}

Work To Be Done Under Deposit Scheme Head Against Various Packages Approved Under Electricity Distribution Section Ii, Etawah - Carriage Of Pcc Pole From Store Center Kunera Etawah To Site Of Work Through The Kacha And Pakka Road Including The Work Of Its, etawah-Uttar Pradesh

Dakshinanchal Vidyut Vitran Nigam Limited has published Work To Be Done Under Deposit Scheme Head Against Various Packages Approved Under Electricity Distribution Section Ii, Etawah - Carriage Of Pcc Pole From Store Center Kunera Etawah To Site Of Work Through The Kacha And Pakka Road Including The Work Of Its. Submission Date for this Tender is 02-05-2025. Power Distribution Work Tenders in etawah Uttar Pradesh. Bidders can get complete Tender details and download the document.




Tender Notice

48850400
Work To Be Done Under Deposit Scheme Head Against Various Packages Approved Under Electricity Distribution Section Ii, Etawah - Carriage Of Pcc Pole From Store Center Kunera Etawah To Site Of Work Through The Kacha And Pakka Road Including The Work Of Its
Open Tender
Indian
Uttar Pradesh
Etawah
02-05-2025

Tender Documents

Tender Details

Work To Be Done Under Deposit Scheme Head Against Various Packages Approved Under Electricity Distribution Section Ii, Etawah - Carriage of PCC pole from Store Center Kunera Etawah to site of work through the Kacha and Pakka road including the work of its loading and unloading at the respective ends including the cost of arrangement of labour, T&P, carrier etc. required for proper completion of work. 2 ST 11 Mtr. Long/PCC 8.5 Mtr. Long Pole 3 Line material i.e. conductor, G.I. wire TPMO stay rod, disc insulator, cross arm, Angle channel, Different type of Clamps and other required material 4 ACSR Weasel Conductor 5 11 Kv XLPE HT Cable 3x70 Sqmm 6 Erection Grouting, Concreting and plinting of single support on PCC Pole 8.5 Mtr. Long with cement, coarse sand & stone ballast duly grouted including necessories clamps, accessories required fixing of HT/LT fittings as per Resspo norms. The support shall be grouted in cement, sand and brick ballast. It including the cost of all labour, T&P etc. required for proper completion of work. 7 Erection Grouting, Concreting and plinting of Double Pole with cement, coarse sand & stone ballast duly grouted including necessories clamps, accessories required fixing of HT/LT fittings as per Resspo norms. The support shall be grouted in cement, sand and brick ballast. It including the cost of all labour, T&P etc. required for proper completion of work. 8 Laying, sagging, stringing, binding & jumpering of ACSR Weasel Conductor on the newly erected pole asperRESPOmanualandasperdirectionofsupervising engineer,includingthecostofarrangementoflabour,T&P carrier etc. required for proper completion of work. 9 Erection and grouting of staycomplete including the work of nozzling etc. as per RESPO manual and also including the cost of arrangement of allgrouting material, labour, T&P etc. required for proper completion of work as per RESSPO Manual. 10 Fixing &connectingofEarthingRods as perRESSPOManual includingthecostoflabour,T&Petc.requiredforproper completion of work. 11 Safecarriageof11 Kv CT/PT Pole MountingUnitanditsproper installationondoublepooleafterfixingofchannelwithM.S. clamps and nuts & bolts for holding the channel angle etc. The unitbodyshallbeearthedbyconnectingM.S.Stripofsutaible size finallyconnectedtoearthingrod.11 KVline shall be connected to unit as per instructions of SDO. The M.S. Strip & earth rod shall be included in the scope of work. 12 Safecarriageof11 Kv Pilfer Resistant Metering Cubical anditsproper installationondoublepooleafterfixingofchannelwithM.S. clamps and nuts & bolts for holding the channel angle etc. The unitbodyshallbeearthedbyconnectingM.S.Stripofsutaible size finallyconnectedtoearthingrod.11 KVline shall be connected to unit as per instructions of SDO. The M.S. Strip & earth rod shall be included in the scope of work. 13 Digging, laying and back filling of 3X70 Sqmm XLPE cable including the cost of Cable hoisting and making loops/ HDPE pipe/clamps as per RESPO manual and as per direction of supervising engineer including the cost of arrangementof brick, sand, labour and T&P etc. required for proper completion of the work. 14 Filling Of 11 Kv Heat Shrinkable Cable Jointing Kit (Indoor/Outdoor Type) Suitable for XLPE 3x120 Sqmm with Supply. (including the cost arrangement of labour, T&P, carrier etc. required for proper completion of work) 15 Installation & Fixing of following accessories. includingthecostoflabour, T&P and carrier etc. required for proper completion of work. 16 Cable Connecting Clamp made of All. 240 Sqmm 17 11 Kv X Arm Clamp 18 Danger Board 19 Stone Pad 20 Holding Clamp 21 Dropper Channel 22 Top Channel 23 Nut Bolt with Washer off Size 24 T/F Base Angle

Key Value

Document Fees
INR 1180 /-
EMD
INR 1590.0 /-
Tender Value
Refer document

Attachment

FileName File Description File Size
Click here to download tender document Tender Documents 0 KB
Click here to download tender document Tender Documents 0 KB
Click here to download tender document Tender Documents 0 KB
Click here to download tender document Tender Documents 0 KB
Disclaimer :
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.
Tell us about your Product / Services,
We will Find Tenders for you

Copyright © 2025 · All Rights Reserved. Terms of Usage | Privacy Policy

For Tender Information Services Visit : TenderDetail