| 1 | 1 | Earthwork in excavations of foundation trenches in all kinds of soil including morrum, stoney earth and earth mixed with boulders except sheet rocks and boulders requiring blasting, including dressing and levelling the bed up to required level and depositing the excavated earth away from the site within 50 m initial lead and 1.5m initial lift, T & P centring and shuttering if required etc complete as directed by Engineer in charge. | 1 | 284.85 | Cum |
|---|
| 2 | 2 | Supplying, filling in foundation and plinth with clean course river sand including watering ramming with cost, conveyance, taxes & royalties of all material and cost of all labour T & P required for the work etc., complete as directed by Engineer in charge (measurement will be taken for finished complete section only) | 2 | 894.01 | Cum |
|---|
| 3 | 3 | CC (1:4:8) in foundation and floors using 40mm size hard broken granite stone metal of approved quality from approved quarry including lowering laying of concrete, watering, curing etc, compacting to required level laid in layers not exceeding 0’-6” thick, with cost, conveyance, taxes & royalties of all material and cost of all labour T & P required for the work etc., complete as directed by Engineer in charge. | 3 | 118.71 | Cum |
|---|
| 4 | 4 | RCC work with M25 Grade concrete with 12mm and down graded crusher broken chips having a minimum crushing strength in work test (150 kg/ sqcm) in 15 cm cubes after 28 days curing after mixing and test conducted in accordance with IS-456 and IS-516 including hoisting, lowering, laying concrete, compacting by using vibrators, centring and shuttering and finishing the exposed surface smooth, providing proves and beads wherever necessary with cost, conveyance, taxes & royalties of all material and cost of all labour T & P required for the work etc., complete as directed by Engineer in charge. | 4 | | |
|---|
| 5 | 4.01 | In column base | 5 | 25.83 | Cum |
|---|
| 6 | 4.02 | In column | 6 | 54.88 | Cum |
|---|
| 7 | 4.03 | In plinth bend | 7 | 15.75 | Cum |
|---|
| 8 | 4.04 | In lintel | 8 | 11.62 | Cum |
|---|
| 9 | 4.05 | In tie beam | 9 | 12.51 | Cum |
|---|
| 10 | 4.06 | In Chhaja & fins | 10 | 1.34 | Cum |
|---|
| 11 | 4.07 | In concrete slab | 11 | 19.23 | Cum |
|---|
| 12 | 5 | Cutting, straightening, coiled or bend up MS rod or Tor steel, bending binding, cranking, hooking, welding or jointing if necessary and tying the grills and placing in position for RCC work in all floors and for proving fan hooks, hoisting lowering, laying for concrete with cost of reinforcement, conveyance, taxes & royalties of all material and cost of all labour T & P required for the work etc., complete as directed by Engineer in charge. (payment will be made on weigh of steel only basing on the coefficient of MS or Tor steel bar approved by competent authority and no separate payment will be made for cost of binding wires) | 12 | 196.36 | Qtls |
|---|
| 13 | 6 | KB Brick masonary upto ground level with (1:6) cm in foundation and plinth in ncluding scaffolding, watering, curing etc required for the work with cost, conveyance, taxes & royalties of all material and cost of all labour T & P required for the work etc., complete as directed by Engineer in charge. | 13 | 105.98 | Cum |
|---|
| 14 | 7 | KB Brick masonary in superstructure with (1.6) cm in superstructure in ncluding scaffolding, watering, curing etc required for the work with cost, conveyance, taxes & royalties of all material and cost of all labour T & P required for the work etc., complete as directed by Engineer in charge. | 14 | 148 | Cum |
|---|
| 15 | 8 | Supply of all materials for fabrication of ventilators with louvered leafs made out of GI sheet and fixing the same to required place as directed including executing all items of works for fixing the same and completing the work as per direction of engineer-in-charge . | 15 | 4.46 | Sqm |
|---|
| 16 | 9 | Supply of all materials for fabrication of Wiremesh with frames and fixing the same to required place as directed including executing all items of works for fixing the same and completing the work as per direction of engineer-in-charge. | 16 | 337.5 | Kg |
|---|
| 17 | 10 | Supply of all materials for fabrication of windows with grill made out of iron member and iron sheets of required specifications as directed and fixing the same to required place as directed including executing all items of works for fixing the same and completing the work as per direction of engineer-in-charge . | 17 | 320 | Kg |
|---|
| 18 | 11 | Supply of all materials for fabrication of MS windows with doube openble leafs made out of iron member and iron sheets of required specifications as directed and fixing the same to required place as directed including executing all items of works for fixing the same and completing the work as per direction of engineer-in-charge . | 18 | 320 | Kg |
|---|
| 19 | 12 | Supply of all materials for fabrication Aluminium fixed windows of required specifications as directed and fixing the same to required place as directed including executing all items of works for fixing the same and completing the work as per direction of engineer-in-charge . | 19 | 5.95 | Sqm |
|---|
| 20 | 13 | Supply of all materials for fabrication of Rolling Shutters made out of iron member and iron sheets of required specifications as directed and fixing the same to required place as directed including executing all items of works for fixing the same and completing the work as per direction of engineer-in-charge . | 20 | 44.61 | Sqm |
|---|
| 21 | 14 | Supplying and on site assembling and erecting tubular/ Angular directed trusses of approved design for main godown and cantilever trusses in platform side only. This includes erection of trusses, purlins, BTR and false rafters, sleeves and placing of wind bracing etc with nuts and bolts with cost, conveyance, taxes & royalties of all material and cost of all labour T & P required for the work etc., complete as directed by Engineer in charge. | 21 | 10 | Ton |
|---|
| 22 | 15 | Supply and fixing of Colour Coated Profile sheet 0.50 TCT in roof incuding fixisng of ridges and windties excluding cost wind-ties but including the cost of J hooks with cost, conveyance, taxes & royalties of all material and cost of all labour T&P required for the work etc.,complete as directed by Engineer in charge | 22 | 996.66 | Sqm |
|---|
| 23 | 16 | Providing and laying water proofs with polymeric bituminous membrane (Plastic felt) of 2.25kg/sqm and 2mm thickness consisting of layers having center core of 20 microns thermoplastic high molecular high density polyethylene HMHDPE film of grade 2504 including priming the surface with bituminous primer @ 0.3 kg/sqm providing a coat of hot blown bitumen of 1.32 kg/sqm, applying and laying plastic felt membrane with 10 cm overlap adhered to blown bitumen of 85/25 or 90/15 grade and covered with a layer of hot blown bitumen @ 1.2kg/sqm etc complete. | 23 | 150 | Sqm |
|---|
| 24 | 17 | 12mm thick cement plaster (1:4) in all floors finishing smooth to brick walls after racking out joints etc, including watering, with cost, conveyance, taxes & royalties of all material and cost of all labour T & P required for the work etc., complete as directed by Engineer in charge. | 24 | 1719.89 | Sqm |
|---|
| 25 | 18 | Painting wall with one coat of cement wash including watering with cost, conveyance, taxes & royalties of all material and cost of all labour T & P required for the work etc., complete as directed by Engineer in charge. | 25 | 904.12 | Sqm |
|---|
| 26 | 19 | Painting wall with two coats of cement paint with approved shade including watering with cost, conveyance, taxes & royalties of all material and cost of all labour T & P required for the work etc., complete as directed by Engineer in charge. | 26 | 904.12 | Sqm |
|---|
| 27 | 20 | Painting of wall with a thick coat of putty and a coat of primer with cost of all materials and T&P and cost of all other materials such as scafolding, ropes etc and completing the work as per direction of engineer in charge | 27 | 815.77 | Sqm |
|---|
| 28 | 21 | Wall painting 2 coats with Weathercoat paint of approved shade on new work to give an even shade including cost of paint and T&P and cost of all other materials such as scafolding, ropes etc and completing the work as per direction of engineer in charge | 28 | 815.77 | Sqm |
|---|
| 29 | 22 | Painting of two coats with approved quality eanamel paint over iron work including cost of scafolding etc and completing the work in all respect as per direction of engineer in charge | 29 | 245.26 | Sqm |
|---|
| 30 | 23 | CC (1:2:4) in flooring using 12mm size hard crusher broken granite chips including hoisting, lowering, laying concrete, providing and watering with cost, conveyance, taxes & royalties of all material and cost of all labour T & P required for the work etc., complete as directed by Engineer in charge. | 30 | 45.58 | Cum |
|---|
| 31 | 24 | CC (1:2:4) in flooring using 6mm size hard crusher broken granite chips including hoisting, lowering, laying concrete, providing and watering with cost, conveyance, taxes & royalties of all material and cost of all labour T & P required for the work etc., complete as directed by Engineer in charge. | 31 | 16.41 | Cum |
|---|
| 32 | 25 | Cutting, straightening, and laying of MS Wire Mesh made out of 2 mm wire with 25x25mm in floors and wall with cost of reinforcement, conveyance, taxes & royalties of all material and cost of all labour T & P required for the work etc., complete as directed by Engineer in charge. | 32 | 598.96 | Sqm |
|---|
| 33 | 26 | Laying of plastic sheet in floor to be used as vapour varier including all fixtures and completing the work in all respect | 33 | 598.96 | Sqm |
|---|
| 34 | 27 | Supply of all materials, fabrication and fixing Angle Fender with 50x50x6mm as angle fender, cuting of RCC work at diferent places and jamming with cement concrete and finishing the surface and completing the work in all respect | 34 | 10 | Qtls |
|---|
| 35 | 28 | Supply of all material and labour for the work Centring and shuttering for RCC Works and finishing the work in all respect as per direction of engineer-in-charge | 35 | | |
|---|
| 36 | 28.01 | Columns footing | 36 | 51.12 | Sqm |
|---|
| 37 | 28.02 | Columns (up to roof level) | 37 | 768.83 | Sqm |
|---|
| 38 | 28.03 | Plinth beam | 38 | 82.77 | Sqm |
|---|
| 39 | 28.04 | Lintel | 39 | 95.73 | Sqm |
|---|
| 40 | 28.05 | Tie beam | 40 | 113.89 | Sqm |
|---|
| 41 | 28.06 | Slab at plinth level | 41 | 81.3 | Sqm |
|---|
| 42 | 28.07 | Chaja | 42 | 18.96 | Sqm |
|---|
| 43 | 29 | Provision of Bathroom fittings | 43 | | |
|---|
| 44 | 29.01 | Comode with Cistern and all fitings | 44 | 1 | No |
|---|
| 45 | 29.02 | Hand wash basin including mainsupply cock, waste pipe etc. | 45 | 3 | Nos |
|---|
| 46 | 29.03 | Wash Basin tap | 46 | 1 | No |
|---|
| 47 | 29.04 | Angle cock | 47 | 3 | Nos |
|---|
| 48 | 29.05 | Bath room tap long body | 48 | 1 | No |
|---|
| 49 | 29.06 | Bath room tap short body | 49 | 1 | No |
|---|
| 50 | 29.07 | Shower | 50 | 1 | No |
|---|
| 51 | 29.08 | Wiring with 3/4'' pipe | 51 | 100 | Ft |
|---|
| 52 | 29.09 | Wiring with 1/2'' pipe | 52 | 60 | Ft |
|---|
| 53 | 29.1 | Wiring with 1'' pipe | 53 | 150 | Ft |
|---|
| 54 | 29.11 | Wiring with 1'1/2 pipe | 54 | 50 | Ft |
|---|
| 55 | 29.12 | Cost of water pipe line fittings including labour charges | 55 | 1 | Job |
|---|
| 56 | 29.13 | Laying of sewage line including traps including labour charges | 56 | 60 | Ft |
|---|
| 57 | 29.14 | Construction of I/C 2'x2'x2' | 57 | 5 | Nos |
|---|
| 58 | 29.15 | Construction of Soakpit | 58 | 1 | No |
|---|
| 59 | 29.16 | Installation of overhead water storage tank of 2000 lts capacity of Sintex make | 59 | 1 | no |
|---|
| 60 | 29.17 | Fixing tiles in dados skirting, floor and risers of steps on 12mm thick cement slurry mixed with pigments to match the shade of the tiles including rubbing and polishing complete excluding cost of precast tiles. | 60 | 18.87 | Sqm |
|---|
| 61 | 30 | Supply and fixing of windties after drilling of holes as required and as directed by engineer in charge including all labour, material for hoisting and tying and completing the work in all respect | 61 | 5 | Qtls |
|---|
| 62 | 31 | Drilling of Tube Well | 62 | | |
|---|
| 63 | 31.01 | Charges for conducting VES Test by GWS& I agency for ascertaining location of bore well with probability of odudant potable water including site clearance etc complete. | 63 | 1 | No |
|---|
| 64 | 32 | Labour for drilling a perfectly vertical bore hole of specified depth below ground loevel through condition and in solidation rock with condition drilling as required to soil the side condition as per direction of engineer in charge including supply of rig with asscesries T&P and consumable etc for lowering of 200mm/150mm dia G.I/P.V.C/M.S pipes for bvasing fitted with socket and with or without well screen as per the necessity for soft medium hard and boulder formation G.I/P.V.C/M.S casing pipe if required to prevent collapseof over borden is to be provided by the contractor including lowering and with drawing after complited of the tube well in over borden portion includig packing of gravel supplied by the contractor for 400 dia bore only. | 64 | | |
|---|
| 65 | 32.01 | 150 MM DIA BOREWELL 0 mtr to 20mtr | 65 | 20 | Mtr |
|---|
| 66 | 32.02 | 100 MM DIA BORE WELL 21 mtr to 80 Mtr | 66 | 60 | Mtr |
|---|
| 67 | 33 | Cost of PVC CS Pipe of reputed make with IS:12818/92 | 67 | | |
|---|
| 68 | 33.01 | 0 Mtr to 20 Mtr 150 mm dia pipe | 68 | 20 | Mtr |
|---|
| 69 | 33.02 | 21 Mtr to 80 Mtrs 100 mm dia pipe | 69 | 60 | Mtr |
|---|
| 70 | 34 | Lowering the PVC housing pipe with or without slotted pipes as per the necessity from ground level to req uired depth and fixed up in perfectly vertical position including cutting and threading of pipes and slotted pipe and supplyig and fixing all jointing material T&P etc complete and keeping the top of casing pipe threated including cost of casing pipe plugging tube well to prevent entry of forgin material. | 70 | 80 | Mtr |
|---|
| 71 | 35 | Cleaning and developing the tube well with their own compressors continously worked till clear and adqual discharge is obtained for the tube well incouding supply and used of all necessary equipment and labour as direction of engineer in charge. | 71 | 1 | Job |
|---|
| 72 | 36 | Ssupplying all material labour and T&P and providing sanitary sealing by cement concrete grouting of angular space arround F.I/P.V.C/M.S housing pipe upto 5mtr below ground level to plug the bore hole including ost of cement all material complete as per the direction of the engineer in-charge minimum one mtr casing pipe is to be inserted in the bore in to the rock at the bottom to ensure sanitary sealing. | 72 | 1 | Job |
|---|
| 73 | 37 | 3 HP, 3 Phse 380/440 volts of approved make and model subersible motor with pump uit, including control panel board | 73 | 1 | job |
|---|
| 74 | 38 | Sypply and installation of following materials and completing the work in all respect as per direction of engineer in charge | 74 | | |
|---|
| 75 | 38.01 | Finolex 2.5 mm sq submersible cable | 75 | 150 | Mtr |
|---|
| 76 | 38.02 | Earthing | 76 | 1 | No |
|---|
| 77 | 38.03 | Cable Jointing kit | 77 | 1 | No |
|---|
| 78 | 38.04 | Engineering rope | 78 | 160 | Mtr |
|---|
| 79 | 38.05 | Taper coupling with short piece | 79 | 2 | Nos |
|---|
| 80 | 38.06 | Pump holding camp | 80 | 2 | Nos |
|---|
| 81 | 38.07 | Bore cover | 81 | 1 | No |
|---|
| 82 | 39 | Required size HDPE pipe as per Clause No.4 IS 4985-1987 40 MM dia with connecting the same to submerible pump in one side and to other connection at top including all T7 P and materials and completing the work in all respect. | 82 | 50 | Mtr |
|---|
| 83 | 40 | Installation of Full way valve | 83 | 1 | No |
|---|
| 84 | 41 | Installation of overhead water storage tank of 2000 lts capacity of Sintex make | 84 | 1 | no |
|---|
| 85 | 42 | Electrical work | 85 | | |
|---|
| 86 | 43 | Supply of all materials and executing the work of light point wiring in surface or recessed with 1.5 sq mm copper wire with cost of conveyance, taxes & royalties of all material and cost of all labour T & P required for the work etc., complete as directed by Engineer in charge. | 86 | 30 | Point |
|---|
| 87 | 44 | Supply of all materials and executing the work of 5 Amp plug point on existing switch board piano type with cost of conveyance, taxes & royalties of all material and cost of all labour T & P required for the work etc., complete as directed by Engineer in charge. | 87 | 5 | Nos |
|---|
| 88 | 45 | Supply of all materials for executing the work of Recessed / Surface wiring for circuit / submain wiring along with earth wire with' the following size of PVC insulated single core multistrand copper wire ISI marked confirm to IS-694/1990 in 20 mm dia non-metalic heavy, duty flexible conduit (Make of wire Finolex /L&T / Anchor / Havels / V Guard) | 88 | | |
|---|
| 89 | 45.01 | 2x2.5 sqmm + 1x1.5 sqmm | 89 | 250 | Mtr |
|---|
| 90 | 45.02 | 2x4.0 sqmm + 1x1.5 sqmm | 90 | 100 | Mtr |
|---|
| 91 | 46 | Supply of all materials for executing the work of Recessed / Surface wiring for circuit / submain wiring along with earth wire with' the following size of PVC insulated single core multistrand copper wire ISI marked confirm to IS-694/1990 in 20 mm dia non-metalic heavy, duty flexible conduit (Make of wire Finolex /L&T / Anchor / Havels / V Guard) for 2 x 4.0 + 1 x 1.5 sqmm | 91 | 100 | Mtr |
|---|
| 92 | 47 | Supply of all materials and executing the work of installation of Piano type switch / socket ISI marked on existing switch board / cover including connection etc. as required and completing the work in all respect as per engineer-in-charge. | 92 | | |
|---|
| 93 | 47.01 | 5 Amp / 6 Amp switch | 93 | 30 | Nos |
|---|
| 94 | 47.02 | 15 Amp /16 Amp'switch | 94 | 2 | Nos |
|---|
| 95 | 47.03 | 3 Pin 5 Amp / 6 Amp socket | 95 | 5 | No |
|---|
| 96 | 48 | S/F of following size metal box of 16/18 SWG on surface & recessed with suitable size of Fenolic, laminated sheet cover in front of including cutting the work making the same in case of recesed conduit as required. | 96 | | |
|---|
| 97 | 48.01 | 100mm x 100mm x 60mm deep with cover | 97 | 10 | Nos |
|---|
| 98 | 48.02 | 180mm x 100mm x 60mm deep with cover | 98 | 6 | Nos |
|---|
| 99 | 48.03 | 200mm x 150mm x 60mm deep with cover | 99 | 6 | Nos |
|---|
| 100 | 49 | Supply of all materials and executing the work of installation of SP MCB of 5 Amp to 32 AMP including cutting the work making do the same in case of recessed conduit as required and completing the work in all respect as per engineer-in-charge. | 100 | 12 | Nos |
|---|
| 101 | 50 | Supply of all materials and executing the work of installation of MCB Box with copper bus bar, neutral bus bar, earth bar, detachable gland plate inter connections phosphaticed and power painted including earthing etc. (without MCB) 12 way single door and completing the work in all respect as per engineer-in-charge. | 101 | 1 | No |
|---|
| 102 | 51 | Supply and fixing of outdoor type light fitting with LED Bulbs. | 102 | 4 | Nos |
|---|
| 103 | 52 | Supply and fixing of LED lamps 18 watt of phillips/ Havells make | 103 | 30 | Nos |
|---|
| 104 | 53 | Supply and fixing of brass compression termination glands including cost of material, labour and cost of all T&P for 4 x 10 sqmm cable | 104 | 5 | Set |
|---|
| 105 | 54 | Supply of 4 x 10 sqmm PVC cable including cost of material, labour and cost of all T&P | 105 | 50 | Mtr |
|---|
| 106 | 55 | Supply of all mrequired materials and labour (excluding xcost of cable for laying in trench or in wall and cost of all T&P | 106 | 50 | Mtr |
|---|
| 107 | 56 | Supply of all materials and labour for installation of earthing as per IE specification and completing the work in all respect as per direction of engineer-in-charge | 107 | 5 | Nos |
|---|
| 108 | 57 | Supply and fixing of exaust fans sweep-600mm RPM-900 make Havells/ Crompton as approved including cost of fans, labour for fixxing and cost of all T&P | 108 | 10 | No |
|---|
| 109 | 58 | Making of holes in walls in desired place as per direction and finishing the surface with desired cement mortar of cement concerete and completing the work for onward fixation of exhaust fans | 109 | 10 | Nos |
|---|
| 110 | 59 | Supply and fixing of ceiling fans 48\" sweep make Havells/ Crompton as approved including cost of fans, labour for fixxing and cost of all T&P | 110 | 4 | Nos |
|---|
| 111 | 60 | Bus bar 100 AMP, 4 strip copper with eclosure with openings with cover for passing of cables including fixing ccharge to place and completing the work in all respect as per direction of engineer-in-charge. | 111 | 2 | Nos |
|---|
| 112 | 61 | Supply of all materials and labour for executing the work of GI earth connection and executing the work and comprting as per direction of engineer in charge | 112 | 40 | Kg |
|---|
| 113 | 62 | Supply of wall mounted Pannel Board with Mainswitch 100 AMP rotary- 1 nos, 4 strip bus bar with due mountings and all the above fitted in suitable enclusure with all labour charges etc and completing the work in all respect as per direction of engineer-in-charge | 113 | 1 | job |
|---|