| 1 | Sub Head-ISub-Station, DG set & IEIRunning Maintenance and Operation of Sub-Station Equipments (630 KVA), DG Set (250 KVA & 40 KVA) and IEI with all allied accessories including routine and preventive maintenance. Details of installations are given in Annexure-A Schedule for routine and preventive maintenance is given in Annexure-B & C Operation shall be done by deploying 3Nos. Electrician (One in each shift total 3 shifts).& 3 Nos. Khallasi in (One in each shift total 3 shifts). |
| 2 | Dehydration, filtration of transformer oil of 2 nos., 11KV transformer in existing sub-station i/c filling of fresh oil, testing etc. as required. (630 KVA Transformer) |
| 3 | Calibration of relays, HT / LT meters, temperature meter, buckles relays and servicing of 11 KV vacuum circuit breakers of HT panel Kirloskar Make along with oiling, greasing of all movable and fire mechanism included checking of contact, resistance, timing of closing and opening of breaker, checking of closing coil / tripping coil resistance and measuring the vacuum level on the desired voltage level with respect to each pole. |
| 4 | Servicing and overhauling L&T make L.T ACB of following rating with cleaning , alignment, adjustmentof gap between phase lubricating all moving parts adjustment for smooth mechanical operation etc complete as required |
| 5 | Servicing of 11 KV 3 Phase 50 Hz HT VCB(Siemens make) Panel Comprising of 1 No. 11 KV HT VCB with measuring and protection instrument i/c cleaning of component with CTC/CRC solution, replacement of minor parts like nut bolts and spring washer alongwithgreesing/ oil testing complete as required. |
| 6 | Testing and calibration of HT IDMT relay with secondary injection test set i/c , cleaning servicing of contacts, tightening of loose contacts testing repair etc, complete as required. |
| 7 | Carrying out \"B\" Check of the individual D.G Set (Capacity 250 KVA, Cummins Make, Model KTA50G81) from OEM / authorized dealer. |
| 8 | Major Servicing and overhauling 40 KVA DG Set i/c providing and replacement of all lubricants, filter, start-stop switch with key repair, testing etc. complete as required from OEM / authorized dealer. |
| 9 | Supplying of following sizes of FRLS PVC insulated copper conductor, single core cablecomplete as required. |
| 10 | 1 x 2.5 sq. mm |
| 11 | 1 x 4 sq. mm |
| 12 | ComprehensiveMaintenance of Dardelian Fountain/Tube dome fountain/Foam Jet fountain i/c cleaning, paintaing and connection testing etc as required. |
| 13 | Supply and replacement of following items with i/cconnection , testing etc as required with less rebate of dismantle materials. a)GI pipe 40 mm mediumB Class |
| 14 | b)GI pipe 50 mm mediumB Class |
| 15 | c) 3 core PVC insulated and PVC sheathed Submersible cable (4 mm) for submersible pump motor. (DSR-2022, 1.17.21) |
| 16 | Lowering of sub. Pump set in the existing bore well up to the required depth along-with existing G.I pipes and accessories etc. i/c dismantling of G.I pipe and disconnection the sub. |
| 17 | Lifting outof sub. Pump set from the exiting bore well up to the required depth along-with existing G.I pipes and accessories etc. i/c dismantling of G.I pipe and disconnecting the sub. Cable etc. Complete as reqd. |
| 18 | Repairing & rewinding of following capacity 3 phase Mono block pump sets including cartage, dismantling, reassembling, supplying & replacement/ repairing of damaged parts of pump sets and making good for operation including connection testing, painting etc complete as required. |
| 19 | Sub Head-IIRO SystemMaintenance Contract for RO 150 /50 L.P.H (Summer Session) |
| 20 | Maintenance Contract for RO 150 /50 L.P.H (Lean Period / Winter Session) |
| 21 | Supply and Replacement of following parts of 150 /50 L.P.H connection testing etc. as required.a) RO Booster Pump |
| 22 | b) Adapter 24 to 48 Volt |
| 23 | c) Membranes for 50 Ltr RO |
| 24 | d) Carbon Filter (20”) Set |
| 25 | e) Carbon Filter (10”) Set |
| 26 | f) Pipe 1/4 or 1/3 inches |
| 27 | g) Auto Switch (contain LPS, HPS, NRV) |
| 28 | h) Membranes for 150 Ltr RO |
| 29 | i) pre filter for 150 Ltr RO |
| 30 | Sub Head-IIIFire Alarm & PA SystemRunning Maintenance and Operation of Addressable Type Fire Alarm & P.A. System including routine & preventive maintenance as per details of installations at Annexure-‘D’ & schedule of routine & preventive maintenance at Annexure-‘E’ by deploying one no. Operator cum Technician (Skilled) in each shift (total three shifts) |
| 31 | Comprehensive maintenance of addressable intelligent fire detection and alarm system including routine, preventive & breakdown maintenance of items such as control panel, optical smoke detectors, heat detectors, fault isolator, response indicators, hooter CKT control, hooters etc. as per inventory and additional condition attached. |
| 32 | Refilling & repainting of following type fire extinguisher installed in different location at Various Sports Complexes i/c testing etc complete as required.(a) Water type Fire Extinguisher (Stored Pressure) Capacity 9Ltr. |
| 33 | b) Co2 type capacity 4.5 kg. |
| 34 | c) ABC Type (Stored Pressure) capacity 5 Kg. |
| 35 | Supplying and fixing of Powder type Fire Extinguisher (Stored Pressure Type) Capacity 4 Kg confirming to IS-15683 with IS 14609 ISI marked ABC powder complete with squeeze grip release valve , discharge pipe, locking arrangement ,pressure gauge, operation Manual and bracket, operating temperature- 10 degree to +55 degree. etc as required. |
| 36 | Supplying and fixing of Water Type Fire Extinguisher stored pressure type ISI Marked confirming to IS: 15683 Capacity 9 Ltr with delivery hose, squeeze grip type valve, locking arrangement pressure gauge, operation manual and bracket. etc as required. |
| 37 | Supplying and fixing Co2 type Fire Extinguisher ISI marked confirming to IS: 15683 capacity 4.5 kg complete with delivery hose horn squeeze grip/wheel type release valve, locking arrangement operation manual and bracket, operating temperature -30 degree to +55 degree. etc as required. |