| 1 | Supplying, laying, fiting, fixing and jointing of UPVC pipes conforming to IS:4985-2000 with latest revision and amendments, if any, with necessary UPVC/CI specials, CIDF sluice valves, as per relevant I.S. specification including labour charges for earth work in excavation in any kind of soil including mixed soil with boulder ,road sub-grade and its flanks but excluding moorum and laterite or sand stonehard arock including cutting of brick paymentwithout damaging the existing telephone/electrical cable line etc.(in case of damage of any type of cable line during excavation, necessary damaged charges as applicable by the respaective authority will be borne by the agency in his own cost. Loading, unloading, carrying of pipes, specials, valves from the local store to work site and lowering laying of pipes specials valves carefully in trenches maintaining proper levels and alignment ,jointing the pipe and specials including supplying of good quality/approved brand solvent cement (as per IS:14182-1994 including cost of all fabricated PVCfitting i.e. tees,bend, reducers, adopter etc.as per IS:101-1988 and making flange joints including supplying required quantity of nuts, bolts and rubber insertion (CIDF sluice valves will be supplied by the department free of cost) as required at site by adopting suitable method so as to facilate the maintenance of pipe line locally as per conventional method including back filling the trenches with good earth obtained from excavation of trenches including consolidation with watering in layer not exceeding 150mm thk. with maintaining an average depth of |
| 2 | cushion of 1.10mtr. from the top of pipe line including making interconnection with distribution pipes etc. all complete as per drawing direction and satisfaction of the E.I.C.N.B. i) Manufacturer’s test certificate for UPVC pipe & specials to be produced before laying of pipe line.ii) 3rd party inspection of UPVC pipe & specials to be done by CEPET or (India) SGS/NTH Kolkata or as per direction of EIC as per approved vender list.iii)No part payment at any stage on account of supply of materials shall be entertained.iv)Payment will be made on actual consumption of materials.v)UPVC pipes for the works to be supplied as per approved vendor list and as per direction & satisfaction of EIC. No pipes will be allowed beyond recommendated vendor list.vi)Submission of drawing of pipe line with statement of materials consumed between node to node points against each R.A. & final bill.if so.vii) Any deviation from required clear cover of 1.10mtr.due to site adverse condition, prior permission is to be obtained from EIC and payment for such work will be made on prorate basis over the rate of entire item.viii)All pipe connection shall be completed in all respect and as per directionof EIC. Decision of EIC in this respect is final & binding. In case of any deviation/or any left out pipe connections an amount of Rs.10,000.00 for each pipe connection will be realized/recovered from the bill.(A) Pressure Rating : Class - III (ii) Laying of pipe line including cost of pipe & fittings/specials but excluding cost of valves. |
| 3 | a) 90mm(OD) |
| 4 | Construction of different dia Sluice valve /Air valve /Washout chamber in different sizes for village road where light traffic run and for main road where heavy traffic run as deptt.approved drawing with 25cm thick brick work (1:6) over cement concrete (4:2:1) over a single B/F soling over150mm.thick sand filling in foundation including earth work in excavation and disposal of excess earth from work site with RCC (1:1.5:3) cover slab 100mm / 150mm thick slab on top of chamber with 1% reinforcement in RCC cover slab with necessary opening for operation of valve all complete including cost of labour & materials as per Departmental Dwg. [Reinforcement type:- Other manufactuerers not specified]. |
| 5 | i) 80 mm to 150 mm dia pipe. |
| 6 | Labour charges for horizontal auger boring through any kind of soil for road crossing in connection with laying distribution system including the cost of laying CI/DI cashing pipe and distribution pipe through the bore and including hire charges of all tools and plants, 5 H. P. centrifugal pump for dewatering, loading, unloading and carriage of pipes from departmental store, preparation of operation pit, filling and compaction of trenches and pit with silver sand and brick bats including cost of lightening arrangement all complete as per direction of EIC. |
| 7 | Earth work in filling in compound, tank, low land, ditches etc. with good earth, in layers not exceeding 150 mm. including breaking clods and consolidating the same by ramming and dressing complete. (Payment will be made on profile measurement before and after the work)With carried earth supplied by the Contractor including cost of carried earth within a radious exceeding 1 K.M. but excluding 3 K.M. including cost of carried earth (Payment to be made on the basis of measurement of finished quantity of work). |
| 8 | Supply and delivery of CIDF sluice valve (Special type) PW-1.00 of different dia make with CI double flanged non rusting spindle sluice valves conforming to IS 14846 -2000 with latest emended having body dome/ bonnet and cover of C.I.Gr-F.G 210mtr. spindle of IS-6603 G.R12/Gr-13 non-magnetic, nuts seat rings are of Gunonetal as per IS:318 LTB-2 flanges and drilled to IS:1538 Part IV & VI valves are suitable for max. working pressure of 10kg/cm2(seat test) and body tested to 15kg/cm2.N.B: The above item should be procured from the reputed manufactures as per deptt. approvedvender list |
| 9 | i) 100 mm dia. |
| 10 | ii) 150 mm dia. |
| 11 | Making flange joint to DI/CI pipes, specials and valves where necessary with supply of required rubber insertion and nut bolts, washers etc. of approved quality and type all complete as per specification and direction of EIC (Nut and bolts shall be of TATA/GKW rate) |
| 12 | i) 100 mm dia. |
| 13 | ii) 150 mm dia. |
| 14 | Filling the pipe line with water, testing hydraulically as per I.S 3114-1965 (Article-6) in section of a length not exceeding 500mtr. for head of pressure as per specification including supplying installing and fixing all equipments such as diesel pump set, blank flange, pressure gauge, valve, pressure pump and all other tools and plants including drilling topping and plugging of necessary holes to pipes, blocking ends providing temporary thrust block and subsequent blocking of holes and other jointing materials and dismantling and removal of the same including disposal of water etc. all complete as per specification and direction of EIC. The rate is inclusive of cost of requisite water to be arranged by the contractor (Recovery rate of water @ Rs.10.00/m3, if contractor used water from deptt. source). UPVC |
| 15 | a) 90mm(OD) |
| 16 | Ordinary Cement Concrete(mix4 : 2 :1) with graded stone chips (20 mm. nominal size) excluding shuttering and reinforcement, if any, in ground floor, as per IS codes. |
| 17 | Dismantling all type of plain cement concrete works, stacking serviceable materials of site and removing rubbish as directed within a lead of 75mtr. for laying all dia pipe line in ground floor,a) upto 150mm thick. |
| 18 | Rectification or repairing of existing FHTC connection from /EachC.I./D.I./UPVC/HDPE/G.I./A.C. distribution pipeline with labour cost for cutting trench (1m X 0.9m X 1.2m) carefully without damaging the existing distribution pipe line, (in case of damaged if any pipe line during eexecution, necessary damaged should be repairing by the agency in his own cost) removing carefully old damage / good condition saddle piece, brass /gunmetal and refitting saddle pice and ferrul and all accessories, after connection work filling the trenches by earth all labour work are complete (Excluding all necessary Materials) as per direction of EIC. |
| 19 | Supplying, fitting, & fixing alloy iron with brassspindle Bib cock/ Stop cock of approved brand and make, spray painted and tested to 21 Kg per Sq.cm. (i) 15 mm. dia. |
| 20 | Providing FHTC from the existing CI/DI/uPVC/HDPE/GI/AC distribution pipeline by installing 10 mm NB Gun-metal Ferrule conforming to IS 2692:1989 with latest amendments on the said pipeline with supply, fitting & fixing of all other accessories like saddle piece of required size to fit the existing distribution pipe line, specials, nut & bolts, rubber sheet, washers etc and supply & laying of 15 mm NB PVC (schedule 80)/20 mm OD HDPE (PE100, PN16) pipe (average 15m length) with all necessary specials 1.0 metre below the ground connecting the ferrule including cutting trenches in all sorts of soil and filling up trenches as per direction of the Engineer- in Charge and upto a point just inside the premises of the household or as directed by EIC. Supply and installation of a 15mm dia. alloy iron Bib Cock (tested to 21 Kg/cm²) above 1.0 Mtr. from ground, an alloy Stop Cock of 15 mm dia. with brass spindle (tested to 21 Kg/cm²) to be fitted in a position as directed by E.I.C. G.I. pipe of TATA make (medium duly) of 2 metre length with all necessary specials to continue from the end of the HDPE/PVC pipe and upto 1.0 m above ground within the premises of household.Note:-1. PVC pipe shall of Schedule 80 (medium duty) conforming to ASTMD - 1785 and threaded to match with G.I. Pipes as per IS:1239 (Part-I)2.Payment of Supply & laying of 15mm NB PVC (schedule 80)/20mm OD HDPE (PE100, PN16) pipe with all necessary specials 1.0 metre below the ground will be made on actual measurement basis. The rate of this item is Rs. 117/- per metre.3) Materials to be supplied as per approved vendor list of PHED.( Corrigendum no-2 WBPHED SChedule of RateJuly 2019 SOR of FHTC20/01/2022/O/oCEPWQM(DPHE) |
| 21 | a) Up to 10 m length |
| 22 | b) Above 10 m upto 20 m Length |
| 23 | Collection of house hold details at PRESCRIBED FORMAT THROUGH Mobile App and hard copy including Geo-reference as directed by E.I.C and submission of the same to P.H.E dte in soft copy . |
| 24 | Provision for extra supply and laying of 15 mm NB PVC schedule 80)/20 mm OD HDPE (PE 100, PN 16) pipe with all necessary specials 1.00 meter bellow the ground level including cutting trenches in all sorts of soil and filling up trenches as per direction of the E.I.C. |
| 25 | Making Village Road (Avg. 3M width) crossing by Horizontal auger borng for accomodation of laying of avarage 3(three) nos. 15 mm dia pipes for FHTC or as per direction of Engineer-In-Charge. |
| 26 | Supplying, fitting and fixing G.I. pipes of TATA make with all necessary accessories, specials viz. socket, bend, tee, union, cross, elbo, nipple, longscrew, reducing socket, reducing tee, short piece etc. fitted with holder bats clamps, including cutting pipes, making threads, fitting, fixing etc. complete in all respect including cost of all necessary fittings as required,jointing materials and two coats of painting with approved paint in any position above ground. (Payment will be made on the centre line measurements of total pipe line including all specials. No separate payment will be made for accesories, specials. Payment for painting will be made seperately)A) For Exposed Work.(i) 15 mm dia. medium quality. |
| 27 | Submission of complete detailed drawing of distribution system, rising main etc. after execution of work showing position of different types of valves, fittings/specials sluice valve chamber with location, node to node wise in the sanctioned drawing as completion drawing of the water supply scheme as per direction and satisfaction of EIC. The list of dia wise fitting/specials, different pipes ;of valve used in the rising main should be shown in the completion drawing (not separate) with verified by JE & AE in-charge of the scheme. The above drawing will be submitted in 5 copies. |
| 28 | Carriage of different type of departmental pipes from Divisional/Sub-divisional store to the work site by truck including loading, unloading, stacking etc. including cost of fuel, lubricant and also cost of driver, helper etc. and all other taxes and charges as applicable as per direction of EICa) Above 20 KM to 30 KM |
| 29 | Add Includng GST @18% |
| 30 | Add Includng CESS @1% |