| 1 | Safe carriage of 8.5 mtr. long PCC pole from store center Mahoba/nearest 33/11 KV S/S to direct pit site in distance range 0 to 70 Km. including loading & unloading at both ends. |
| 2 | Safe carriage of11/13 mtr STPfrom store center Mahoba/nearest 33/11 KV S/S to direct pit site in distance range 0 to 70 Km. including loading & unloading at both ends. |
| 3 | Safe carriage of9 mtr STPfrom store center Mahoba/nearest 33/11 KV S/S to direct pit site in distance range 0 to 70 Km. including loading & unloading at both ends. |
| 4 | Safe carriage of line material from store center Mahoba/nearest substation to pit site in distance range 0 to 70 Km. including loading & unloading at both ends. |
| 5 | Opening of binding & removal of following conductor with 33 KV/HT/LT line from broken PCC poles/rails/ STP and stacking at safer place. |
| 6 | 1- Dog/ Raccoon/ Rabbit conductor |
| 7 | 2- AAAC/ACSR weasel conductor/ GI wire. |
| 8 | 3- ABC 3X95+1X35+1X16/3x50mm |
| 9 | 4- ABC 3x120+1x70+1x16 |
| 10 | Erection of 8.5 mtr. long PCC poles as single support including fixing of all HT/LT accessories etc. complete.Pole should be grouted properly as per DVVNL/RESPO normes |
| 11 | Erection of 9 mtr. STP as single support including fixing of all HT/LT accessories etc. complete.Pole should be grouted properly as per DVVNL/RESPO normes |
| 12 | Errection of 11/13 mtr.STP as single support including fixing of all HT/LT accessories etc. complete.Pole should be grouted properly as per DVVNL/RESPO normes |
| 13 | Errection of 8.5 mtr. long PCC poles as Double Pole/ section pole including drilling,cutting etc. andfixing of all accessories etc. complete. |
| 14 | Errection of 11mtr. STP as Double Pole/ section pole including drilling,cutting etc. andfixing of all accessories etc. complete. |
| 15 | Laying stringing & sagging of 3 phase 3 wire 33/HT/LT line with following condudctor including binding & nozzling. |
| 16 | 1- Dog/ Rabbit conductor |
| 17 | 2- AAAC/ACSR weasel conductor/ GI wire. |
| 18 | 3-ABC 3*95 mm/3*50 mm |
| 19 | 4- ABC 3x120+1x70+1x16 |
| 20 | Straightening of tilted PCC poles/ST P/Railsingle support of HT/LT line after opening of nuzzling, digging of pit applying anti direction force for making of proper alignment of line. |
| 21 | Straightening of tilted D/P after opening of connection applying anti direction force, digging of dug for proper alignment of line including reconnection etc. complete. |
| 22 | Re-sagging of loose 33/HT/LT conductor after opening, binding, nozzling etc. |
| 23 | 1- Dog/ Rabbit conductor |
| 24 | 2- AAAC/ACSR weasel conductor/ GI wire. |
| 25 | 3- ABC 3X120+1X70+1X16 |
| 26 | 4-ABC 3X95+1X35+1X16 |
| 27 | 5-ABC 3X50+1X35+1X16 |
| 28 | Replacement of following broken/damaged/missing accessories by new accessories including opening of the same and refixing. |
| 29 | 1-11 KV cross arms V type |
| 30 | 2-11 KV pin insulator |
| 31 | 3-11 KV pin with nut |
| 32 | 4-11 KV Disc insulator |
| 33 | 5-Cross Arms holding clamps |
| 34 | 6-F Clamps |
| 35 | 7-LT shackle insulator |
| 36 | 8-33 KV cross arm. |
| 37 | 9-33 KV pin with nut |
| 38 | 10-33 KV pin insulator |
| 39 | Retightening of Stay rod. Etc. complete. |
| 40 | Providingfixing of stay rod with nuzzling etc. complete. |
| 41 | Earthing of PCC/RS Joist/STP as per RESPO norms. |
| 42 | Carriage of old material from pit site to JE store/store center, Mahoba in distance range 0 to 30 km including loading & unloading and proper stacking. |
| 43 | Emedetly Attend to Brack Down Moving of Mobail Trolly of the Distrubustion Transformer JE Store to Work Site& Work Site toJE Store in distance range 0 to 30 Km. as per JE Instraction |
| 44 | Filling of33/11 KV Straight Through. |
| 45 | Fiilling of Cable jointing kit 11 kv/33 kv. |
| 46 | Chopping of tree branches 33 KV Line & 11 KV Line |
| 47 | Repairing/Resagging/New guarding of HT Line with GI wire as per RESPO norms |