Tender for Supply of equipment / material, design, erection, testing, commissioning for deposit estimate for Shifting of old LWSS Daulatpur Jalari scheme from Dibba to new pump house at Sangam (Near Yogindra Power House)Under ESD Ranital .-Erection and material of 11/0.4KV,250 KVA S/Stn. 2 Prov.Steel Tubular Poles (9 m, Working Load > 200 kgf/m²) 3 Prov.X-Arm: [Channel Iron (100x50x5 mm), Length : 2800 mm X 2 Nos] for incomer line 4 Prov.MS Angle Iron (50X50x6 mm), Length: (2800 mm) x1 Nos for LAs 5 Prov.X-Arm: [Channel Iron (75x40x6 mm), Length : (2800 mm X 4 Nos] for supporting DO fuse unit & GO switch 6 Prov. X-Arm:[Channel Iron (100x50x5 mm), Length : 2800 mm X 2 Nos]for CT-PT Unit 7 Prov. X-Arm [Channel Iron (100x50x5 mm), Length : (460mm) x 2 Nos for supporting Main Channel of CT-PT Unit] 8 Prov. MS Angle Iron (50X50x6 mm), Length : (2800 mm) x 2 Nos 9 Prov. MS Angle Iron (35X35x6 mm), Length : (460 ) x 2 Nos 10 Prov. MS Angle Iron (50X50x6 mm), Length : (950 mm) x 2 Nos for Bed Knee Bracing 11 Prov. CT-PT Combined Unit 11 KV 100/5 Amp 12 Prov.Energy Meter 11 KV HT -/5 Amps 13 PVC Multistrand 4 mm² copper wire with Φ-1 inch GI pipe for concealing 14 Prov. MS Angle Iron (50X50x6 mm), Length : (2800 mm) x 2 Nos 15 Prov. MS Angle Iron (50X50x6 mm), Length : (450 mm) x 1 Nos 16 Prov. GO Switch Handle Supporting: [Channel Iron (75x40x6 mm), Length : 460 mm 17 Prov. D.O Fuse Unit 18 Prov. Surge Arrester, 9 kV Station Class(Porcelain Type) 19 Prov.Disc insulator ,1 No Disc (12 kV, 90 kN) including Dead End Clamps etc. 20 Prov. Pipe Earthing Set 21 Prov. Half Clamp (M.S. Flat 50X6 mm) 22 Prov. Full Clamps (M.S. Flat 50X6 mm) 23 Prov. Nuts and Bolts of Various Sizes(with flat and spring washers)] 24 Prov. Barbed Wire 25 Prov. LT Distribution Panel Box With MCCB(630A, 50KA,3P, 1No) & MCCB (250A, 36KA,3P, 3No) 26 Prov. Aluminium Paint. 27 Prov.AAAC 7/3.15mm² Conductor for Earthing 28 Dismentalmentcharges( S/stn structure=10000,Hydra Charge for DTR =25000, Di-hydration of DTR=15000)complete in all respect 29 Erection charges complete in all respect 30 Transportation charges complete in all respect 31 (B)Erection and material of 11 KV HT Line 32 Prov.AAAC 7/3.15mm² Conductor (50mm²) {Includes Cutting and wastage} 33 Prov. Steel Tubular Poles (10 m, Working Load > 200 kgf/m²) 34 Prov.M.S C.I X-Arm (1500x100x50x5 mm),Long For Single Pole 35 Prov.M.S A.I X-Arm (1800x50x50x6 mm),Long For Single Pole 36 Prov.M.S A.I X-Arm (50x50x6 mm), Length (2x750) mm Long For Single Pole 37 Prov.M.S A.I X-Arm (50x50x6 mm), Length (2x600) mm Long For Single Pole 38 Prov.M.S C.I X-Arm (2400x100x50x5 mm),Long For Double Pole 39 Prov.M.S A.I X-Arm (2700x50x50x6 mm),Long For Double Pole 40 Prov.M.S C.I X-Arm (2400x75x40x6 mm),Long For G.O Switch &D.O.Fuses 41 Prov.Belt Set - MS A I 50x50x6, Length [2400 mm x 2 No.] For Double Pole 42 Prov.X-Bracing Set - MS A.I Iron 50x50x6,[2700 mm x 2 No.] For Double Pole 43 Prov.11 kV Pin Insulators (Porcelain, 12 kV, 10 KN) 44 Prov.Disc insulator ,1 No Disc (12 kV, 90 kN) including Dead End Clamps etc. 45 Prov.HT Earthing set complete 46 Prov.Double Continous Earth wire (GI, 8 SWG) @ 0.102 kg/m 47 Prov.Nuts and Bolts of Various Sizeswith flat and spring washers 48 Prov.Barbed Wire 49 ProvAluminium Paint 50 Prov.Full Pole Clamps (M.S. Flat 50X6 mm) 51 D.O Fuse Unit 52 Transportation charges complete in all respect 53 Erection charges complete in all respect 54 (C)Erection and material of 3 - Phase LT Line 55 Prov.AAAC 7/3.15mm² Conductor (50mm²) {Includes 4 conductor lengths for 3Φ & Neutraland Additional 1% (Sag, Jumpering and wastage} 56 Prov.Steel Tubular Poles (9 m, Working Load > 180 kgf/m²) 57 Prov.Shackle Insulator (16 kN) 58 Prov.D-Iron (U- Clamps) 59 Prov.Earth Knob 60 Prov.Full Pole Clamps (M.S. Flat 50X6 mm) 61 Prov.Earthing Set complete 62 Prov.Earth wire (GI, 8 SWG) {Additional 1% (Sag and wastage)} @ 0.102kg/m 63 Prov.Spool Tie 64 Prov.Nuts and Bolts of Various Sizes (Galvanised / Coated) [Preferably 16mm Φ or more (with flat and spring washers)] 65 Prov.Aluminium Paint 66 Transportation charges complete in all respect 67 Erection chargescomplete in all respect