Tender For Devathur Panchayat Agamt-Ii 2023-24- Works 5Nos Thoppampatti Block. 1 1. Deepening Strengthening Of Kodangikulam With Construction Of Bathing Ghat & Baby Pond At Kodagipatty H / O Devathurestimate Amount Rs.9.60Lakhs 2 Cleaning Light Jungle ( Based On Standardschedule Of Rates Vid., W0002 ) 3 Earth Work In All Soils Except Hard Rock Requiring Blasting And Conveying For Formation Of Bund With Lead Of 0 To 100 Metre Deploying Earth Moving Machinery And Tippers Including Benching, Formation Of Bunds, Breaking Clods, Sectioning Etc., Complete ( Based On Standard Schedule Of Rates Vid., W0085 ) 4 Main Pond 5 Baby Pond 6 Channel Area 7 Civil Work 8 Earth Work Excavating And Depositing On Bank With An Initial Lead Of 10M And Initial Lift Of 2M In Hard Stiff Clay Stiff Block Cotton, Hard Red Earth ShaleS, Murrams, Gravel, Stoney Earth And Earth Mixed With Small Size Boulders And Hard Gravelly Soil Ss 20B For Foundation 9 Supplying And Filling With Sand For Foundation And Basement Layers Of Not More Than 15 Cm Thick Well Rammed Andwatering Complying With Standard Specification 10 Cement Concrete For Foundation 1:4:8 Using 40Mm Hbgs Jelly Including All Incidental Charges Such As Bailing Out Water Finishing Curing Complete Complying With Standardspecification 11 Providing Random Rubble Masonry In Cement Mortar 1:5 Mix With Simultaneous Pointing Including Cost Andconveyance Pf All Materials To Site And All Labour Charges Etc Complete 12 Plastering With Cement Mortar 1:3 Mix To 12 Mm Thick Including Cost And Conveyance Of All Materials To Site And All Labour Charges Etc Complete For 10 Sqm 13 Provision For Name Board Charges 14 Gst Amount For Providing Service To Government Contract Works For The Above Construction Works. { Gst Amount Is The Total Gst Amount For Total Overall Quoted Amount Above This Row In Column Bb For All Works In This Package } 15 2. Providing Paver Block @ Tamilan Nagar Ad Colony Muneeswaran House To Perumal House @ Kodangipatty H / O Devathurestimate Amount Rs.2.00 Lakhs 16 Earthwork Excavation In All Clauses Of Soils And Depositing On Bank With Initial Lead And Lift For Foundation As Per Ss20b 17 Cement Concrete 1:4:8 Mix Using 40Mm Iss Hbg Metal Including Cost And Conveyance Of All Matials To Site And All Labour Charges Etc., Complete. 18 Supply And Errecting Centering Charges For Plain Surface Including Cost & Conveyance Of All Materials To Site And All Labour Charges Etc., Complete. 19 Cc 1:3:6 Mix Using 20Mm Iss Hbg Metal Including Cost & Conveyance Of All Materials To Site And All Labour Charges Etc., Complete. 20 Construction Of Granular Sub Base By Providing With Graded Materials Of Size 9.5Mm To 4.75Mm Metal In 66% & 2.36Mm In 34% Including Spreading In Uniform Layers With Motor Grader On Propared Surface, Mixing By Mix In Place Method With Rotavator At Omc And Compacting With Three Wheeler 80 - 100 Kn Static Roller Coa Pcity To Acheive The Desired Dinsity Etc., Completeas Technical Specification Clause 402 Grading C. 21 Providing And Laying Of Interlocking Concrete Block ( Surface Textured ) Pavements Having Thickness 60Mm And Compacted Over A Thin Bedding Sand Layer Of 30 Mm Thickness And Joints Shall Be Filled By Fine Sand Of Specified Grading As Per Table 1500.6 Of Specification Of Rural Roads-2014 Andtechnical Specification Clause 1504. 22 Provision For Name Board Charges 23 Gst Amount For Providing Service To Government Contract Works For The Above Construction Works. { Gst Amount Is The Total Gst Amount For Total Overall Quoted Amount Above This Row In Column Bb For All Works In This Package } 24 3.Construction Of Anganwadi Near Ad Colony At Perumalnaickenvalasu H / O Devathur Panchayat.Estimate Amount : Rs.14.31 Lakhs 25 Earthwork Excavation And Depositing On Bank With Initial Lead And Lift In Hard Gravelly Soil For Foundation Etc. Complete. 26 Cement Concrete 1:4:8 Mix Using 40Mm Iss Hbg Metal Including Cost And Conveyance Of All Matials To Site And All Labour Charges Etc., Complete 27 Filling In Foundation And Basement With Conveyed Gravel In Layers Of Not More Than 15Cm. Thick Well Rammed, Watered And Consolidated Complying With Standard Specifications Etc., Complete. 28 Brick Work In C.M 1:5 Mix Using Country Bricks Including Cost & Conveyance Of All Materials To Site And All Labour Charges Etc., Complete. 29 Supplying And Erecting Shuttering Including Necessary Support For Plane Surface In Foundation Basement And Roof Labs Strutting Upto 3.29M Height For Plane Surfaces For Floors For Rcc Column Footings Columns Plinth Beam And Connected With Foundations 30 Supplying, Fabricating And Placing In Position Mild Steel Or Ribbed To Steel And All Reinforced Cement Concrete Works As Per The Design Given Including Cost Of Steel And Binding Wire In All Floors Etc. Complete. 31 Rcc 1:1.5:3 Mix Using 20 Mm Iss Hbg Metal Including Cost & Conveyance Of All Materials To Site And All Labour Charges Etc., Complete. 32 Cement Concrete 1:3:6 Mix Using 20Mm Metal Including Cost And Conveyance Of All Materials To Site And Labour Charges Etc. Complete. 33 Cement Concrete 1:2:4 Mix Using 20Mm Metal Including Cost And Conveyance Of All Materials To Site And Labour Charges Etc. Complete. 34 Weathering Course With Best Quality Broken Brick Jelly Of Size 20Mm Uniform Gauge In Pure Slaked Lime ( No M.Sand To Be Listed ) Over The Rcc Roof Slab In The Proposition Being Brickjelly To Lime 32:12:1 / 2 By Volume And Laid Over Into A Single Layer And Cons 35 Finishing The Top Of The Roof With One Course Of Machine Pressedtiles Of Size 20 Cm X 2 Cm Of Approved Quality Laid In Cement Mortar 1:3 ( One Cement And Three M.Sand ) 12 Mm Thick Mixed With Water Proofing Compound Conforming To Iss By 2% Weight Of Cement Us 36 Paving The Floor With Plain Marbonite Tiles Of Any Colour And Any Size Laid In Cm 1:2 20Mm Thick And Pointing With White Cement 0.4Kg / Sqm Mixed With Colouring Pigment To Suit The Colour Of The Tiles Including Finishing The Joint Neatly Complying With Std Specification. 37 Dadooing Walls With Glazed Tiles Of Any Colour And Any Size Laid In Cm 1:2, 10Mm Thick. And Pointing With White Cement 0.4 Kg Per Sqm Mixed With Colouring Pigment To Siut The Colour Of The Tiles Including Finishing The Joints Neatly Complete 38 Providing The Following Thickness Of Granolithic Pattern Floor Finish With Plain Cement Concrete 1 : 2 : 4 Mix Using 10-12Mm Isshbg Metal And The Top Rubed Smooth Etc., Complete 25Mm Thickness 39 Plastering With Cm 1:3 Mix 10Mm Thick Including Cost And Conveyance Of All Materials To Site And Labour Charges Etc. Complete. 40 Plastering With Cm 1:5 Mix 12Mm Thick Including Cost And Conveyance Of All Materials To Site And Labour Charges Etc. Complete. 41 Supplying & Fixing In Positionof Indian Type Baby Water Closet Including Cost And Conveyace Of All Materials To Site Etc. Complete. 42 Iwc 43 Ewc 44 Supplying And Fabrication Of Steel Doord ( 1.00X2.10M ) 45 Supplying And Fabrication Of Steel Doord ( 1.10X2.10M ) 46 Supplying And Fabrication Of Steel Door D1 ( 0.75X1.80M ) 47 Supplying And Fabrication Of Steel Window W ( 1.2X1.3M ) 48 Supplying And Fabrication Of Steel Ventilator ( 0.60X0.45M ) 49 Providing Rain Water Pipe Using 110Mm Pvc Pipe Including All Labour Charges Etc. 50 Colour Washing Two Coatswith Approved Quality Of Oil Bound Distemper Withgood Colour Pigments With Primerincluding All Charges Etc. 51 Painting Two Coats With Best Quality Of Ready Mixed Plastic Emulison Of Ist Class Paintwith Appd. Colour Approved By The Departmental Officersincluding Cost & Conveyance Of All Materials To Site And All Labour Charges Etc., Complete. 52 Painting Two Coats For Black Board Including All Charges Etc. Complete 53 Painting Two Coats Over New Iron Work Using Synthetic Enamel Paint Without Primer Including Cost And Conveyace Of All Materials To Site Etc. Complete. 54 Supply And Fixing Of 16 Ampsdpic Switch Of 500V Grade With Fuse And Nutralon Suitable T.W. Board With Painting Of Suitable Colour With Pwd Earthing ( Sd No.142 ) 55 Supply And Run Of 2 Of 6 Sq. Mm ( 84 / 0.30 ) Polythene Insulated And Pvc Unsheeted S.C. Alu Cable Of 1100 V On 7 / 20 Gi Bearerwirefor Service Connection Main -Sd.66 56 Supply And Run Of 2 X1.5Sq. Mm ( 22 / .3 ) Pvc Insulated Sc Unsheeted Cu. Conductor Of 1100Grade In 25Mm Dia Gi Pipe ( GlassB ) Suitably Bent At Both Ends With Necessary Angle Iron Upright And End Supports For Mains Sd 69 57 Supply And Fixing Of 11W Cfl Lamp For Existing Bh Point. ( Data - B ) Sd 80 58 Supply And Fixing Of W.T. Bulk Head Fitting Complete With Guard Suitable For Lamp With 60 W Bulb With Pvc Unsheated Leads From Terminal To The Fitting - Sd. 84 59 Wiring With 2 X 1.5 Sq.Mm Pvc Uncheated Sc Cu.Cable Of 1100 V Grade In Suitable Pvc Rigid Pipe On Wall And Ceiling With Pvc Accessories With T.W. Switch Box In Flush With Wall, Covered With Nylon Sheet Of 3Mm Thick With Painting Of Suitable Colour For Open Light Point & Fan Point Sd 17 60 Wiring With 2 X 2.5 Sq.Mm Pvc Uncheated Sc Alu.Cable Of 650V Grade In Suitable Pvc Rigid Pipe On Wall And Ceiling With Pvc Accessories With 150 X 100 X 113Mm T.W. Switch Box In Flush With Wall, Covered With Nylon Sheet Of 3Mm Thick 5 Amps 3 Pin Non - Inte Plug Point. Sd 36 61 Supply And Fixing Of Ceiling Fan ( Crompton Make ) Including Cost And Conveyance Of All Materials And Labour Cherges Etc Complete.Ceiling Fan Sd 114 62 Supply And Fixing Of Ac Exhaust Fan 300Mm Sweep Complete Without Provision Of Hole In The Wall Exhaust Fan 300Mm Sd 115 63 Supply And Fixing Of Main Service Board.Etc Complete. 64 Provision For Cartoon Paintings 65 Sub Estimate Providing Pipe Line Arrangements 66 Supply Of Following Materials Including All Cost Etc Complete 67 63Mm Pvc Pipe 4Ksc 68 63Mm Pvc Mta 69 63Mm Pvc Bend 70 1000 Litre Hdpe Tank 71 Earth Work Excavation In All Clauses Of Soil As Per Ss20b. 72 Pipe Line 73 Provision For Name Board 74 Supplying And Fixing Of Rcc Jolly Including All Charges Etc. 75 Construction Of Rain Water Harvesting Including All Charges Etc. 76 Gst Amount For Providing Service To Government Contract Works For The Above Construction & Maintenance Works. { Gst Amount Is The Total Gst Amount For Overall Quoted Amount ( Both Construction And Maintenance ) Above This Row In Column Bb For All Works In This Package } 77 4.Construction Ofgirls Toilet At Pues At At Devathur H / O Devathur Panchayat.Estimate Amount : Rs.6.18 Lakhs 78 Earthwork Excavation And Depositing On Bank With Initial Lead And Lift In Hard Gravelly Soil For Foundation Etc. Complete. 79 Cement Concrete 1:4:8 Mix Using 40Mm Iss Hbg Metal Including Cost And Conveyance Of All Matials To Site And All Labour Charges Etc., Complete 80 Random Rubble Masonry In Cement Mortar 1:5 Mix With Simultaneous Pointing Including Cost And Conveyance Pf All Materials To Site And All Labour Charges Etc Complete For 10 Cum 81 Filling In Foundation And Basement With Excavated Earth In Layers Of Not More Than 15Cm. Thick Well Rammed, Watered And Consolidated Complying With Standard Specifications Etc., Complete. 82 Supplying And Filling The Foundation And Basement With Filling Sand In Layers Not More Than 15Cm . Thick Well Rammed, Watered And Compacted Complete. 83 Brick Work In C.M 1:5 Mix Using Country Bricks Including Cost & Conveyance Of All Materials To Site And All Labour Charges Etc., Complete. 84 Supplying And Erecting Shuttering Including Necessary Support For Plane Surface In Foundation Basement And Roof Labs Strutting Upto 3.29M Height For Plane Surfaces For Floors For Rcc Column Footings Columns Plinth Beam And Connected With Foundations 85 Supplying, Fabricating And Placing In Position Mild Steel Or Ribbed To Steel And All Reinforced Cement Concrete Works As Per The Design Given Including Cost Of Steel And Binding Wire In All Floors Etc. Complete. 86 Rcc 1:1.5:3 Mix Using 20 Mm Iss Hbg Metal Including Cost & Conveyance Of All Materials To Site And All Labour Charges Etc., Complete. 87 Paving The Floor With Scratch Proof Ceramic Tiles Of Any Colour And Any Size Laid In Cm 1:2 20Mm Thick And Pointing With White Cement 0.4Kg / Sqm Mixed With Colouring Pigment To Suit The Colour Of The Tiles Including Finishing The Joint Neatly Complying Etc., Complete 88 Plastering With Cm 1:3 Mix 10Mm Thick Including Cost And Conveyance Of All Materials To Site And Labour Charges Etc. Complete. 89 Plastering With Cm 1:5 Mix 12Mm Thick Including Cost And Conveyance Of All Materials To Site And Labour Charges Etc. Complete. 90 Providing Granolithic Pattern Floor Finish With C.C 1:2:4 Mix Using 10 To 12Mm Iss Metal Including Cost & Conveyance Of All Materials To Site And All Labour Charges Etc., Complete. 91 Supplying & Fixing In Positionof Indian Type Water Closets Including Cost And Conveyace Of All Materials To Site Etc. Complete. 92 Iwsc 93 Ewsc 94 Steel Door D ( 1.10X2.10M ) 95 Steel Door D1 ( 0.75X1.80M ) 96 Rcc Jolly ( 0.60X0.45M ) 97 Oil Bound Distembering Two Coats Using Oil Bound Distember Inclluding Cost & Conveyance Of All Materials To Site And All Labour Charges Etc., Complete. 98 Painting Two Coats With Best Quality Of Ready Mixed Plastic Emulison Of Ist Class Paintwith Appd. Colour Approved By The Departmental Officersincluding Cost & Conveyance Of All Materials To Site And All Labour Charges Etc., Complete. 99 Painting Two Coats Over New Iron Work Using Synthetic Enamel Paint Including Cost And Conveyace Of All Materials To Site Etc. Complete. 100 Roofing With Cooland Colour Sheet 3 Mm Thk With J Bolts And Bitumen Washer Etc., 101 Towards Cost For Manhole Cover 60 X 60Cm ( Heavy Duty ) With Frame 102 Electrification Arrangements 103 Wiring With 2 X 1.5 Sq.M ( 22 / 0.3 ) Pvc Insulated Unsheathed Sc Cu. Conductor Of 1100V Grade In Suitable Pvc Rigid Pipe On Wall And Ceiling With Pvc Accessories With Tw Switch Box In Flush With Wall Covered With Hylum Sheet Of 3Mm Thick With Painting Of Suitable Colour For Open Pvc Light Point / Fan Point ( For Electronic Regulator ) - S.D.No: 17 104 Supply And Fixing Of Cfl Bulb 14W Including Cost And Conveyance Of All Materials And Labour Charges Etc Complete. Sd 80 105 Water Supply Arrangements 106 25Mmpvc Pipe 107 25Mmpvc Tap Cork 108 40Mmpvc 4 Kg / Sqcm Pipe 109 40Mm Pvc Coupler 110 40Mm Pvc Elbow 111 Solvent Cement 112 Supply And Delivery Of 1000 Lit Capacity Hdpe Tank 113 Provision For Name Board Charges 114 Gst Amount For Providing Service To Government Contract Works For The Above Construction & Maintenance Works. { Gst Amount Is The Total Gst Amount For Overall Quoted Amount ( Both Construction And Maintenance ) Above This Row In Column Bb For All Works In This Package } 115 5. Construction Of Threshing Floor At Perumalnaickenvalasu H / O Devathur Panchayat.Estimate Amount Rs.9.10 Lakhs 116 Earth Work Excavation For Foundation In All Soils And Sub-Soils And To Full Depth As May Be Directed Except In Rock Requiring Blasting Inclusive Of Shoring Shuttering, Bailing Out Water Wherever Necessary And Depositing The Surplus Earth Within The Compound In Places Shown By Thedepartmental Officers With An Initial Lead Of 10 Mts And Initial Lift Of 2 Mts. And Clearing And Levelling The Site, Etc., Complete Complying With Standard Specification. 117 Cement Concrete 1:4:8 ( One Cement, Four Sand And Eight Hard Broken Stone Jelly ) Using 40 Mm Gauge Hard Broken Granite Stone Jelly For Foundationincluding Dewatering Wherever Necessary And Laid In Layers Of Not More Than 15 Cm Thick Well Rammed, Consolidated And Curing Etc. Complete Complying With Standard Specification 118 Supplying And Erecting Centering For Sides & Soffits Including Supports And Strutting Up To 3.29M Height For Plane Surfaces In All Floors With All Cross Bracing Using Mild Steel Sheets Of Size 90Cm X 60Cm And 10 Gauge Stiffened Welded With Mild Steel Angles Of Size 25Mm X 25Mm X 3Mm For Boarding Laid Over Country Wood Poists Of Size 10Cm X 6.5Cm Dia Spaced At About 90Cm Center To Center Etc., Complete 119 Cement Concrete 1:3:6 ( One Cement, Three Sand And Six Hard Broken Stone Jelly ) Using 40 Mm Gauge Hard Broken Granite Stone Jelly For Basementincluding Dewatering Wherever Necessary And Laid In Layers Of Not More Than 15 Cm Thick Well Rammed, Consolidated And Curing Etc. Complete Complying With Standard Specification 120 Brick Work In Cement Mortar1:5 ( One Cement And Five Sand ) Using Best Quality Of Country Bricks Of Size 8-3 / 4 X 4-1 / 4 X 2-1 / 4For Foundation And Basement Including Curing, Etc., Complete Complying With Standard Specifiction. 121 Reilling The Excavated Earth Other Than Sand Including Cost, Conveyance And Filling Charges Etc., As Per Standard Specifications 122 Supplying And Filling In Foundation, Basement, Etc With Filling Sand In Layers Of Not More Than 15 Cm Thick Well Watered, Rammed And Consolidated Etc. Complete Complying With Standard Specification And As Directed By The Departmental Officers. 123 Cement Concrete 1:2:4 ( One Cement, Two Sand And Four Hard Broken Stone Jelly ) Using 20 Mm Gauge Hard Broken Granite Stone Jelly For Basementincluding Dewatering Wherever Necessary And Laid In Layers Of Not More Than 15 Cm Thick Well Rammed, Consolidated And Curing Etc. Complete Complying With Standard Specification 124 Plastering With Cement Mortar 1:5 ( One Cement And Five Sand ) , 12Mm Thick In All Floors Including Curing Etc. Complete Complying With Standard Specification And As Directed By The Departmental Officers. 125 Providing Granolithic Floor Finish Of The Following Thickness With Plain Cement Concrete 1:2:4 ( One Cement, Two Sand And Four Aggregate ) Using 10 To 12Mm Gauge Hard Broken Stone Jelly Including Laying, Finishing And The Top Rubbed Smooth With Power Trawl, Thread Lining, Curing Etc. Complete Complying With Standard Specification And As Directed By The Departmental Officers. 126 Painting Two Coats Of Newly Plastered Wall Surface With Ready Mixed Plastic Emulsion Paint Of First Class Quality And Approved Colour Over A Priming Coat Including Through Scrapping, Clean Removal Of Dirt And Including Necessary Plaster Of Pairs Putty, Wherever Required Etc Complete Complying With Standard Specification 127 Resting Shed Roof 128 Rafter - 25 Mm X 25 Mm M.S. Square Tubular Hollow Pipe Of 2.60 Mm Thick 129 Supply And Fixing Of Bitumen Pad Including Cost And Conveyance And All Labour Charges Etc.Complete 130 Provision For Name Board 131 Gst Amount For Providing Service To Government Contract Works For The Above Construction Works. { Gst Amount Is The Total Gst Amount For Total Overall Quoted Amount Above This Row In Column Bb For All Works In This Package }