory Rules , The Factories Act 1948 & Amendments There On And Issuing Certificate Of Testing / Inspection For Each Air Vessels Inclusive Of All Tools & Tackles, Labourers, Testing Equipment Etc., To The Satisfaction Of The Engineer-In-Charge. ( Frequency- Twice In A Year ) 30 Inspection, Hydrostatic Testing Of Air Pressure Vessels - Safe Working Pressure Equal To Or More Than 20 Kg / Sq. Cm, Painting Of Date Of Testing, Serial No. & Next Due Date On Air Vessels As Per The Stipulations Of The Rajasthan Factory Rules , The Factories Act 1948 & Amendments There On And Issuing Certificate Of Testing / Inspection For Each Air Vessels Inclusive Of All Tools & Tackles, Labourers, Testing Equipment Etc., To The Satisfaction Of The Engineer-In-Charge. ( Frequency- Once In Two Year ) 31 Inspection, Load Testing & Certification Of Hot / Eot Crane ( Including Chain Pulley Block, Sling Of Cranes ) Of 3 To 10 Ton Capacity, Painting Of Date Of Testing, Serial No. & Next Due Date On Crane As Per The Stipulations Of The Rajasthan Factory Rules , The Factories Act 1948 & Amendments There On And Issuing Certificate Of Testing / Inspection For Each Crane Including Manpower, Equipment, Tools & Tackles Like Hydra Etc., As Directed By Site Engineer / Engineer-In-Charge. Note: Dead Weights / Load Shall Be Provided By Iocl At Test Locations. ( Frequency- Once In A Year ) 32 Inspection, Load Testing & Certification Of Chain Pulley Blocks, High Mast Tower Pulleys, 1 To 5 Ton Capacity As Per The Stipulations Of The Rajasthan Factory Rules , The Factories Act 1948 & Amendments There On And Issuing Certificate Of Testing / Inspection For Each Chain Pulley Block Including Manpower, Equipment, Tools & Tackles Etc Like Hydra., As Directed By Site Engineer / Engineer-In-Charge. Note: Dead Weights / Load Shall Be Provided By Iocl At Test Locations. ( Frequency- Once In A Year ) 33 Physical Inspection & Testing Of Wire Rope Slings, D-Sackles, Web Sling As Per The Procedure Laiddown In The Factory Act 1948 And Rajasthan Factory Rule Prevailing As On Date And Submitting The Report Immediately After Completion Of The Inspection As Per Specification And Direction Of Engineer-In-Charge / Site Engineer, Including All Charges, Expenditures, Taxes For Carrying Out The Work. ( Once In A Year ) 34 Physical Inspection & Testing Of Safety Belts, As Per The Procedure Laid Down In The Factory Act 1948 And Rajasthan Factory Rule Prevailing As On Date And Submitting The Report Immediately After Completion Of The Inspectionas Per Specification And Direction Of Engineer-In-Charge / Siteengineer, Including All Charges, Expenditures, Taxes For Carrying Outthe Work. ( Once In Six Months ) 35 Repair And Servicing Of Hot / Eot Crane:- Complete Repair And Services Of Hot / Eot Crane Of 2 To 12 Ton Capacity Including Servicing Of All Auxiliaries Like Pulley Wheel, Pulley Chain, Guide Strip, Ball Valve, Girders, Rails, Etc., Alignment For Free Movement Of The Crane From One End To Other End & Vertical Movement And Cross Movement Including Manpower, Equipment, Tools & Tackles Etc., As Directed By Site Engineer / Engineer-In-Charge 36 Repair And Servicing Of Chain Pulley Blocks:- Complete Repair And Services Of Chain Pulley Blocks Of Capacity 1 To 5 Ton Including Servicing Of All Auxiliaries Like High Mast Tower Pulleys, Tripod Pulleys, Pulley Wheel, Pulley Chain, Guide Strip, Ball Valve Etc., Alignment For Free Movementincluding Manpower, Equipment, Tools & Tackles Etc., As Directed By Site Engineer / Engineer-In-Charge 37 Testing Of Equipment At Smpl Sendra 38 Ultrasonic Thickness Testing Of Pressure Vesselspainting Of Date Of Testing, Serial No. & Next Due Date On Air Vessel As Per The Stipulations Of The Rajasthan Factory Rules , The Factories Act 1948 & Amendments There On And Issuing Certificate Of Testing / Inspection For Each Air Vessels Inclusive Of All Tools & Tackles, Labourers, Testing Equipment Etc., To The Satisfaction Of The Engineer-In-Charge. ( Frequency- Twice In A Year ) 39 Inspection, Hydrostatic Testing Of Air Pressure Vessels - Safe Working Pressure Equal To Or More Than 20 Kg / Sq. Cm, Painting Of Date Of Testing, Serial No. & Next Due Date On Air Vessels As Per The Stipulations Of The Rajasthan Factory Rules , The Factories Act 1948 & Amendments There On And Issuing Certificate Of Testing / Inspection For Each Air Vessels Inclusive Of All Tools & Tackles, Labourers, Testing Equipment Etc., To The Satisfaction Of The Engineer-In-Charge. ( Frequency- Once In Two Year ) 40 Inspection, Load Testing & Certification Of Chain Pulley Blocks, High Mast Tower Pulleys, 1 To 5 Ton Capacity As Per The Stipulations Of The Rajasthan Factory Rules , The Factories Act 1948 & Amendments There On And Issuing Certificate Of Testing / Inspection For Each Chain Pulley Block Including Manpower, Equipment, Tools & Tackles Etc Like Hydra., As Directed By Site Engineer / Engineer-In-Charge. Note: Dead Weights / Load Shall Be Provided By Iocl At Test Locations. ( Frequency- Once In A Year ) 41 Physical Inspection & Testing Of Wire Rope Slings, D-Sackles, Web Sling As Per The Procedure Laiddown In The Factory Act 1948 And Rajasthan Factory Rule Prevailing As On Date And Submitting The Report Immediately After Completion Of The Inspection As Per Specification And Direction Of Engineer-In-Charge / Site Engineer, Including All Charges, Expenditures, Taxes For Carrying Out The Work. ( Once In A Year ) 42 Physical Inspection & Testing Of Safety Belts, As Per The Procedure Laid Down In The Factory Act 1948 And Rajasthan Factory Rule Prevailing As On Date And Submitting The Report Immediately After Completion Of The Inspectionas Per Specification And Direction Of Engineer-In-Charge / Siteengineer, Including All Charges, Expenditures, Taxes For Carrying Outthe Work. ( Once In Six Months ) 43 Repair And Servicing Of Chain Pulley Blocks:- Complete Repair And Services Of Chain Pulley Blocks Of Capacity 1 To 5 Ton Including Servicing Of All Auxiliaries Like High Mast Tower Pulleys, Tripod Pulleys, Pulley Wheel, Pulley Chain, Guide Strip, Ball Valve Etc., Alignment For Free Movementincluding Manpower, Equipment, Tools & Tackles Etc., As Directed By Site Engineer / Engineer-In-Charge 44 Testing Of Equipments At Smpl Ramsar 45 Ultrasonic Thickness Testing Of Pressure Vesselspainting Of Date Of Testing, Serial No. & Next Due Date On Air Vessel As Per The Stipulations Of The Rajasthan Factory Rules , The Factories Act 1948 & Amendments There On And Issuing Certificate Of Testing / Inspection For Each Air Vessels Inclusive Of All Tools & Tackles, Labourers, Testing Equipment Etc., To The Satisfaction Of The Engineer-In-Charge. ( Frequency- Twice In A Year ) 46 Inspection, Hydrostatic Testing Of Air Pressure Vessels - Safe Working Pressure Equal To Or More Than 20 Kg / Sq. Cm, Painting Of Date Of Testing, Serial No. & Next Due Date On Air Vessels As Per The Stipulations Of The Rajasthan Factory Rules , The Factories Act 1948 & Amendments There On And Issuing Certificate Of Testing / Inspection For Each Air Vessels Inclusive Of All Tools & Tackles, Labourers, Testing Equipment Etc., To The Satisfaction Of The Engineer-In-Charge. ( Frequency- Once In Two Year ) 47 Inspection, Load Testing & Certification Of Hot / Eot Crane ( Including Chain Pulley Block, Sling Of Cranes ) Of 3 To 10 Ton Capacity, Painting Of Date Of Testing, Serial No. & Next Due Date On Crane As Per The Stipulations Of The Rajasthan Factory Rules , The Factories Act 1948 & Amendments There On And Issuing Certificate Of Testing / Inspection For Each Crane Including Manpower, Equipment, Tools & Tackles Like Hydra Etc., As Directed By Site Engineer / Engineer-In-Charge. Note: Dead Weights / Load Shall Be Provided By Iocl At Test Locations. ( Frequency- Once In A Year ) 48 Inspection, Load Testing & Certification Of Chain Pulley Blocks, High Mast Tower Pulleys, 1 To 5 Ton Capacity As Per The Stipulations Of The Rajasthan Factory Rules , The Factories Act 1948 & Amendments There On And Issuing Certificate Of Testing / Inspection For Each Chain Pulley Block Including Manpower, Equipment, Tools & Tackles Etc Like Hydra., As Directed By Site Engineer / Engineer-In-Charge. Note: Dead Weights / Load Shall Be Provided By Iocl At Test Locations. ( Frequency- Once In A Year ) 49 Physical Inspection & Testing Of Wire Rope Slings, D-Sackles, Web Sling As Per The Procedure Laiddown In The Factory Act 1948 And Rajasthan Factory Rule Prevailing As On Date And Submitting The Report Immediately After Completion Of The Inspection As Per Specification And Direction Of Engineer-In-Charge / Site Engineer, Including All Charges, Expenditures, Taxes For Carrying Out The Work. ( Once In A Year ) 50 Physical Inspection & Testing Of Safety Belts, As Per The Procedure Laid Down In The Factory Act 1948 And Rajasthan Factory Rule Prevailing As On Date And Submitting The Report Immediately After Completion Of The Inspectionas Per Specification And Direction Of Engineer-In-Charge / Siteengineer, Including All Charges, Expenditures, Taxes For Carrying Outthe Work. ( Once In Six Months ) 51 Repair And Servicing Of Hot / Eot Crane:- Complete Repair And Services Of Hot / Eot Crane Of 2 To 12 Ton Capacity Including Servicing Of All Auxiliaries Like Pulley Wheel, Pulley Chain, Guide Strip, Ball Valve, Girders, Rails, Etc., Alignment For Free Movement Of The Crane From One End To Other End & Vertical Movement And Cross Movement Including Manpower, Equipment, Tools & Tackles Etc., As Directed By Site Engineer / Engineer-In-Charge 52 Repair And Servicing Of Chain Pulley Blocks:- Complete Repair And Services Of Chain Pulley Blocks Of Capacity 1 To 5 Ton Including Servicing Of All Auxiliaries Like High Mast Tower Pulleys, Tripod Pulleys, Pulley Wheel, Pulley Chain, Guide Strip, Ball Valve Etc., Alignment For Free Movementincluding Manpower, Equipment, Tools & Tackles Etc., As Directed By Site Engineer / Engineer-In-Charge 53 Testing Of Equipments At Mppl, Kot 54 Ultrasonic Thickness Testing Of Pressure Vesselspainting Of Date Of Testing, Serial No. & Next Due Date On Air Vessel As Per The Stipulations Of The Rajasthan Factory Rules , The Factories Act 1948 & Amendments There On And Issuing Certificate Of Testing / Inspection For Each Air Vessels Inclusive Of All Tools & Tackles, Labourers, Testing Equipment Etc., To The Satisfaction Of The Engineer-In-Charge. ( Frequency- Twice In A Year ) 55 Inspection, Hydrostatic Testing Of Air Pressure Vessels - Safe Working Pressure Equal To Or More Than 20 Kg / Sq. Cm, Painting Of Date Of Testing, Serial No. & Next Due Date On Air Vessels As Per The Stipulations Of The Rajasthan Factory Rules , The Factories Act 1948 & Amendments There On And Issuing Certificate Of Testing / Inspection For Each Air Vessels Inclusive Of All Tools & Tackles, Labourers, Testing Equipment Etc., To The Satisfaction Of The Engineer-In-Charge. ( Frequency- Once In Two Year ) 56 Inspection, Load Testing & Certification Of Hot / Eot Crane ( Including Chain Pulley Block, Sling Of Cranes ) Of 3 To 10 Ton Capacity, Painting Of Date Of Testing, Serial No. & Next Due Date On Crane As Per The Stipulations Of The Rajasthan Factory Rules , The Factories Act 1948 & Amendments There On And Issuing Certificate Of Testing / Inspection For Each Crane Including Manpower, Equipment, Tools & Tackles Like Hydra Etc., As Directed By Site Engineer / Engineer-In-Charge. Note: Dead Weights / Load Shall Be Provided By Iocl At Test Locations. ( Frequency- Once In A Year ) 57 Inspection, Load Testing & Certification Of Chain Pulley Blocks, High Mast Tower Pulleys, 1 To 5 Ton Capacity As Per The Stipulations Of The Rajasthan Factory Rules , The Factories Act 1948 & Amendments There On And Issuing Certificate Of Testing / Inspection For Each Chain Pulley Block Including Manpower, Equipment, Tools & Tackles Etc Like Hydra., As Directed By Site Engineer / Engineer-In-Charge. Note: Dead Weights / Load Shall Be Provided By Iocl At Test Locations. ( Frequency- Once In A Year ) 58 Physical Inspection & Testing Of Wire Rope Slings, D-Sackles, Web Sling As Per The Procedure Laiddown In The Factory Act 1948 And Rajasthan Factory Rule Prevailing As On Date And Submitting The Report Immediately After Completion Of The Inspection As Per Specification And Direction Of Engineer-In-Charge / Site Engineer, Including All Charges, Expenditures, Taxes For Carrying Out The Work. ( Once In A Year ) 59 Physical Inspection & Testing Of Safety Belts, As Per The Procedure Laid Down In The Factory Act 1948 And Rajasthan Factory Rule Prevailing As On Date And Submitting The Report Immediately After Completion Of The Inspectionas Per Specification And Direction Of Engineer-In-Charge / Siteengineer, Including All Charges, Expenditures, Taxes For Carrying Outthe Work. ( Once In Six Months ) 60 Repair And Servicing Of Hot / Eot Crane:- Complete Repair And Services Of Hot / Eot Crane Of 2 To 12 Ton Capacity Including Servicing Of All Auxiliaries Like Pulley Wheel, Pulley Chain, Guide Strip, Ball Valve, Girders, Rails, Etc., Alignment For Free Movement Of The Crane From One End To Other End & Vertical Movement And Cross Movement Including Manpower, Equipment, Tools & Tackles Etc., As Directed By Site Engineer / Engineer-In-Charge 61 Repair And Servicing Of Chain Pulley Blocks:- Complete Repair And Services Of Chain Pulley Blocks Of Capacity 1 To 5 Ton Including Servicing Of All Auxiliaries Like High Mast Tower Pulleys, Tripod Pulleys, Pulley Wheel, Pulley Chain, Guide Strip, Ball Valve Etc., Alignment For Free Movementincluding Manpower, Equipment, Tools & Tackles Etc., As Directed By Site Engineer / Engineer-In-Charge 62 Testing Of Equipments At Mppl Beawar 63 Ultrasonic Thickness Testing Of Pressure Vesselspainting Of Date Of Testing, Serial No. & Next Due Date On Air Vessel As Per The Stipulations Of The Rajasthan Factory Rules , The Factories Act 1948 & Amendments There On And Issuing Certificate Of Testing / Inspection For Each Air Vessels Inclusive Of All Tools & Tackles, Labourers, Testing Equipment Etc., To The Satisfaction Of The Engineer-In-Charge. ( Frequency- Twice In A Year ) 64 Inspection, Hydrostatic Testing Of Air Pressure Vessels - Safe Working Pressure Equal To Or More Than 20 Kg / Sq. Cm, Painting Of Date Of Testing, Serial No. & Next Due Date On Air Vessels As Per The Stipulations Of The Rajasthan Factory Rules , The Factories Act 1948 & Amendments There On And Issuing Certificate Of Testing / Inspection For Each Air Vessels Inclusive Of All Tools & Tackles, Labourers, Testing Equipment Etc., To The Satisfaction Of The Engineer-In-Charge. ( Frequency- Once In Two Year ) 65 Inspection, Load Testing & Certification Of Hot / Eot Crane ( Including Chain Pulley Block, Sling Of Cranes ) Of 3 To 10 Ton Capacity, Painting Of Date Of Testing, Serial No. & Next Due Date On Crane As Per The Stipulations Of The Rajasthan Factory Rules , The Factories Act 1948 & Amendments There On And Issuing Certificate Of Testing / Inspection For Each Crane Including Manpower, Equipment, Tools & Tackles Like Hydra Etc., As Directed By Site Engineer / Engineer-In-Charge. Note: Dead Weights / Load Shall Be Provided By Iocl At Test Locations. ( Frequency- Once In A Year ) 66 Inspection, Load Testing & Certification Of Chain Pulley Blocks, High Mast Tower Pulleys, 1 To 5 Ton Capacity As Per The Stipulations Of The Rajasthan Factory Rules , The Factories Act 1948 & Amendments There On And Issuing Certificate Of Testing / Inspection For Each Chain Pulley Block Including Manpower, Equipment, Tools & Tackles Etc Like Hydra., As Directed By Site Engineer / Engineer-In-Charge. Note: Dead Weights / Load Shall Be Provided By Iocl At Test Locations. ( Frequency- Once In A Year ) 67 Physical Inspection & Testing Of Wire Rope Slings, D-Sackles, Web Sling As Per The Procedure Laiddown In The Factory Act 1948 And Rajasthan Factory Rule Prevailing As On Date And Submitting The Report Immediately After Completion Of The Inspection As Per Specification And Direction Of Engineer-In-Charge / Site Engineer, Including All Charges, Expenditures, Taxes For Carrying Out The Work. ( Once In A Year ) 68 Physical Inspection & Testing Of Safety Belts, As Per The Procedure Laid Down In The Factory Act 1948 And Rajasthan Factory Rule Prevailing As On Date And Submitting The Report Immediately After Completion Of The Inspectionas Per Specification And Direction Of Engineer-In-Charge / Siteengineer, Including All Charges, Expenditures, Taxes For Carrying Outthe Work. ( Once In Six Months ) 69 Repair And Servicing Of Hot / Eot Crane:- Complete Repair And Services Of Hot / Eot Crane Of 2 To 12 Ton Capacity Including Servicing Of All Auxiliaries Like Pulley Wheel, Pulley Chain, Guide Strip, Ball Valve, Girders, Rails, Etc., Alignment For Free Movement Of The Crane From One End To Other End & Vertical Movement And Cross Movement Including Manpower, Equipment, Tools & Tackles Etc., As Directed By Site Engineer / Engineer-In-Charge 70 Repair And Servicing Of Chain Pulley Blocks:- Complete Repair And Services Of Chain Pulley Blocks Of Capacity 1 To 5 Ton Including Servicing Of All Auxiliaries Like High Mast Tower Pulleys, Tripod Pulleys, Pulley Wheel, Pulley Chain, Guide Strip, Ball Valve Etc., Alignment For Free Movementincluding Manpower, Equipment, Tools & Tackles Etc., As Directed By Site Engineer / Engineer-In-Charge