| 1 | Repairing of leakage in existing Distribution/Rising Main/ Transmission Main AC/PVC/HDPE pipe line up to 1.5 mtr depth of sizes as given bewlo by digging out suitable size of pit at site of work including dewatering and providing adequate safety arrangement at site. This will also include cutting of pipe end, fixing of pipe piece with jointing material to make repair leak proof and then refill the pit from excavated sand by ramming it at sides of pipe & up to ground level for entire job contractor will use his own T&P & labour and will arrange transportation of material required form store. (Required material such as pipe piece, CID Joints shall be provided by Department free of cost) in all type soil AC/PVC/HDPE pipe 50/63/75 mm |
| 2 | 80/90 mm |
| 3 | 100/110 mm |
| 4 | 125/140 mm |
| 5 | 150/160/180 mm |
| 6 | 200/225 mm |
| 7 | 250/280 mm |
| 8 | 300/315 mm |
| 9 | Add on above item no. 1 for B.T. Road |
| 10 | Add on above item no. 1 for C.C. Road |
| 11 | Add on above no. 1 item if depth of pipeline is above 1.5 mtr and up to 3.0 mtr |
| 12 | Minor repair of leakages such as lead caulking, plugging, clamping and ring fixing in existing, distribution/Rising Main/Transmission Main AC/PVC/HDPE/CI/MS/DI pipe line up to 1.5 Mtr depth of sizes as given below by digging out suitalbe size of pit at site of work including dewatering and providing adequate safety arrangement at site to maek repair leak proof and then refill the pit from excavated snad by ramming it at sides of pipe & upto ground level for entire job contractor will use his own T&P & labour and will arrange transportation of required mateiral from store. (Required material such as lead wool, white hump, plugs, clamps etc. shall be provided by Department free of cost.) n all type soil 50/63/75 mm |
| 13 | 80/90 mm |
| 14 | 100/110 mm |
| 15 | 125/140 mm |
| 16 | 150/160/180 mm |
| 17 | 200/225 mm |
| 18 | 250/280 mm |
| 19 | 300/315 mm |
| 20 | Add on above item no. 12 for B.T. Road |
| 21 | Add on above item no. 12 for C.C. Road |
| 22 | Add on above no. 12 item if depth of pipeline is above 1.5 mtr and up to 3.0 mtr |
| 23 | Replacement of CI/DI double flange sluice valves, non return valves, butter fly valves etc. in existing Distribution/Rising main/ Transmission Main pipe line up to 1.5 mtr depth of sizes as given below by digging out suitable size of pit at site of work including providing and fixing MS Nut and Bolt and rubber gasket, dewatering and providing adequate safety arrangment at site and then refill the pit from excavated sand by ramming it at sides of pipe & upto ground level for entire job contractor will use his own T&P & labour and will arrange transportation of required mateiral from store. (Required material such as Valve, Tail piece, CID joints etc. shall be provided by Department free of cost.) In all type Soil 80 mm |
| 24 | 100 mm |
| 25 | 125 mm |
| 26 | 150 mm |
| 27 | 200 mm |
| 28 | 250 mm |
| 29 | Add on above item no. 23 for B.T. Road |
| 30 | Add on above item no. 23 for C.C. Road |
| 31 | Add on above no. 23 item if depth of pipeline is above 1.5 mtr and up to 3.0 mtr |
| 32 | Removal of choking from pipe line, including tree roots, malba, sand and other by manually or other means, cleaning of line and testing in existing Distribution/Rising Main/Transmission Main AC/PVC/HdPE/uPVC pipe line up to 1.5 mtr depth of sizes as given below by digging out suitable size of pit at site of work including dewatering and providing adequate safety arrangement at site. This will also include cutting of pipe ends, fixing of pipe piece with jointing material and then refill the pit from excavated sand by ramming it at sides of pipe & up to ground level for entire job contractor will use his own T&P & labour and will arrange transportation of required material from store. (Required material such as pipe piece CID joints shall be provided by Deparment free of cost) as per satisfaction of EIC. Rates for per pit In all typer soil 75 mm |
| 33 | 90/80 mm |
| 34 | 110/100 mm |
| 35 | 140/125 mm |
| 36 | 180/160/150 mm |
| 37 | 225/200 mm |
| 38 | 250 mm |
| 39 | 300 mm |
| 40 | Add on above item no. 32 for B.T. Road |
| 41 | Add on above item no. 32 for C.C. Road |
| 42 | Add on above no. 32 item if depth of pipeline is above 1.5 mtr and up to 3.0 mtr |
| 43 | Restoration of bitumen road by patch work of WBM using crushed / broken aggregate as per the standard specification and consolidation with hand rammer spreading and consolidation of binding material , cleaning of surface of WBM and providing of seal &tack coat as per site condition by using ready cold mixup to the satisfaction of engineer in charge.The rate includes the makingof pit in regular shape, all labour, material and T&P charge complete job. |
| 44 | Restoration of cement concreteroad including making of pit in regular shape, ramming and consolidation of surface, laying, positioning and compactingcement concrete ( M-20 ) minimum thickness 200 mm upto the satisfaction ofengineer incharge.The rate includes the makingof pit in regular shape, all labour, material and T&P charge complete job. |
| 45 | Disconnection of water connection from existing pipe line in all type of soils up to 1.5 mtr depth by digging out suitable size of pit at site fo work, with cutting of service line and refixing of clamp revolving it 180 degree refill the pit from excavated sand by ramming it & up to ground level for entire job contractor will use his own T&P & labour. |
| 46 | Work of Inter Connection in AC/PVC/HDPE pipe line up to 1.5 mtr depth by digging out suitable size of pit at site of work including dewatering and providing adequate safety arrangement at site, cutting of existing pipeline, jointing of Tee (complete) and other specials to make inter connection repair leak proof and then refill the pit from excavated sand by ramming it at sides of pipe &upto ground level for entire job contractor will use his own T&P &labour and will arrange transportation of material required from store. (Material such as Tee/ Tee Clamp/rubber sheet/ CID joints required for inter connection shall be provided by the department free of cost). In all type Soil80 mm to 110 mm |
| 47 | 125 mm to 165 mm |
| 48 | 200 mm to 300 mm |
| 49 | Add on above item no. 46 for B.T. Road |
| 50 | Add on above item no. 46 for CC Road |