| Sl. No. | Item Description |
| 1 | 10/16 KVA Single Phase Alu. Wound (Workshop SACHAINDI (KANPUR NAGAR)) -Dragging, Shifting, Handling ofDamageTransformer from stacking yard to Dismantling area.Draining of Oil into pit/drum. Opening of top cover plate by T&P or cutting of sealed Transformer top cover plate by chisel Hammer Process, taking out the core and coil assembly from the tank.Dismantling core and coil assembly. Assembly of displaced core and cleaning of dust and dirt by cotton waste and wooden dust from every leaf of laminations if required(Welding/Brazing/Gas Cutting/Wooden Dust required for this work shall be arranged by the contractor). |
| 2 | Making of L.V. Coils as per original design/design approved by concern JE/AE (Using either new coil or reconditioning old coil as per technical conditions of old coil). |
| 3 | Making of HV Leg coils of same size and dimensions as old one or design approved by concern JE/AE (Using either new coil or reconditioning old coil as per technical conditions of old coil). |
| 4 | Assembly of core and coils and fitting of other parts requiring replacements such as press board etc. Making supports between adjacent section by insulation spacers barriers etc. and tapping etc (Brazing/Soldering required, shall be arranged by the contractor). Shifting and keeping the assembled core and coils etc. In OVENfrom the repairing and assembly place. |
| 5 | Cleaning of tank in cleaning yard.Repairing of burst body & radiator properly with welding including repairing of bended base channel.Painting of inner side of transformer tank and channels with heat proof zinc chromate paint of good quality.(Berger, Nerolac, Jenson & Necholson etc) Paint material shall be provided by contractor at his own cost. |
| 6 | Dragging out clean empty tank from yard to repairing hall. Taking out assembled core and coils assembly from the \"OVEN\" after proper megger value and shifting to repairing hall. (Meggar will be arranged by the contractor at his own cost.). Retanking ofcomplete assembly into painted tank andProper tightening of the assembly in the tank safely by using nut bolts and spring washer of good quality, Fitting of all accessories ofthe transformer including fixing of pressure release valve/vent pipe and filling of oil in transformer (Vent Pipe will be arranged by the contractor at his own cost.). Punching of unique no. on MS plate 100x50x3 mm. size & Welding of MS Plate on Transformer Body containing following information:- Uniqe Number, Capacity (MS Plate & Punching Machine shall be provided by contractor). |
| 7 | Refiting/Replacement/Fixing of HT Bushings. |
| 8 | Refiting/Replacement/Fixing of LT Bushings. |
| 9 | Refiting/Replacement/Fixing of HT Bushing Rods. |
| 10 | Refiting/Replacement/Fixing of LT Bushing Rods. |
| 11 | Refiting/Replacement/Fixing of HT Gasket/Oil Seal for all phase. |
| 12 | Refiting/Replacement/Fixing of LT Gasket/Oil Seal for all phase. |
| 13 | Refiting/Replacement/Fixing of Top Cover Plate Gasket with typing of top cover plate by using nut bolt & washer. |
| 14 | Refiting/Replacement/Fixing of Arching Horns/Breather. |
| 15 | Painting of T/F outside with super enemal synthetic paint in two coats after de-rusting and providing primer of red oxide paint etc.(color should be decided by EE WS) Paint & Painting Material shall be arranged by the contractor. Painting of02 No. 50 mm. wide Green/Yellow/Orange/Red strip & writing name of workshopand ^^fo|qr lEcU/kh f\"kdk;r gsrq Vksy Qzh ua0 1912 ij lEidZ djsaa**] Dragging of repaired T/F upto the test cabin /testing place and making full arrangement for the testing of transformer and their re-dragging to yard and its stacking at indentified place. |
| 16 | Daily cleaning of Workshop floor area, Open Shade and Open Area including the scrap material such as old paper, old pressboard, old cotton waste etc. (Wood dust, Sweeper, other required man power and T&P shall be arranged by the contractor). |
| 17 | 25 KVA Three Phase Alu. Wound (Workshop SACHAINDI (KANPUR NAGAR)) -Dragging, Shifting, Handling ofDamageTransformer from stacking yard to Dismantling area.Draining of Oil into pit/drum. Opening of top cover plate by T&P or cutting of sealed Transformer top cover plate by chisel Hammer Process, taking out the core and coil assembly from the tank. Removal of Old layers (Multilayers) of Top Cover Plate by welding/gas cutting after taking out the Tank at safe area. Dismantling core and coil assembly. Assembly of displaced core and cleaning of dust and dirt by cotton waste and wooden dust from every leaf of laminations if required(Welding/Brazing/Gas Cutting/Wooden Dust required for this work shall be arranged by the contractor). |
| 18 | Making of L.V. Coils as per original design/design approved by concern JE/AE (Using either new coil or reconditioning old coil as per technical conditions of old coil). |
| 19 | Making of HV Leg coils of same size and dimensions as old one or design approved by concern JE/AE (Using either new coil or reconditioning old coil as per technical conditions of old coil). |
| 20 | Assembly of core and coils and fitting of other parts requiring replacements such as press board etc. Making supports between adjacent section by insulation spacers barriers etc. and tapping etc (Brazing/Soldering required, shall be arranged by the contractor). Shifting and keeping the assembled core and coils etc. In OVENfrom the repairing and assembly place. |
| 21 | Cleaning of tank in cleaning yard.Repairing of burst body & radiator properly with welding including repairing of bended base channel.Painting of inner side of transformer tank and channels with heat proof zinc chromate paint of good quality.(Berger, Nerolac, Jenson & Necholson etc) Paint material shall be provided by contractor at his own cost. |
| 22 | Dragging out clean empty tank from yard to repairing hall. Taking out assembled core and coils assembly from the \"OVEN\" after proper megger value and shifting to repairing hall. (Meggar will be arranged by the contractor at his own cost.). Retanking ofcomplete assembly into painted tank andProper tightening of the assembly in the tank safely by using nut bolts and spring washer of good quality, Fitting of all accessories ofthe transformer including fixing of pressure release valve/vent pipe and filling of oil in transformer (Vent Pipe will be arranged by the contractor at his own cost.). Punching of unique no. on MS plate 100x50x3 mm. size & Welding of MS Plate on Transformer Body containing following information:- Uniqe Number, Capacity (MS Plate & Punching Machine shall be provided by contractor). |
| 23 | Refiting/Replacement/Fixing of HT Bushings. |
| 24 | Refiting/Replacement/Fixing of LT Bushings. |
| 25 | Refiting/Replacement/Fixing of HT Bushing Rods. |
| 26 | Refiting/Replacement/Fixing of LT Bushing Rods. |
| 27 | Refiting/Replacement/Fixing of HT Gasket/Oil Seal for all phase. |
| 28 | Refiting/Replacement/Fixing of LT Gasket/Oil Seal for all phase. |
| 29 | Refiting/Replacement/Fixing of Top Cover Plate Gasket with typing of top cover plate by using nut bolt & washer. |
| 30 | Refiting/Replacement/Fixing of Arching Horns/Breather. |
| 31 | Painting of T/F outside with super enemal synthetic paint in two coats after de-rusting and providing primer of red oxide paint etc.(color should be decided by EE WS) Paint & Painting Material shall be arranged by the contractor. Painting of02 No. 50 mm. wide Green/Yellow/Orange/Red strip & writing name of workshopand ^^fo|qr lEcU/kh f\"kdk;r gsrq Vksy Qzh ua0 1912 ij lEidZ djsaa**] Dragging of repaired T/F upto the test cabin /testing place and making full arrangement for the testing of transformer and their re-dragging to yard and its stacking at indentified place. |
| 32 | Daily cleaning of Workshop floor area, Open Shade and Open Area including the scrap material such as old paper, old pressboard, old cotton waste etc. (Wood dust, Sweeper, other required man power and T&P shall be arranged by the contractor). |
| 33 | 63 KVA Three Phase Alu. Wound (Workshop SACHAINDI (KANPUR NAGAR)) -Dragging, Shifting, Handling ofDamageTransformer from stacking yard to Dismantling area.Draining of Oil into pit/drum. Opening of top cover plate by T&P or cutting of sealed Transformer top cover plate by chisel Hammer Process, taking out the core and coil assembly from the tank. Removal of Old layers (Multilayers) of Top Cover Plate by welding/gas cutting after taking out the Tank at safe area. Dismantling core and coil assembly. Assembly of displaced core and cleaning of dust and dirt by cotton waste and wooden dust from every leaf of laminations if required(Welding/Brazing/Gas Cutting/Wooden Dust required for this work shall be arranged by the contractor). |
| 34 | Making of L.V. Coils as per original design/design approved by concern JE/AE (Using either new coil or reconditioning old coil as per technical conditions of old coil). |
| 35 | Making of HV Leg coils of same size and dimensions as old one or design approved by concern JE/AE (Using either new coil or reconditioning old coil as per technical conditions of old coil). |
| 36 | Assembly of core and coils and fitting of other parts requiring replacements such as press board etc. Making supports between adjacent section by insulation spacers barriers etc. and tapping etc (Brazing/Soldering required, shall be arranged by the contractor). Shifting and keeping the assembled core and coils etc. In OVENfrom the repairing and assembly place. |
| 37 | Cleaning of tank in cleaning yard.Repairing of burst body & radiator properly with welding including repairing of bended base channel.Painting of inner side of transformer tank and channels with heat proof zinc chromate paint of good quality.(Berger, Nerolac, Jenson & Necholson etc) Paint material shall be provided by contractor at his own cost. |
| 38 | Dragging out clean empty tank from yard to repairing hall. Taking out assembled core and coils assembly from the \"OVEN\" after proper megger value and shifting to repairing hall. (Meggar will be arranged by the contractor at his own cost.). Retanking ofcomplete assembly into painted tank andProper tightening of the assembly in the tank safely by using nut bolts and spring washer of good quality, Fitting of all accessories ofthe transformer including fixing of pressure release valve/vent pipe and filling of oil in transformer (Vent Pipe will be arranged by the contractor at his own cost.). Punching of unique no. on MS plate 100x50x3 mm. size & Welding of MS Plate on Transformer Body containing following information:- Uniqe Number, Capacity (MS Plate & Punching Machine shall be provided by contractor). |
| 39 | Refiting/Replacement/Fixing of HT Bushings. |
| 40 | Refiting/Replacement/Fixing of LT Bushings. |
| 41 | Refiting/Replacement/Fixing of HT Bushing Rods. |
| 42 | Refiting/Replacement/Fixing of LT Bushing Rods. |
| 43 | Refiting/Replacement/Fixing of HT Gasket/Oil Seal for all phase. |
| 44 | Refiting/Replacement/Fixing of LT Gasket/Oil Seal for all phase. |
| 45 | Refiting/Replacement/Fixing of Top Cover Plate Gasket with typing of top cover plate by using nut bolt & washer. |
| 46 | Refiting/Replacement/Fixing of Arching Horns/Breather. |
| 47 | Painting of T/F outside with super enemal synthetic paint in two coats after de-rusting and providing primer of red oxide paint etc.(color should be decided by EE WS) Paint & Painting Material shall be arranged by the contractor. Painting of02 No. 50 mm. wide Green/Yellow/Orange/Red strip & writing name of workshopand ^^fo|qr lEcU/kh f\"kdk;r gsrq Vksy Qzh ua0 1912 ij lEidZ djsaa**] Dragging of repaired T/F upto the test cabin /testing place and making full arrangement for the testing of transformer and their re-dragging to yard and its stacking at indentified place. |
| 48 | Daily cleaning of Workshop floor area, Open Shade and Open Area including the scrap material such as old paper, old pressboard, old cotton waste etc. (Wood dust, Sweeper, other required man power and T&P shall be arranged by the contractor). |
| 49 | 100 KVA Three Phase Alu./Cu. Wound (Workshop SACHAINDI (KANPUR NAGAR)) -Dragging, Shifting, Handling ofDamageTransformer from stacking yard to Dismantling area.Draining of Oil into pit/drum. Opening of top cover plate by T&P or cutting of sealed Transformer top cover plate by chisel Hammer Process, taking out the core and coil assembly from the tank. Removal of Old layers (Multilayers) of Top Cover Plate by welding/gas cutting after taking out the Tank at safe area. Dismantling core and coil assembly. Assembly of displaced core and cleaning of dust and dirt by cotton waste and wooden dust from every leaf of laminations if required(Welding/Brazing/Gas Cutting/Wooden Dust required for this work shall be arranged by the contractor). |
| 50 | Making of L.V. Coils as per original design/design approved by concern JE/AE (Using either new coil or reconditioning old coil as per technical conditions of old coil). |
| 51 | Making of HV Leg coils of same size and dimensions as old one or design approved by concern JE/AE (Using either new coil or reconditioning old coil as per technical conditions of old coil). |
| 52 | Assembly of core and coils and fitting of other parts requiring replacements such as press board etc. Making supports between adjacent section by insulation spacers barriers etc. and tapping etc (Brazing/Soldering required, shall be arranged by the contractor). Shifting and keeping the assembled core and coils etc. In OVENfrom the repairing and assembly place. |
| 53 | Cleaning of tank in cleaning yard.Repairing of burst body & radiator properly with welding including repairing of bended base channel.Painting of inner side of transformer tank and channels with heat proof zinc chromate paint of good quality.(Berger, Nerolac, Jenson & Necholson etc) Paint material shall be provided by contractor at his own cost. |
| 54 | Dragging out clean empty tank from yard to repairing hall. Taking out assembled core and coils assembly from the \"OVEN\" after proper megger value and shifting to repairing hall. (Meggar will be arranged by the contractor at his own cost.). Retanking ofcomplete assembly into painted tank andProper tightening of the assembly in the tank safely by using nut bolts and spring washer of good quality, Fitting of all accessories ofthe transformer including fixing of pressure release valve/vent pipe and filling of oil in transformer (Vent Pipe will be arranged by the contractor at his own cost.). Punching of unique no. on MS plate 100x50x3 mm. size & Welding of MS Plate on Transformer Body containing following information:- Uniqe Number, Capacity (MS Plate & Punching Machine shall be provided by contractor). |
| 55 | Refiting/Replacement/Fixing of HT Bushings. |
| 56 | Refiting/Replacement/Fixing of LT Bushings. |
| 57 | Refiting/Replacement/Fixing of HT Bushing Rods. |
| 58 | Refiting/Replacement/Fixing of LT Bushing Rods. |
| 59 | Refiting/Replacement/Fixing of HT Gasket/Oil Seal for all phase. |
| 60 | Refiting/Replacement/Fixing of LT Gasket/Oil Seal for all phase. |
| 61 | Refiting/Replacement/Fixing of Top Cover Plate Gasket with typing of top cover plate by using nut bolt & washer. |
| 62 | Refiting/Replacement/Fixing of Arching Horns/Breather. |
| 63 | Painting of T/F outside with super enemal synthetic paint in two coats after de-rusting and providing primer of red oxide paint etc.(color should be decided by EE WS) Paint & Painting Material shall be arranged by the contractor. Painting of02 No. 50 mm. wide Green/Yellow/Orange/Red strip & writing name of workshopand ^^fo|qr lEcU/kh f\"kdk;r gsrq Vksy Qzh ua0 1912 ij lEidZ djsaa**] Dragging of repaired T/F upto the test cabin /testing place and making full arrangement for the testing of transformer and their re-dragging to yard and its stacking at indentified place. |
| 64 | Daily cleaning of Workshop floor area, Open Shade and Open Area including the scrap material such as old paper, old pressboard, old cotton waste etc. (Wood dust, Sweeper, other required man power and T&P shall be arranged by the contractor). |
| 65 | 160 KVA Three Phase Alu. Wound (Workshop SACHAINDI (KANPUR NAGAR)) -Dragging, Shifting, Handling ofDamageTransformer from stacking yard to Dismantling area.Draining of Oil into pit/drum. Opening of top cover plate by T&P or cutting of sealed Transformer top cover plate by chisel Hammer Process, taking out the core and coil assembly from the tank. Dismantling core and coil assembly. Assembly of displaced core and cleaning of dust and dirt by cotton waste and wooden dust from every leaf of laminations if required(Welding/Brazing/Gas Cutting/Wooden Dust required for this work shall be arranged by the contractor). |
| 66 | Making of L.V. Coils as per original design/design approved by concern JE/AE (Using either new coil or reconditioning old coil as per technical conditions of old coil). |
| 67 | Making of HV Leg coils of same size and dimensions as old one or design approved by concern JE/AE (Using either new coil or reconditioning old coil as per technical conditions of old coil). |
| 68 | Assembly of core and coils and fitting of other parts requiring replacements such as press board etc. Making supports between adjacent section by insulation spacers barriers etc. and tapping etc (Brazing/Soldering required, shall be arranged by the contractor). Shifting and keeping the assembled core and coils etc. In OVENfrom the repairing and assembly place. |
| 69 | Cleaning of tank in cleaning yard.Repairing of burst body & radiator properly with welding including repairing of bended base channel.Painting of inner side of transformer tank and channels with heat proof zinc chromate paint of good quality.(Berger, Nerolac, Jenson & Necholson etc) Paint material shall be provided by contractor at his own cost. |
| 70 | Dragging out clean empty tank from yard to repairing hall. Taking out assembled core and coils assembly from the \"OVEN\" after proper megger value and shifting to repairing hall. (Meggar will be arranged by the contractor at his own cost.). Retanking ofcomplete assembly into painted tank andProper tightening of the assembly in the tank safely by using nut bolts and spring washer of good quality, Fitting of all accessories ofthe transformer including fixing of pressure release valve/vent pipe and filling of oil in transformer (Vent Pipe will be arranged by the contractor at his own cost.). Punching of unique no. on MS plate 100x50x3 mm. size & Welding of MS Plate on Transformer Body containing following information:- Uniqe Number, Capacity (MS Plate & Punching Machine shall be provided by contractor). |
| 71 | Refiting/Replacement/Fixing of HT Bushings. |
| 72 | Refiting/Replacement/Fixing of LT Bushings. |
| 73 | Refiting/Replacement/Fixing of HT Bushing Rods. |
| 74 | Refiting/Replacement/Fixing of LT Bushing Rods. |
| 75 | Refiting/Replacement/Fixing of HT Gasket/Oil Seal for all phase. |
| 76 | Refiting/Replacement/Fixing of LT Gasket/Oil Seal for all phase. |
| 77 | Refiting/Replacement/Fixing of Top Cover Plate Gasket with typing of top cover plate by using nut bolt & washer. |
| 78 | Refiting/Replacement/Fixing of Arching Horns/Breather. |
| 79 | Painting of T/F outside with super enemal synthetic paint in two coats after de-rusting and providing primer of red oxide paint etc.(color should be decided by EE WS) Paint & Painting Material shall be arranged by the contractor. Painting of02 No. 50 mm. wide Green/Yellow/Orange/Red strip & writing name of workshopand ^^fo|qr lEcU/kh f\"kdk;r gsrq Vksy Qzh ua0 1912 ij lEidZ djsaa**] Dragging of repaired T/F upto the test cabin /testing place and making full arrangement for the testing of transformer and their re-dragging to yard and its stacking at indentified place. |
| 80 | Daily cleaning of Workshop floor area, Open Shade and Open Area including the scrap material such as old paper, old pressboard, old cotton waste etc. (Wood dust, Sweeper, other required man power and T&P shall be arranged by the contractor). |
| 81 | 250 KVA Three Phase Alu./Cu. Wound (Workshop SACHAINDI (KANPUR NAGAR)) -Dragging, Shifting, Handling ofDamageTransformer from stacking yard to Dismantling area.Draining of Oil into pit/drum. Opening of top cover plate by T&P or cutting of sealed Transformer top cover plate by chisel Hammer Process, taking out the core and coil assembly from the tank. Dismantling core and coil assembly. Assembly of displaced core and cleaning of dust and dirt by cotton waste and wooden dust from every leaf of laminations if required(Welding/Brazing/Gas Cutting/Wooden Dust required for this work shall be arranged by the contractor). |
| 82 | Making of L.V. Coils as per original design/design approved by concern JE/AE (Using either new coil or reconditioning old coil as per technical conditions of old coil). |
| 83 | Making of HV Leg coils of same size and dimensions as old one or design approved by concern JE/AE (Using either new coil or reconditioning old coil as per technical conditions of old coil). |
| 84 | Assembly of core and coils and fitting of other parts requiring replacements such as press board etc. Making supports between adjacent section by insulation spacers barriers etc. and tapping etc (Brazing/Soldering required, shall be arranged by the contractor). Shifting and keeping the assembled core and coils etc. In OVENfrom the repairing and assembly place. |
| 85 | Cleaning of tank in cleaning yard.Repairing of burst body & radiator properly with welding including repairing of bended base channel.Painting of inner side of transformer tank and channels with heat proof zinc chromate paint of good quality.(Berger, Nerolac, Jenson & Necholson etc) Paint material shall be provided by contractor at his own cost. |
| 86 | Dragging out clean empty tank from yard to repairing hall. Taking out assembled core and coils assembly from the \"OVEN\" after proper megger value and shifting to repairing hall. (Meggar will be arranged by the contractor at his own cost.). Retanking ofcomplete assembly into painted tank andProper tightening of the assembly in the tank safely by using nut bolts and spring washer of good quality, Fitting of all accessories ofthe transformer including fixing of pressure release valve/vent pipe and filling of oil in transformer (Vent Pipe will be arranged by the contractor at his own cost.). Punching of unique no. on MS plate 100x50x3 mm. size & Welding of MS Plate on Transformer Body containing following information:- Uniqe Number, Capacity (MS Plate & Punching Machine shall be provided by contractor). |
| 87 | Refiting/Replacement/Fixing of HT Bushings. |
| 88 | Refiting/Replacement/Fixing of LT Bushings. |
| 89 | Refiting/Replacement/Fixing of HT Bushing Rods. |
| 90 | Refiting/Replacement/Fixing of LT Bushing Rods. |
| 91 | Refiting/Replacement/Fixing of HT Gasket/Oil Seal for all phase. |
| 92 | Refiting/Replacement/Fixing of LT Gasket/Oil Seal for all phase. |
| 93 | Refiting/Replacement/Fixing of Top Cover Plate Gasket with typing of top cover plate by using nut bolt & washer. |
| 94 | Refiting/Replacement/Fixing of Arching Horns/Breather. |
| 95 | Painting of T/F outside with super enemal synthetic paint in two coats after de-rusting and providing primer of red oxide paint etc.(color should be decided by EE WS) Paint & Painting Material shall be arranged by the contractor. Painting of02 No. 50 mm. wide Green/Yellow/Orange/Red strip & writing name of workshopand ^^fo|qr lEcU/kh f\"kdk;r gsrq Vksy Qzh ua0 1912 ij lEidZ djsaa**] Dragging of repaired T/F upto the test cabin /testing place and making full arrangement for the testing of transformer and their re-dragging to yard and its stacking at indentified place. |
| 96 | Daily cleaning of Workshop floor area, Open Shade and Open Area including the scrap material such as old paper, old pressboard, old cotton waste etc. (Wood dust, Sweeper, other required man power and T&P shall be arranged by the contractor). |
| 97 | 400 KVA Three Phase Cu. Wound (Workshop SACHAINDI (KANPUR NAGAR)) -Dragging, Shifting, Handling ofDamageTransformer from stacking yard to Dismantling area.Draining of Oil into pit/drum. Opening of top cover plate by T&P or cutting of sealed Transformer top cover plate by chisel Hammer Process, taking out the core and coil assembly from the tank. Dismantling core and coil assembly. Assembly of displaced core and cleaning of dust and dirt by cotton waste and wooden dust from every leaf of laminations if required(Welding/Brazing/Gas Cutting/Wooden Dust required for this work shall be arranged by the contractor). |
| 98 | Making of L.V. Coils as per original design/design approved by concern JE/AE (Using either new coil or reconditioning old coil as per technical conditions of old coil). |
| 99 | Making of HV Leg coils of same size and dimensions as old one or design approved by concern JE/AE (Using either new coil or reconditioning old coil as per technical conditions of old coil). |
| 100 | Assembly of core and coils and fitting of other parts requiring replacements such as press board etc. Making supports between adjacent section by insulation spacers barriers etc. and tapping etc (Brazing/Soldering required, shall be arranged by the contractor). Shifting and keeping the assembled core and coils etc. In OVENfrom the repairing and assembly place. |
| 101 | Cleaning of tank in cleaning yard.Repairing of burst body & radiator properly with welding including repairing of bended base channel.Painting of inner side of transformer tank and channels with heat proof zinc chromate paint of good quality.(Berger, Nerolac, Jenson & Necholson etc) Paint material shall be provided by contractor at his own cost. |
| 102 | Dragging out clean empty tank from yard to repairing hall. Taking out assembled core and coils assembly from the \"OVEN\" after proper megger value and shifting to repairing hall. (Meggar will be arranged by the contractor at his own cost.). Retanking ofcomplete assembly into painted tank andProper tightening of the assembly in the tank safely by using nut bolts and spring washer of good quality, Fitting of all accessories ofthe transformer including fixing of pressure release valve/vent pipe and filling of oil in transformer (Vent Pipe will be arranged by the contractor at his own cost.). Punching of unique no. on MS plate 100x50x3 mm. size & Welding of MS Plate on Transformer Body containing following information:- Uniqe Number, Capacity (MS Plate & Punching Machine shall be provided by contractor). |
| 103 | Refiting/Replacement/Fixing of HT Bushings. |
| 104 | Refiting/Replacement/Fixing of LT Bushings. |
| 105 | Refiting/Replacement/Fixing of HT Bushing Rods. |
| 106 | Refiting/Replacement/Fixing of LT Bushing Rods. |
| 107 | Refiting/Replacement/Fixing of HT Gasket/Oil Seal for all phase. |
| 108 | Refiting/Replacement/Fixing of LT Gasket/Oil Seal for all phase. |
| 109 | Refiting/Replacement/Fixing of Top Cover Plate Gasket with typing of top cover plate by using nut bolt & washer. |
| 110 | Refiting/Replacement/Fixing of Arching Horns/Breather. |
| 111 | Painting of T/F outside with super enemal synthetic paint in two coats after de-rusting and providing primer of red oxide paint etc.(color should be decided by EE WS) Paint & Painting Material shall be arranged by the contractor. Painting of02 No. 50 mm. wide Green/Yellow/Orange/Red strip & writing name of workshopand ^^fo|qr lEcU/kh f\"kdk;r gsrq Vksy Qzh ua0 1912 ij lEidZ djsaa**] Dragging of repaired T/F upto the test cabin /testing place and making full arrangement for the testing of transformer and their re-dragging to yard and its stacking at indentified place. |
| 112 | Daily cleaning of Workshop floor area, Open Shade and Open Area including the scrap material such as old paper, old pressboard, old cotton waste etc. (Wood dust, Sweeper, other required man power and T&P shall be arranged by the contractor). |
| 113 | 630 KVA Three Phase Cu. Wound (Workshop SACHAINDI (KANPUR NAGAR)) -Dragging, Shifting, Handling ofDamageTransformer from stacking yard to Dismantling area.Draining of Oil into pit/drum. Opening of top cover plate by T&P or cutting of sealed Transformer top cover plate by chisel Hammer Process, taking out the core and coil assembly from the tank. Dismantling core and coil assembly. Assembly of displaced core and cleaning of dust and dirt by cotton waste and wooden dust from every leaf of laminations if required(Welding/Brazing/Gas Cutting/Wooden Dust required for this work shall be arranged by the contractor). |
| 114 | Making of L.V. Coils as per original design/design approved by concern JE/AE (Using either new coil or reconditioning old coil as per technical conditions of old coil). |
| 115 | Making of HV Leg coils of same size and dimensions as old one or design approved by concern JE/AE (Using either new coil or reconditioning old coil as per technical conditions of old coil). |
| 116 | Assembly of core and coils and fitting of other parts requiring replacements such as press board etc. Making supports between adjacent section by insulation spacers barriers etc. and tapping etc (Brazing/Soldering required, shall be arranged by the contractor). Shifting and keeping the assembled core and coils etc. In OVENfrom the repairing and assembly place. |
| 117 | Cleaning of tank in cleaning yard.Repairing of burst body & radiator properly with welding including repairing of bended base channel.Painting of inner side of transformer tank and channels with heat proof zinc chromate paint of good quality.(Berger, Nerolac, Jenson & Necholson etc) Paint material shall be provided by contractor at his own cost. |
| 118 | Dragging out clean empty tank from yard to repairing hall. Taking out assembled core and coils assembly from the \"OVEN\" after proper megger value and shifting to repairing hall. (Meggar will be arranged by the contractor at his own cost.). Retanking ofcomplete assembly into painted tank andProper tightening of the assembly in the tank safely by using nut bolts and spring washer of good quality, Fitting of all accessories ofthe transformer including fixing of pressure release valve/vent pipe and filling of oil in transformer (Vent Pipe will be arranged by the contractor at his own cost.). Punching of unique no. on MS plate 100x50x3 mm. size & Welding of MS Plate on Transformer Body containing following information:- Uniqe Number, Capacity (MS Plate & Punching Machine shall be provided by contractor). |
| 119 | Refiting/Replacement/Fixing of HT Bushings. |
| 120 | Refiting/Replacement/Fixing of LT Bushings. |
| 121 | Refiting/Replacement/Fixing of HT Bushing Rods. |
| 122 | Refiting/Replacement/Fixing of LT Bushing Rods. |
| 123 | Refiting/Replacement/Fixing of HT Gasket/Oil Seal for all phase. |
| 124 | Refiting/Replacement/Fixing of LT Gasket/Oil Seal for all phase. |
| 125 | Refiting/Replacement/Fixing of Top Cover Plate Gasket with typing of top cover plate by using nut bolt & washer. |
| 126 | Refiting/Replacement/Fixing of Arching Horns/Breather. |
| 127 | Painting of T/F outside with super enemal synthetic paint in two coats after de-rusting and providing primer of red oxide paint etc.(color should be decided by EE WS) Paint & Painting Material shall be arranged by the contractor. Painting of02 No. 50 mm. wide Green/Yellow/Orange/Red strip & writing name of workshopand ^^fo|qr lEcU/kh f\"kdk;r gsrq Vksy Qzh ua0 1912 ij lEidZ djsaa**] Dragging of repaired T/F upto the test cabin /testing place and making full arrangement for the testing of transformer and their re-dragging to yard and its stacking at indentified place. |
| 128 | Daily cleaning of Workshop floor area, Open Shade and Open Area including the scrap material such as old paper, old pressboard, old cotton waste etc. (Wood dust, Sweeper, other required man power and T&P shall be arranged by the contractor). |
| 129 | 1000 KVA Three Phase Cu. Wound (Workshop SACHAINDI (KANPUR NAGAR)) -Dragging, Shifting, Handling ofDamageTransformer from stacking yard to Dismantling area.Draining of Oil into pit/drum. Opening of top cover plate by T&P or cutting of sealed Transformer top cover plate by chisel Hammer Process, taking out the core and coil assembly from the tank. Dismantling core and coil assembly. Assembly of displaced core and cleaning of dust and dirt by cotton waste and wooden dust from every leaf of laminations if required(Welding/Brazing/Gas Cutting/Wooden Dust required for this work shall be arranged by the contractor). |
| 130 | Making of L.V. Coils as per original design/design approved by concern JE/AE (Using either new coil or reconditioning old coil as per technical conditions of old coil). |
| 131 | Making of HV Leg coils of same size and dimensions as old one or design approved by concern JE/AE (Using either new coil or reconditioning old coil as per technical conditions of old coil). |
| 132 | Assembly of core and coils and fitting of other parts requiring replacements such as press board etc. Making supports between adjacent section by insulation spacers barriers etc. and tapping etc (Brazing/Soldering required, shall be arranged by the contractor). Shifting and keeping the assembled core and coils etc. In OVENfrom the repairing and assembly place. |
| 133 | Cleaning of tank in cleaning yard.Repairing of burst body & radiator properly with welding including repairing of bended base channel.Painting of inner side of transformer tank and channels with heat proof zinc chromate paint of good quality.(Berger, Nerolac, Jenson & Necholson etc) Paint material shall be provided by contractor at his own cost. |
| 134 | Dragging out clean empty tank from yard to repairing hall. Taking out assembled core and coils assembly from the \"OVEN\" after proper megger value and shifting to repairing hall. (Meggar will be arranged by the contractor at his own cost.). Retanking ofcomplete assembly into painted tank andProper tightening of the assembly in the tank safely by using nut bolts and spring washer of good quality, Fitting of all accessories ofthe transformer including fixing of pressure release valve/vent pipe and filling of oil in transformer (Vent Pipe will be arranged by the contractor at his own cost.). Punching of unique no. on MS plate 100x50x3 mm. size & Welding of MS Plate on Transformer Body containing following information:- Uniqe Number, Capacity (MS Plate & Punching Machine shall be provided by contractor). |
| 135 | Refiting/Replacement/Fixing of HT Bushings. |
| 136 | Refiting/Replacement/Fixing of LT Bushings. |
| 137 | Refiting/Replacement/Fixing of HT Bushing Rods. |
| 138 | Refiting/Replacement/Fixing of LT Bushing Rods. |
| 139 | Refiting/Replacement/Fixing of HT Gasket/Oil Seal for all phase. |
| 140 | Refiting/Replacement/Fixing of LT Gasket/Oil Seal for all phase. |
| 141 | Refiting/Replacement/Fixing of Top Cover Plate Gasket with typing of top cover plate by using nut bolt & washer. |
| 142 | Refiting/Replacement/Fixing of Arching Horns/Breather. |
| 143 | Painting of T/F outside with super enemal synthetic paint in two coats after de-rusting and providing primer of red oxide paint etc.(color should be decided by EE WS) Paint & Painting Material shall be arranged by the contractor. Painting of02 No. 50 mm. wide Green/Yellow/Orange/Red strip & writing name of workshopand ^^fo|qr lEcU/kh f\"kdk;r gsrq Vksy Qzh ua0 1912 ij lEidZ djsaa**] Dragging of repaired T/F upto the test cabin /testing place and making full arrangement for the testing of transformer and their re-dragging to yard and its stacking at indentified place. |
| 144 | Daily cleaning of Workshop floor area, Open Shade and Open Area including the scrap material such as old paper, old pressboard, old cotton waste etc. (Wood dust, Sweeper, other required man power and T&P shall be arranged by the contractor). |
Copyright © 2025 · All Rights Reserved. Terms of Usage | Privacy Policy