| 1 | Earth work excavation in all kind of soil within initial lead of 50 m and initial lift of 1.5 m including rough dressing and leveling the bed...etc complete in all respect and as per the direction of Engineer-in-charge. |
| 2 | Supplying, & filling in foundation and plinth with good quality river sand including watering, ramming with cost, conveyance, royalties, taxes of all materials and cost of all labour with T&P, sundries required for the work etc., complete (Measurement will be taken on finished compacted section) as per specification and direction of Engineer-in-charge. |
| 3 | C.C (1:4:8) with 4cm size HG Crusher BROKEN metal including all cost, conveyance,royalty & taxes etc.comp.to work site as per specification approved by the department & direction of E.I.C. |
| 4 | Brick work with Fly Ash bricks of size 25cmx12cmx8cm and crushing strength not less than 75 kg/cm2 in C.M.(1:6) in foundation and plinth including all charges |
| 5 | Providing, lifting, hoisting and laying Reinforced Cement Concrete of M-25grade inColumn base, Column Footings, Raft Foundation,StemoftheColumns, beams, chaujja, fin, lintel, stair case, jali , shelvesandslab etc including centring & shuttering as per approved designs and drawings having a minimum compressive strength ( in work test)20N. / Square mm. in 15 cm. cubes at28 days after mixing and test conducted in accordance with I.S. 456 and I.S. 516 using screened & washed sharp river sand for mortar and 10 mm. to 20 mm. size black hard crusher broken granite stone chips of approved quality from approved quarry, washed and cleanedto be mixed in concrete mixturewith approved quality of cementincluding hoisting, etcGround Floor |
| 6 | Column Footing |
| 7 | Column |
| 8 | 1st Floor |
| 9 | Plinth Bend |
| 10 | Lintel |
| 11 | Roof Beam Ground Floor |
| 12 | 1st Floor |
| 13 | Roof Slab |
| 14 | Stair Case |
| 15 | Chajja |
| 16 | Cutting,Straightening coiled or bent up M.S plain HYSD/TMT reinforcement bars welding or jointing if necessary bending,binding,tying the grills as required for R.C.C works,providing fan hooks where necessary and hoisting, lowering and placing in proper position according to approved designs and drawings including cost, conveyance,loading, unloading & taxes of M.S plain/HYSD/TMT reinforcement bars and binding wires of 18 to 20 gaugo required for the work and cost of all labour, sundries, T&P and scaffolding complete in all respect as directed by the Engineer in charge (payment will be made according to the actual weight of M.S plain/HYSD/TMT reinforcement bars consumed in the work only. |
| 17 | Ground Floor |
| 18 | 1st Floor |
| 19 | Brick work with Fly Ash bricks 25cmx12cmx8cm size having crusing strength not less then 75Kg/cm2 in cement mortar (1:6) in superstructure per cum. |
| 20 | Ground Floor |
| 21 | 1st Floor |
| 22 | 2nd Floor |
| 23 | Brick work with Fly Ash bricks of size 25cmx12cmx8cm and crushing strength not less than 75 kg/cm2 in C.M.(1:4) in superstructure |
| 24 | 6mm thick cement plaster (1:4) to RCC surface including closed deep chiping and all cost conveyance royalty & taxes etc. comp. to work site per 1sqm. |
| 25 | 12mm thick cement plaster (1:6) on brick work including all cost conveyance royalty & taxes etc. comp. to work site per 1sqm |
| 26 | Ground Floor |
| 27 | 1st Floor |
| 28 | 2nd Floor |
| 29 | 16mm thick cement plaster (1:6) on brick work including all cost conveyance royalty & taxes etc. comp. to work site per 1sqm |
| 30 | Ground Floor |
| 31 | 1st Floor |
| 32 | 2nd Floor |
| 33 | Finishing wall surface of walls with Acrylic wall putty (Water based ) of approved makeand finished smooth and even surface to receive painting including cost of scaffoldingstaging charges with cost of all materials taxes, labour T&P etc complete. |
| 34 | Ground Floor |
| 35 | 1st Floor |
| 36 | 2nd Floor |
| 37 | Wall painting 2 coats with weather coat over a coat of primer to inside and out side smooth surface with all cost of labour, T&P material etc complete. |
| 38 | Ground Floor |
| 39 | 1st Floor |
| 40 | 2nd Floor |
| 41 | Wall painting 2 coats with Plastic emulsion paint of approved shade over a coat of primer on new work to give an even shadewith all cost of labour, T&P material etc complete. |
| 42 | 6mm Plaster |
| 43 | 16mm Plaster CP |
| 44 | 16mm Plaster in (1:6) |
| 45 | M.S. Grill gate made out of M.S. flat conforming to IS 2062/20006 painted with red oxide primer as pe the design approved. |
| 46 | Providing and fixing factory made uPVC white colour fixed glazed windows/ventilators comprising of uPVC multi-chambered frame and mullion (where ever required) extruded profiles duly reinforced with 1.60 ± 0.2 mm thick galvanized mild steel section made from roll forming process of required length (shape & size according to uPVC profile), uPVC extruded glazing beads of appropriate dimension, EPDM gasket, G.I fasteners 100 x 8 mm size for fixing frame to finished wall, plastic packers, plastic caps and necessary stainless steel screws etc. Profile of frame shall be mitred cut and fusion welded at all corners, mullion (if required) shall be also fusion welded including drilling of holes for fixing hardware\"s and drainage of water etc. After fixing frame the gap between frame and adjacent finished wall shall be filled with weather proof silicon sealant over backer rod of required size and of approved quality, all complete as per approved drawing & direction of Engineer-in-Charge. (Single / double glass panes and silicon sealant shall be paid separately).Fixed window / ventilator made of (small series) frame 47 x 50 mm & mullion 47 x 68 mm both having wall thickness of 1.9 ± 0.2 mm and single glazing bead of appropriate dimension. (Area upto 0.75 sqm.) |
| 47 | Dressed and Seasoned Sal wood work for door frames |
| 48 | Ceramic tileSupplying, fitting and fixing of 32mm thick factory made (bothside1 mm thick lamination) ) flush door shutters with as perIS- 2202/92 with solid core block board from seasoned and treated 2nd class hard wood , Battern, bonded with phenol formaldehide synthetic resign pressed over suitable adhesive including providing stainless steel hinges, locking arrangement and other fittings & fixtures required etc. complete as per direction of Engg.- in- charge. |
| 49 | Ground Floor |
| 50 | Providing and fixing to existing door frames 24 mm thick factory made PVC door shutters made of styles and rails of a uPVC hollow section of size 59x24 mm and wall thickness 2 mm (± 0.2 mm) with inbuilt edging on both sides. The styles and rails mitred and joint at the corners by means of M.S. galvanised/ plastic brackets of size 75x220 mm having wall thickness 1.0 mm and stainless steel screws. The styles of the shutter reinforced by inserting galvanised M.S. tube of size 20x20 mm and 1 mm (± 0.1 mm) wall thickness. The lock rail made up of \"H\" section, a uPVC hollow section of size 100x24 mm and 2 mm (± 0.2 mm) wall thickness, fixed to the shutter styles by means of plastic/galvanised M.S. \"U\" cleats. The shutter frame filled with a uPVC multi-chambered single panel of size not less than 620 mm, having over all thickness of 20 mm and 1 mm (± 0.1 mm) wall thickness. The panels filled vertically and tie bar at two places by inserting horizontally 6 mm galvanised M.S. rod and fastened with nuts and washers, complete as per manufacturer\"s specification and direction of Engineer-in-charge. (For W.C. and bathroom door shutter). |
| 51 | 2 Coat of enamel paint over a coat of redoxide primer on gril and gates complete as per the direction of Engineer in charge. |
| 52 | Fixing tiles in floors treads or steps and landing on 25mm thick bed of cement mortar 1:1 (1cement : 1sand) jointed with neat cement slury mixed with pigment to match the shades of the tiles including rubbing and polishing complete excluding cost |
| 53 | VITRIFIED TILE Ground Floor |
| 54 | CERAMIC Floor TILE |
| 55 | Granite 0.40 sqm. (20mm thick) |
| 56 | Fixing tiles in dados skirting and risers of steps on 12mm thick cement plaster (1:3) jointed with neat cement slurry mixedwith pigments to match the shade of the tiles including rubbing and polishing complete excluding cost of tiles |
| 57 | VITRIFIED TILE Ground Floor |
| 58 | CERAMIC Floor TILE |
| 59 | Granite 0.40 sqm. (20mm thick) |
| 60 | Providing 2.5 cm thick grading concrete (1:2:2) on roof slab with 6mm size hard granite chips. On new work complete as per the direction of engineer in charge. |
| 61 | Supplying, fitting and fixing of Stainless steel of 304 grade in hand railing using 50mm dia of 2mm thick circular pipe with Balustrade of size 32mm x 32mm x 2mm @ 0.90mtr. C/C and stainless square pipe bracing of size 32mm x 32mm x 2mm in 3 rows in stair case as per approved design and specification, buffing, polishing etc with cost, conveyance, taxes of all materials, labour, T&P etc. required for the complete in all respect |
| 62 | Supplying, Manufacturing, fabricating & assembling of frame structure at stage area with circular/square hollow steel tube section of TATA STRUCTURE shall conform to CHS-IS-1161 & SHS/RHS of IS 4923 grade for shed component viz. column, truss, purlin etc as per approved drawing including two coat of primer & two coat of enamel painting. |
| 63 | Providing and fixing precoated galvanised iron profile sheets (size, shape and pitch of corrugation as approved by Engineer-in-charge) 0.50 mm (+ 0.05 %) total coated thickness with zinc coating 120 grams per sqm as per IS: 277, in 240 mpa steel grade, 5-7 microns epoxy primer on both side of the sheet and polyester top coat 15-18 microns. Sheet should have protective guard film of 25 microns minimum to avoid scratches during transportation and should be supplied in single length upto 12 metre or as desired by Engineerin- charge. The sheet shall be fixed using self drilling /self tapping screws of size (5.5x 55 mm) with EPDM seal, complete upto any pitch in horizontal/ vertical or curved surfaces, excluding the cost of purlins, rafters and trusses and including cutting to size and shape wherever required. |
| 64 | PH INTERNAL ESTIMATE PVC ASTM Pipes and fittings (Riser & Down)Non-Concealed |
| 65 | 40 mm dia CPVC pipe (Riser pipe) |
| 66 | 25 mm dia CPVC pipe ( Down Pipe) |
| 67 | PVC ASTM Pipes and fittings (Riser & Down)Concealed |
| 68 | 20 mm dia CPVC Pipe |
| 69 | Supplying, Fittings & Fixing with all labour, T&P as per specification, the following Brass / CP(Jaquar) /G.M. fittings at appropriate locations along the pipe lines at all floors and at all heights of approved make confirming to relevent IS specification. etc.complete in all respect as per direction of the Engineer in charge. |
| 70 | (a)15 mm dia C.P. 2 way Bib Cock (Short body) or Health Processor (3.2.14) |
| 71 | (a) 15 mm dia CP Bib cock ( Long Body) |
| 72 | (a) 15 mm dia CP Angle stop cock |
| 73 | (a)15 mm dia Conc. Stop cock. |
| 74 | (a)15 mm dia C.P. Pillar cock |
| 75 | (a) 15 mm dia C.P.Shower with arm |
| 76 | 600 mm long CP Towel rail |
| 77 | (a)CP Soap holder |
| 78 | 15 mm dia C.P. Towel Ring |
| 79 | 600 mm long C.P. Glass shelf with C.P frame |
| 80 | (a)110 mm dia C.P. waste |
| 81 | 40mm dia GM FW valve |
| 82 | Supplying, Fittings & Fixing with all labour, T&P as per specification, the following flexible PVC connection pipes and waste pipe making connection with pillar cock, cistern. Wash handbasin at all height and all floors with all jointing materials etc. complete as per direction of the Engineer -in- charge. |
| 83 | (a) 450-600 mm long 15mm dia PVC connection pipe |
| 84 | (a)40 mm dia flexible PVC waste pipe 1 mtr each. |
| 85 | Supplying, Fittings & Fixing of 10 Ltr. Capacity low level P.V.C cistern white colour,to wall at all floors and at all height with all accessories etc. completein all respect as per direction of the Engineer -in- charge. |
| 86 | Supplying, Fittings & Fixing of following sizes of porcelain wash hand basin confirming to relevant IS specification of Nycer/ Cera/ Parryware maketo the brick / concrete wall etc. complete as per direction of the Engineer in charge. |
| 87 | (a) Standard ( 550x400mm) size basin |
| 88 | Porcelain Squatting Urinal(600x355mm) |
| 89 | Supplying , fitting and fixing the standard size ofEuropean pattern porcelain wash down water closet confirming to relevant IS specification of Nycer/ Cera / Parryware make having \"S\" or \"P\" trap etc with all required materials, labour T&P etc. complete as per direction of the Engineer in charge. |
| 90 | Supplying ,fitting and fixing with all labour and T & P 4mm thick bevelled edge sheet glass mirror (508mmx406) of relevant IS specification to the brick concrete wall with full sheet hard board and CP down shaped screw on wooden /PVC plug etc. complete as per direction of the Engineer in charge. |
| 91 | Supplying all labour T & P etc for cutting holes in brick masonry wall/ RCC work for passing of GI /pvc Pipes of 15 mm to 50 mm dia and making good to the damages with C.M. (1:4) as per direction of the Engineer in charge. |
| 92 | Supplying, fitting & fixing ofISI marked PVC,CLASS-B(SWR) pipeswith all materials, labour &T&P on concrete / Brick walls and grounds with nails, bobbins and wooden plugs as required including , scaffolding with proper plumbing fittings for exposed pipescomplete in all respect as per direction of the Engineer in charge. |
| 93 | 110mm dia PVC pipes 1st Floor |
| 94 | Supplying, fitting & fixing of following size of UPVC,CLASS-B(SWR) fittings of ISI marked to UPVCpipes (on concrete / Brick walls and grounds) with all materials labour T&Pincluding cutting of the walls, with supply of nails, bobbins and wooden plugs as required includingscaffolding etc. complete in all respect as per direction of the Engineer in charge. |
| 95 | 110 mm dia Single Junction with door |
| 96 | 110 mm dia plain Door Bend |
| 97 | 110 mm dia \"P\" Trap (3 X 12) |
| 98 | 110 mm dia Off set |
| 99 | 110 mm dia Cowl |
| 100 | 75 mm dia Single Junction with door |
| 101 | 75 mm dia elbow |
| 102 | Fixing rational moulded polyethylene cylindrical vertical water storage tanks conforming to IS:12701-1996 including cutting holes through the tank and fixing mild steel tubes and fittings and providing extra sockets and jam nuts , fixing ball valve etc., including hoisting upto a height of 5 meters above ground level and palcing the tank to the required position etc all complete asper specification and directionof the Engineer In charge. (4 X 1000 Ltr) |