Quantities For Interior & Furnishing Work In C.R.Park Branch --Providing, Fabricating And Erecting In Position Totally Flushed Suspended False Ceiling With 12.0Mm Thick Gypsum Board, Fixed To A Metal Frame Work Comprising Of Ceiling Channel Of Size 80Mmx26mmx0.5Mm @ Every 457Cm Centre, Inter Channel 45Mmx15mmx0.9Mm @ Every 1220 Cm Centre, Peri-Meter Channel 20Mmx26 Mm All Along The Wall/Partitions, Strap Hanger Suspenders 25Mmx0.5Mm With Nuts And Bolts 6.4Mmx12.7Mm, Connecting Clips 2.6Mm Thick, Dry Walls Screws 25M Long, Soffit Cleats 27Mmx37mmx25mmx1.6Mm Thick And Dash Fastenes / Rawl Plugs 12.5 Mm Diax35mm Long With 6Mm Dia Bolts Etc. Complete With Recommended Fillers, Paper Tapes And Applying Two Coats Of Acrylic Emulsion Paint Of Approved Shade And Make Over A Coat Of Primer Including Making Necessary Cut Outs For Light Fittings/ Acs Etc.Providing And Fixing Of Armstrong Mineral Fibre Acoustical Suspended Ceiling System With Dune (Tegular) Edge Tiles With Armstrong 24Mm Exposed Grid At All Heights And At All Levels In Module Size Of 600X600x16mm With Bio Block Coating On The Face Of The Tile. The Tile Shall Be Laid On Armstrong Prelude 38 Or Eqv With 24 Mm Wide T Section Flange Color White Having Rotary Stitching On All T Section. Main Runner 1200Mm & 600 Mm Cross Tee With A Web Height Of 38Mm And A Load Carrying Capacity Of 15.34 Kgs / M2. T Section Have A Galvanizing Of 90 Grams Per M2.Supplying And Erecting Wall Paneling / Column Encasing (Up To False Ceiling) As Per Drawing And Design And Conforming To The Following Specifications : Basic Frame Work: Well Seasoned Malaysian Sal/ Kail/ Mirandi Wood Sections, Treated With Two Coats Of Wood Preservatives. 38 Mm X 19Mm, At Maximum 600Mm Horizontal & Vertical Spacing As Per Site Conditions. Vertical Members Shall Be Suitably Anchored At Ceiling Level To Ensure Rigidity. Skin Membrane : 6 Mm Thick Bwr Grade Plywood On Face. Finishing : 1.0Mm Thick Laminate Sheet Of Same Or Combination Shades With Grooves As Per Instructions. Skirting- 100X12mm Steam Beach / Teak Wood Skirting Duly Polished/ Painted As Directed. Quoted Rates Shall Include All Necessary Materials, Accessories And Labour And Also For Making Provisions For Electrical/Telephone/Computer Wiring, Conduits And Switch Boxes, Etc. Where Ever Required.Supplying And Erecting Full Height Partly Glazed Partitions As Per Following Specifications: Basic Frame Work: Well Seasoned Malaysian Sal/ Kail/ Mirandi Wood Sections, Treated With Two Coats Of Wood Preservatives, 60Mm X 40Mm, At Maximum 600Mm Horizontal And Vertical Spacing As Per Site Conditions. Vertical Members Shall Be Suitably, Anchored At Floor & Ceiling Level To Ensure Rigidity. Exposed Frame Members In The Glazed Portions Shall Have Wider Spacing (Approx. 1200 Mm) And Be Finished With 1.00 Mm Thick Laminate Of Same Or Combination Shades, Over 6Mm Bwr Grade Ply. Skin Membrane: (Opaque Portion Up To 900Mm From Floor Level And From 2100Mm To Ceiling, Finished With 6Mm Thick Bwr Grade Plywood On Each Face With Grooves, As Per Drawings/ Instructions. Finishing: 1.0Mm Thick Laminate Of Same Or Combination Shades With Grooves As Per Instructions. Glazing: 6Mm Thick Clear Float Glass Fixed With Polished Teak / Steam Beech Wood Glazing Beads Of Approved Shape (Finished 12 X 25Mm). Skirting- 100X12mm Steam Beach / Teak Wood Skirting Duly Polished / Painted As Directed. Quoted Rates Shall Include All Necessary Materials, Accessories And Labour And Also To Make Provisions For Electrical / Telephone / Computer Wiring Conduits And Switch Boxes, Etc. (Materials For Wiring Conduits, Switches Etc. Shall Be Separately Paid For)Supply And Erecting Low Height Opaque Partitions (Up To Maximum 1200Mm Height) Conforming To The Following Specifications : Basic Frame Work: Well Seasoned Malaysian Sal/Kail/ Mirandi/Mirandi Wood Sections, Treated With Two Coats Of Wood Preservatives, 60 Mm X 40 Mm, Maximum 600 Mm Horizontal And Vertical As Per Site Conditions. Skin Membrane: 6 Mm Thick Bwr Grade Ply On Each Face. Finishing: 1.0-Mm Thick Laminate Of Same Or Combination Shades With Grooves As Per Instructions. Edge Moulds: All Free Top/ End Surfaces Shall Have Polished Teak / Steam Beech Wood Moulds Of Approved Shape (From 18 X 50Mm Sections). Skirting- 100X12mm Steam Beach / Teak Wood Skirting Duly Polished/ Painted As Directed. Quoted Rates Shall Include All Necessary Materials, Accessories And Labour And Also Allow Provisions For Electrical / Telephone/Computer Wiring, Conduits And Switch Boxes, Etc. (Materials For Wiring, Conduits And Switch Boxes Shall Be Separately Paid For.)Providing And Erecting In Position Cash Work Station (To Accommodate 2 Cashiers), Comprising Of Clerical Workstation Of Approx. Size 1200X750x750mm Made Of 19Mm Thick Block Board Pasted With 1.00Mm Laminate Inclusive Of A 1150 Mm High, 300Mm Wide Customer Top. Writing Top & Customer Top Should Be Finished With Mirror Polished; 18Mm Thick Granite Slab (Jet Black/Ruby Granite) With Rounded Edges And Sides With 1.0Mm Thick Laminate Of Approved Shade/Make. The Workstations Shall Be Supported From The Partition System Made Of 19Mm Thick Bwr Grade Block Board Finished With 1.00 Mm Thick Laminate Of Approved Shade/Make. Free Edges Shall Have 18 Mm Thick, Polished White Or Steam Beach Wood Moldings Of Half-Round Profile As Per Drawings And Instructions And 100X12mm Steam Beach / Teak Wood Skirting Duly Polished/ Painted As Directed. Each Cash Workstation Shall Comprise Of The Drawer Unit, Tea Tray At Top, Cash Drawers With Approved Telescopic Channels For Drawer-Slides, Automatic Locks (Keys In Duplicate), Wire Managers, Space For Computer Cpu, Modesty Panel And Other Necessary Hardware And Accessories Including Satin Finish S. S. Handles Of Approved Quality. Inner Face Of Cash Counter To Be Provided With 16G, G.I. Sheet. Inner Faces Of Drawers/ Cabinets To Be Painted/ Polished In Approved Shade. Providing & Fixing 12Mm Thick Clear Float Glass On Cash Counters With S S Clamps, Necessary Polished Beadings And Over Low Height Partition Of Manager Cabin/Clerical Counters Including Required Size Of Wooden Pillars Etc Complete All As Directed By The Bank.Supplying And Erecting Clerical Counters (Running Tables) 750Mm Deep And 750Mm High Including Drawer-Cum-Cabinet Unit For Files, Space For Computer Cpu, Wire Managers, Modesty Panel, Tea Tray Etc. Made With 19Mm Thick Bwr Grade Block Board On Top And Supporting Sides / Front With Necessary Well Seasoned Malaysian Sal/ Kail/ Mirandi Wood Frame Work, Finished On Top With Mirror Polished, 18Mm Thick Granite Slab (Jet Black/Ruby Granite) With Rounded Edges And Sides With 1.0 Mm Thick Laminate Of Approved Shade And Quality, Including Providing And Fixing 450Mm Long Key Board Tray Of Approved Shade, Hardware And Accessories At Each Of The Counter. All Exposed Edges Of Block Board Are To Be Provided With Half Round Teak Wood Mouldings, Duly Polished And 100X12mm Steam Beach / Teak Wood Skirting Duly Polished/ Painted As Directed. Inner Faces Are To Be Painted/ Polished In Approved Shade. Rate To Include Charges For Brass Hardware Fittings As Well As Fixtures Like Sliding Gear For Drawers Of ‘Earl Behari’ Or Equivalent Approved Make.Supplying And Erecting Counters (Running Tables) 600Mm Deep And 750Mm High Including One Drawer For Each Sitting, Space For Computer Cpu, Wire Managers, Modesty Panel, Made With 19Mm Thick Block Board On Top And Supporting Sides, Finished On Top With 1Mm Thick Laminate Including Providing And Fixing 450Mm Long Key Board Tray Of Approved Make, All Exposed Edges Of Block Board Are To Be Provided With Half Round Teak Wood Mouldings, Duly Polished Inner Faces Are To Be Painted/ Polished In Approved ShadeSupplying And Fixing In Position Overall 32 Mm Thick Solid Core Hot Pressed Phenol Formaldehyde Bonded Flush Door Finished With 1.0 Mm Thick Laminate Of Approved Shade And Quality On Both Sides Of The Door Shutter & Beading On Edges Including Cost Of Hardware Fittings E.G. Godrej Night Latch / Mortice Lock, Hinges, Door Closure, Handles Etc. Of Approved Make And Quality. Supplying And Fixing In Position 32 Mm Thick Solid Core Hot Pressed Phenol Formaldehyde Bonded Partly Glazed Flush Door Shutter Of Approved Make Finished Up To 900 Mm From Floor Level With 1.00 Mm Thick Laminate Of Approved Quality On Both Sides Of The Door Shutter & Beading On Edges. The Upper Portion Of The Shutter Is To Be Provided With 6 Mm Thick Clear Float Glass Fixed With White Or Steam Beech Wood Glazing Beads Of Approved Design, Complete As Per Drawing. Rate To Include Cost Of Hardware Fittings E.G. Mortise Lock, Hinges, Handles, Door Closer Etc. Of Approved Make And Quality. Providing And Erecting In Position Low/ Full Height Storage Cabinet Made Of 19 Mm Thick Bwr Grade Block Board Including Intermediate Shelves As Per Direction, Lockable Shutters Etc. Conforming To Following Specifications: Shutter Faces Shall Be Finished With 1Mm Thick Laminate Of Same Or Combination Shades As Per Instructions With Polished White Or Steam Beech Wood (6Mm Thick) Edge Lippings And 100X12mm Steam Beach / Teak Wood Skirting Duly Polished/ Painted As Directed. Inner Faces Of Cabinet Including Shutters Shall Be Painted In Approved Shade. Shutters Will Be Hung By Auto-Closing Hinges, Locks, Magnetic Door Catcher And Satin Finished S. S. Handles Etc. Of Approved Make. (Payment Will Be On The Area Of Cabinet Face) Maximum 400Mm Deep X 900 Mm High Maximum 400Mm Deep X 2100 Mm HighProviding And Erecting In Position Tables As Per Drawing And Conforming To The Following Specifications : Structure Of 19Mm Thick Bwr Block Board For Sides, Top And Modesty Panel, Finished With 1.00 Mm Thick Laminate Of Approved Shade And Make Including Drawer-Cum-Cabinet Unit Space For Computer Cpu, Modesty Panel, Tea Tray ,Wire Managers, 450Mm Long Key Board Trey, Hardware And Accessories Etc Complete. All Exposed Edges Of Block Board Are To Be Provided With Half Round Teak Wood Moldings, Duly Polished. Inner Faces Are To Be Polished/Painted In Approved Shade. Rate To Include Charges For Brass Hardware Fittings As Well As Fixtures Like Sliding Gear For Drawers Of ‘Earl Behari’ Or Equivalent Approved Make. A)Approx Size 1500 X 900 X 750 Mm (5’X 3’X 2.5’ ) B)Approx Size 1200 X 750 X 750 Mm (4’X 2.5’X 2.5’ )Providing And Erecting In Position Side Cabinet Units With Shutters Of Approx Size Of 400Mm Deep X 700Mm High Made Of 19Mm Thick Bwr Grade Block Boards Including Intermediate Shelves As Per Drawing / Instructions. Exposed Surfaces Shall Be Finished With 1.00Mm Laminate Of Approved Shade And Make. Inner Faces Shall Be Polished/ Painted In Approved Shade. Free Edges Of Block Board Shall Be Finished With Polished White Or Steam Beech Wood Half Round Moulds (Out Of 20 X 20 Mm Sections).Inner Faces Of Cabinet Units Shall Be Polished In Approved Shade Quoted Rates Shall Include Cost Of Necessary Hardware, Viz Handles, Locks With Keys In Duplicate, Etc.Providing And Fixing Flap Door Made Of Block Board With Approved Lamination On Both Side, Of Required Size With Hinges/Tower Bolts/Stopper/Handles Etc Complete.Labour Charge Only For A) Fixing Of Ceiling Light Fittings In False Ceiling (2’X2’) B) Fixing Of Ceiling Light Fittings In False Ceiling (Round) C) Fixing Of 4’Long Tl Fittings D) Fixing Of Wall/Ceiling Fans E) Fixing Of Exhaust Fan Note:- Above Items Will Be Supplied By The Bank.Providing And Fixing Aluminum Work For Doors, Partition, With Extruded Built Up Standard Tubular Sections/ Appropriate Z Section And Other Sections Of Approved Make Conforming To Is:733 And Is :1285, Fixing With Dash Fasteners Of Required Dia And Size, Neoprene Gasket Wherever Required, Handle With Glazing By 8 Mm Thick Clear Glass, Floor Spring Of Approved Make Complete As Per Direction. Anodized Aluminum Of Minimum Anodic Coating Of Grade Ac15Supplying, Fitting And Fixing Mirror Finish Vitrified Tiles Of Size 600Mmx600mmx9mm Of Approved Make And Colour Laid With Manufacturer Mortar Including Leveling The Existing Floor By Cutting/Providing Additional Cement Mortar For Proper Completion Of The Job. Preparation Of Surface And Applying Spectrum Painting On The Wall To Give A Elegant Look. Providing & Applying 2 Coats Or More Acrylic Emulsion Paint Of Approved Make To Interior Walls And Ceiling Over A Coat Of Primer Including Parishing As And Where Required, Cleaning And Smoothening Surface Etc Complete As Directed.Providing & Applying 2 Coats Or More Enamel Paint Of Approved Make To Doors /Windows Over A Coat Of Primer Including Cleaning And Smoothening Surface Etc Complete As Directed.A) Dismantling The Old And Unused Point Wring, Circuit Wiring, Switch Boxes And Stacking The Same As Per DirectionChase Cutting In Floor And Providing And Fixing 25Mm Dia Pvc Pipe With Cement Mortar As Per Direction Including Mending Good The Damages. A)Supplying And Drawing Power Line By 2X 6 Sqmm + 1X2.5 Sqmm Frls Pvc Insulated Copper Wire By 19Mm Pvc Pipe Fully Concealed And Mending Good The DamagesB) Supplying And Connection By 2X 10 Sqmm + 1X6 Sqmm Frls Pvc Insulated Copper Wire Between Db And Panel By Making Proper End Socketing Including Supplying 25Mm Pvc Pipe.Supplying And Drawing Circuit Line By 2X4 Sqmm + 1X1.5 Sqmm Frls Pvc Insulated Copper Wire By 19 Mm Pvc Pipe Fully Concealed And Mending Good The DamagesSupplying And Drawing Circuit Line By 2X2.5 Sqmm + 1X1.5 Sqmm Frls Pvc Insulated Copper Wire By 19 Mm Pvc Pipe Fully Concealed And Mending Good The DamagesMaking Point Wiring For Fan & Light By 2X1.5Sqmm +1X1 Sqmm Fr Pvc Insulated Single Core Copper Wire By 19 Mm Pvc In Concealed Manner Including Modular Type Switch & Socket 6Amp, M.S.Box, Top Plate And Cover Plate.A) Single Point Controlled By Single SwitchB) Double Point Controlled By Single Switch.C) Plug Point 6AmpSupplying And Fixing Concealed Type Factory Fabricated 1 Phase 240 Volt Spn Mcb Distribution Board ( Double Door) With 40 Amp Dp Rccb Of 300 Ma As Incomer Complete With Interconnection With Mcb, Copper Bus & Neutral & Earth Link.A) 8 Way With 6 Nos Sp Mcb (5-10 AmpB) 12 Way With 10 Nos Sp Mcb ( 5-10Amp)Supplying And Fixing Concealed Type Factory Fabricated 3 Phase 400 Volt Tpn Mcb Distribution Board 4 Way Per Phase With 63 Amp Tpn Rccb Of 300 Ma Sensivity As Incomer And 12 Nos (6-25) Amp Mcb Sp As Out Going Complete With Interconnection With Copper Bus & Neutral & Earth Link.Supplying And Fixing 2 Nos 3 Pin 6 Amp Socket And 1 No 15Amp Controlling Switch Of Modular Type And Connection Including M.S Box, Cover Plate And Top Plate In One Board.Supplying And Fixing 1 No 3 Pin 6 Amp Socket With Controlling Switch Of Modular Type Including M.S.Box, Cover Plate And Top Plate For RawSupplying And Fixing 1 No 6 Pin 6/16 Amp Socket With Controlling Switch Of Modular Type Including M.S.Box, Cover Plate And Top PlateSupply And Drawing Telephone Cable Of Approved Make In The Pvc PipeA) 2 PairB) 4PairD) Termination Of Telephone Cable In One End With Rj11 Telephone Socket (Jack Type) - 2 Nos In 1 Module In Suitable Enclosures.E) Termination Of Telephone Cable In One End With Rj11 Telephone Socket (Jack Type) - 1 No In 1 Module In Suitable Enclosures Chase Cutting In And Wall And Providing And Fixing 20Mm Pvc Pipe As Per Drawing Including Mending Good The Damages. Supplying And Fixing 2 Nos 40 Amp Dp Mcb In Suitable Enclosures For Ups Incoming & OutgoingSupplying And Fixing Air-Conditioner Starter North West / Havels Having Short Circuit Protection In Suitable Enclosures Including 20 Amp 3 Pin Plug Top. Dismantling Existing False Ceiling Carefully And Disposal Off Debris / Rubbish From The Site Including Stacking The Serviceable Materials.Dismantling Existing Clerical /Cash Counter Along With Partition, Grill And Quote Salvage Value For Taking Out The Same.