}

Construction Of Room Of Govt School In Gp Bibasar, jhunjhunu-Rajasthan

Local Bodies has published Construction Of Room Of Govt School In Gp Bibasar. Submission Date for this Tender is 29-05-2023. Building Work Tenders in jhunjhunu Rajasthan. Bidders can get complete Tender details and download the document.




Tender Notice

37787272
Construction Of Room Of Govt School In Gp Bibasar
Open Tender
Indian
Rajasthan
Jhunjhunu
29-05-2023

Tender Details

Construction Of Room Of Govt School In Gp Bibasar , Earth Work In Excavation And Disposal Of Surplus Excavated Soil As Directed With In A Lead Of 50 Meter , Pcc In Foundation :Providing And Laying In Position Cement Concrete Including Curing Compaction Etc. Complete In Spcified Grade Excluding The Cost Of Centering And Shuttering All Work Upto Plinth Level 1:4:8 ( 1 Cement:4 Coarse Sand :8 Graded Stone Aggregate 40 Mm Nominal Size ) . , Random Rubble Stone Masonry For With Hard Stone In Foundation And Plinth In Cement Sand Mortar Above 30 Cm Thick Wall In Cement Mortat 1:6 ( 1-Cement: 6- Sand ) , Plinth Beam:-Providing And Laying In Position Specified Grade Ofcement Concrete Forall Rcc Structural Elements Upto Plinth Level Including Curing, Compaction, Finishing With Rendering In Cement Sand Mortar 1:3 ( 1 Cement: 3 Coarse Sand ) And Making Good The Joints And Cost Of Plastizers ( If Required ) Excluding The Cost Of Centering, Shuttering And Reinforcement. M20 Grade Nominal Mix / Design Mix , Supply & Stacking Good Earth At Site Complete Including Loading , Unloading And Transportation Etc &Filling Available Excavated Earth ( Excluding Rock ) In Trenches Plinth Side Of Foundation Etc. In Layers Not Exceeding 20 Cm. In Depth, Consolidating Each Deposited Layer By Ramming And Watering Including Lead Upto 50 Mtr. And Lift Upto 1.5 Mtr. Lead 1 Km , Brick Masonary In1:6 ( 1-Cement:6-Coarse Sand ) In Superstructure , Stone Kharanja: Random Rubble Dry Stone Kharanja Under Floor , Pcc:Providing And Laying In Position Cement Concrete Including Curing Compaction Etc. Complete In Spcified Grade Excluding The Cost Of Centering And Shuttering All Work Upto Plinth Level1:4:8 ( 1 Cement:4 Coarse Sand :8 Graded Stone Aggregate 20 Mm Nominal Size ) .M 10 Grade Nominal Mix , Lintel Beam : Providing And Laying In Position Specified Grade Ofcement Concrete For Rcc Structural Elements Upto Floor Five Level Including Curing, Compaction, Finishing With Rendering In Cement Sand Mortar 1:3 ( 1 Cement: 3 Coarse Sand ) And Making Good The Joints And Cost Of Plastizers ( If Required ) Excluding The Cost Of Centering, Shuttering And Reinforcementfor Beams, Suspended Floors, Roofs, Griders Having Slopes Up To 15º, Landings, Balconies, Shelves, Chajjas, Lintels, Bands, Plain Windows Sills, Staircases And Spiral Staircases Etc.M20 Grade Nominal Mix / Design Mix , Slab & Beams:- Providing And Laying In Position Specified Grade Ofcement Concrete For Rcc Structural Elements Upto Floor Five Level Including Curing, Compaction, Finishing With Rendering In Cement Sand Mortar 1:3 ( 1 Cement: 3 Coarse Sand ) And Making Good The Joints And Cost Of Plastizers ( If Required ) Excluding The Cost Of Centering, Shuttering And Reinforcementfor Beams, Suspended Floors, Roofs, Griders Having Slopes Up To 15º, Landings, Balconies, Shelves, Chajjas, Lintels, Bands, Plain Windows Sills, Staircases And Spiral Staircases Etc.M20 Grade Nominal Mix / Design Mix , Providing And Laying In Position Specified Grade Of Cement Concrete For Rcc Structural Elements Upto Plinth Level Including Curing, Compaction, Finishing With Rendering In Cement Sand Mortar 1:3 ( 1 Cement:3 Coarse Sand ) And Making Good The Joints And Cost Of Plastisers ( If Required ) Excluding The Cost Of Centtering Shuttering And Reinforcement, M 20 Grade Nominal Mix / Design Mix. , Columns :- Providing And Laying In Position Specified Grade Ofcement Concrete For Rcc Structural Elements Upto Floor Five Level Including Curing, Compaction, Finishing With Rendering In Cement Sand Mortar 1:3 ( 1 Cement: 3 Coarse Sand ) And Making Good The Joints And Cost Of Plastizers ( If Required ) Excluding The Cost Of Centering, Shuttering And Reinforcementfor Beams, Suspended Floors, Roofs, Griders Having Slopes Up To 15º, Landings, Balconies, Shelves, Chajjas, Lintels, Bands, Plain Windows Sills, Staircases And Spiral Staircases Etc.M20 Grade Nominal Mix / Design Mix , Centering & Shuttering With Plywood Or Steel Sheets Including Strutting, Propping Bracing Both Ways With Steel Propsand Removal Of Formwork For Upto Floor Five Level For :Suspended Floors, Roofs, Landings, Staircases, Balconies, Girders, Cantilevers, Bands, Coping Bed Plates, Anchorblocks, Sills, Chhajjas, Lintel, Beam, Plinth Beam Etc. , Column Footing;-Centering & Shuttering With Plywood Or Steel Sheets Including Strutting, Propping Bracing Both Ways With Steel Propsand Removal Of Formwork For Foundation, Footings, Strap Beam, Raft, Base Of Column Etc , Column :-Centering & Shuttering With Plywood Or Steel Sheets Including Strutting, Propping Bracing Both Ways With Steel Propsand Removal Of Formwork For Upto Floor Five Level For Columns, Pillers, Posts, And Struts Etc , Steel:-P / F Reinforcement For Rcc Work Including Straightening, Cutting, Bending, Placing In Position And Binding ( Including Cost Of Binding Wire ) All Complete Upto Floor Five Leve Tmt Bars ( Conforming Of Relevent Is Code ) . , ?????? ???? ( ???? ???? ) ?? 40X40x3 ???? ?? ????? ???? ??? 22 ??? ?? ???? ??.??. ????? ?? 2 ?????? ???? ?????? 25X25x3 ???? ?? ?????? ???? ?? ???? ( ????? ) ??? ??????? ???? ??? ????? ?? ????? ?????????? ??????, ?????? ??? ???? ???????? ??? ?????? ???? , ?????? ???? ( ???? ???? ) ?? 25X25x3 ???? ?? ???? ( ????? ) ??? 22 ??? ?? ???? ????? ?? 2 ?????? ???? ?????? ?? ??????? ???? ??? ????? ?? 10 ???? ?????, 3 ????. ????? ? ????? ?????????? ??????, ?????? ??? ???? ???????? ??? ?????? ???? , Wire Gauge Supplying & Fixing Fixed Wire Gauge To The Metal Frame Of Rolled Section By Metal Beading 20X3mm With Suitable Screw At Not Exceeding 150Mm Distance. 14 Mesh X 24 Gauge , Kota Stone Slab Flooring 25 Mm Thick Over 20Mm ( Average ) Thick Base Laid Over And Jointed With Grey Cement Slurry Mixed With Pigment To Match The Shade Of The Slab Including Rubbing And Polishing Complete With Base Of Cement Mortar 1 : 4 ( 1 Cement: 4 Course Sand ) For Area 2001 To 5000 Sq. Cm , Kota Stone Slabs 20 Mm Thick In Risers And Stepsskirting, Dado And Pillars Laid On 12 Mm ( Average ) Thick Cement Mortar 1:3 ( 1 Cement: 3 Course Sand ) And Jointed With Grey Cement Slurry Mixed With Pigment To Match The Shade Of The Slabs , Including Rubbing And Polishing Completefor Areaof Each Slab Upto900 Sq.Cm , External Plaster : Plaster On New Surface On Walls In Cement Sand Mortar 1:6 Including Racking Of Joint Etc. Complete Fine Finished 20 Mm Thick , External Plaster : Plaster On New Surface On Walls In Cement Sand Mortar 1:6 Including Racking Of Joint Etc. Complete Fine Finished 20 Mm Thick , Plaster ( Ceiling ) : 6 Mm Thick Cement Plaster To Ceiling Of Mix 1:3 ( 1 Cement: 3 Fine Sand ) , Internal Finishing: Distempering With Oil Bound Washeble Distemper Of Approved Brand And Manufacture To Give An Even Shade Including All Scaffolding New Work ( Two Or More Coats ) Over And Including Scrapping And Priming Coat With Cement Primer , Exterior Finishing :- Wall Painting With Plastic Emulsion Paint Of Approved Brand And Manufacture To Give An Even Shade: Two Or More Coats On New Work Including Preparation Of Base With Primer, Putty, Lippy Complete In All Respect. , Panting On Doors & Windows:- Painting Enamel Paint Of Approved Brand And Manufacture In All Shade To Give An Even Shade , P&F Rigid Pvc Pipe 110 Mm Dia , Light Fitting , Add Contigency

Key Value

Document Fees
INR 500 /-
EMD
INR 20000.0 /-
Tender Value
INR 9.85 Lakhs /-
Disclaimer :
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.
Tell us about your Product / Services,
We will Find Tenders for you

Copyright © 2024 · All Rights Reserved. Terms of Usage | Privacy Policy

For Tender Information Services Visit : TenderDetail