| 1 | CARRIAGE OF MATERIALS |
| 2 | CARRIAGE OF MATERIALS (By Mechanical Means): Carriage of Materials by mechanical transport including loading, unloading and stacking :: The rates will be applicable to net quantities after deduction of prescribed percentage for voids mentioned in the specification under subhead \"Carriage of Materials\" |
| 3 | 1) Earth |
| 4 | E) 5 Km |
| 5 | F) Beyond 5 Km upto 10 Km. per Km. |
| 6 | SITE CLEARANCE |
| 7 | Dismantling of existing structures like culverts, bridges, retaining walls, CC road and other structure comprising of masonry, cement concrete, wood work, steel work, including T&P and scaffolding wherever necessary, sorting the dismantled material, disposal of unserviceable material and stacking the serviceable material with all lifts and lead of 50 metres as directed by Engineer. |
| 8 | 1) Lime Concrete, cement concrete grade M-10 (1:5:10) and below |
| 9 | 2) Cement Concrete Grade M-15 and above and PCC blocks |
| 10 | CEMENT CONCRETE PAVEMENTS |
| 11 | Providing and laying lean cement concrete 1:4:8 in Sub- base over a prepared sub-grade with coarse and fine aggregate conforming to IS: 383, the size of coarse aggregate not exceeding 25 mm, aggregate cement ratio not to exceed 15:1, aggregate gradation after blending to be as per table 600-1, cement content not to be less than 150 kg/ cum, optimum moisture content to be determined during trial length construction, concrete strength not to be less than 10 Mpa at 7 days, mixed in concrete mixer, laid manually, compacted with surface vibrator, finishing and curing complete as per clause 601, 112 of MoRT&H specification including all material, labour, machinery, lighting, guarding and maintenance of diversion. |
| 12 | Providing and laying un-reinforced, dowel jointed, plain cement concrete mix in pavement over a prepared sub base with 43 grade cement, coarse and fine aggregate conforming to IS: 383, maximum size of coarse aggregate not exceeding 25 mm, mixed in a batching and mixing plant as per approved mix design, transported to site, laid with a fixed form or slip form paver, spread, compacted and finished in a continuous operation including provision of contraction, expansion, construction and longitudinal joints, joint filler, separation membrane, sealant primer, joint sealant, debonding strip, dowel bar, tie rod, admixtures as approved, curing compound, finishing to lines and grades complete as per drawing and as per clause 602, 112 of MoRT&H specification including all material, labour, machinery, lighting, guarding and maintenance of diversion. |
| 13 | 1) PCC M-20 |