Quay - I Shop Extension And Shifting OfSupervisor’S Cabin--1Auger Boring Using Rotary Method AndInstalling Bored Cast- In- Situ 450MmR.C.C. Pile (10 Nos Of Dmc Piles) OfSpecified Diameter And Average Depth 50MFrom Cutoff Level Using M30 Mix HavingCement Not Less Than 400Kg/M3 With 20MmNominal Size Hard Granite Broken Stone AsPer Approved Drawings And Specification.The Rate Shall Include Boring ThroughVarious Classes Of Soil Except Rock AndConcrete, Cost Of Labour, Hire Charges OfEquipments, Materials (Except Cost AndFabrication Charges Of Reinforcement SteelAnd Cost Of Cement), Cost Of BentoniteEarthwork Excavation In Ordinary Soil AndDepositing On Bank With Lift WithoutDamaging Nearby Structures, Cables, PipesEtc., Including Shuttering, Shoring,Dewatering All Labour, Other Incidentals Etc.Complete For The Successful Completion OfThe Work.And Cost Of Cement), Cost Of BentoniteSlurry, Hire Charges Of Piling Equipments,Consumables, Tools And Plants, Vehicles,Mobilization And Demobilisation Charges,Disposing Off Used Bentonite, Muck/ ClayAnd Debris And Removal Of Laitance EtcComplete. (Pile Length For Payment Will BeReckoned From Cutoff Level Only.)Conducting In-Situ Standard PenetrationTest At A Depth Of About 40 To 50M(Average) Inside The Pile Bore Hole ToAscertain The N Value, All Complete And AsDirected By The Engineer-In-Charge. RateIs Inclusive Of Hire Charges Of Tools AndPlants, All Labour, Other Incidentals Etc.Complete..A) Up To 1.50 MB) Beyond 1.5 M45A) FoundationB) FlooringProviding And Laying Plain CementConcrete 1:5:10 Using 40Mm I.S. NominalSize Hard Granite Broken Stone IncludingCost And Conveyance Of All Materials,Labour For Mixing, Laying, Consolidating,Curing, Cost Of Form Work, (Cost OfDewatering And Leading Water To NearbyDrain For The Construction) Etc. Complete,Excluding Cost Of Cement.The Work.Supplying And Filling Crushed Sand InFoundation Trenches To Line And Level As PerThe Drawing And Consolidating By WateringIn Layers Not Exceeding 100Mm Thick EachIncluding Cost And Conveyance OfMaterials, Labour, Other Incidentals Etc.Complete.6A) FoundationB) Flooring And Ramp7A) FoundationProviding And Laying Plain CementConcrete 1:4:8 Using 40Mm I.S. NominalSize Hard Granite Broken Stone IncludingCost And Conveyance Of All Materials,Labour For Mixing, Laying, Consolidating,Curing, Cost Of Form Work, (Cost OfDewatering And Leading Water To NearbyDrain For The Construction) Etc. Complete,Excluding Cost Of Cement.Providing And Laying R.C.C 1:1 1/2:3 Using20Mm I.S Nominal Size Hard Granite BrokenStone Including Cost And Conveyance Of AllMaterials, Labour For Mixing, Laying,Consolidating, Curing, Cost Of Formwork,Hire Charges For Tools And Plants, OtherIncidentals Etc. Complete Excluding CostAnd Fabrication Charge Of ReinforcementAnd Cost Of Cement.B) Column EncasementC) Flooring And RampD) Lintel And Shade89Random Rubble Work In Foundation AndPlinth With Cement Mortar 1:5 For All LeadsAnd Lifts Including Cost And Conveyance OfAll Materials, Labour, All Other IncidentalsEtc, Complete But Excluding The Cost OfCement.Fabricating And Placing In Position TorsteelReinforcement To Size And Shape IncludingCost And Conveyance Of All Materials,Labour For Uncoiling, Straightening, Cutting,Bending, Binding, Lapping Etc. CompleteExcluding Cost Of Reinforcement. (Rate IsInclusive Of Cost Of 18G Binding Wire.)10Supplying, Fabrication And Erection OfStructural Steel Work In Built Up SectionWelded In Columns, Girder, Ladder Etc,Including Erecting In Position, Aligning TheErected Structures, Bolting Or WeldingWherever Required As Per ApprovedDrawing And Other Accessories, Cost AndConveyance Of All Materials, AllConsumables, Accessories Including BoltsAnd Nuts, Welding Rods, Labour, PaintingWith One Coat Yellow Zinc Chromite PrimerBefore Fabrication After Complete CleaningThe Surface By Power Brushing / WireBrushing Etc. Rate Shall Be Inclusive OfAligning Screed Bars To Line And Level As PerDrawing Before Erection Of Columns.Weight Of Nuts, Washers And Bolts Will BeMeasured In This Item. No Wastage Will BeMeasured In This Item. (Provision Of BoltHoles To Be Made As Required At No ExtraCost).