| 1 | Pumping Machinery:- Item No.1 :-Providing, erecting and giving test of submersible pump set conforming to IS 8034 and motor conforming to IS 9283, with water proof winding. Pump shall be suitable for various delivery head anddischarge with stainless steel shaft. Motor suitable for working on 415 V ± 10%, 3 Ph, 50 Hz A.C. Supply, with cable guard, thrust carbon/fiber bearing to withstand entire hydraulic thrust. The pump set shall be table for direct coupling, with suitable suction strainer. Pump should havesuitable discharge out let as per manufacturer\"s design. Antithrust stream lined non return valve shall be provided with the pump. 3 m submersible copper conductor cable in single / double run and 2 pairs of suitable size erection clamp 10mm thick shall be provided with each pump. 5.0 Hp Submersible Pump |
| 2 | Item No.2:- Providing & Supplying in standerd lengths Polyethelene pipes confirming to I S 4984 with Necessary jointing materials like mechanical connections I e thred/insert joints/quick relese coupler joint compression filling joint,including all taxes (central &local) transportation and frieght chrges,inspection charges loading/unloading charges,conveyance to the departmental stores/site & stacking the same in closed shade duly protecting from sunrays & rains,etc.complete.63 mm HDPE Pipe 6 KgHDPE 32 mm 6 kg |
| 3 | Item No.3 :- Supplying and erecting flat flexible 3 core PVC sheathed submersible type copper cable. 4 Sq mm 3 Core |
| 4 | Item No.4 :- Supplying and erecting D.O.L. starter to operate squirrel cage induction motor on 400V 3ph H2 with no volt coil and cover Load element with necessary material and conducted to supply etc. complete. |
| 5 | Subwork:- Rising Main:- Item No. 1 :- Excavation for foundation / pipe trenches in earth soils of all types, sand, gravel and soft murum, including removing the excavated material up to a distance of 50 meters and lifts as below, stacking and spreading as directed, normal dewatering, preparing the bed for foundation and excluding backfilling, etc. complete (lift 0 to 1.5 M) |
| 6 | Item No. 2 :- Excavation for foundation / pipe trenches in hard murum including removing the excavated material up to a distance of 50M and lifts as below, stacking and spreading as directed by Engineer-in-charge, normal dewatering, preparing the bed for foundation and excluding backfilling, etc. complete.(lift 0 to 1.5M) |
| 7 | Item No. 3 :- Excavation for foundation / pipe trenches in soft rock and old cement and lime masonry foundation asphalt roadincluding removing the excavated material up to a distance of 50 metersand lifts as below, stackingand spreading as directed by Engineer-in-charge, normal dewatering, preparing the bed for foundation and excluding backfilling, etc. complete (lift upto0 to 1.5 M) |
| 8 | Item No. 4 :- Filling in plinth and floors murum bedding in trenches with approved murum from excavated materials from foundation in 15 cm to 20 cm layers including watering and compaction, etc. complete. |
| 9 | Item No. 5 :-Providing and supplying in standard lengths Polyethelene Pipes, confirming to IS 4984 /14151 / 12786 / 13488 with nesessary jointing material like mechanical connector i. e. thread / insert joint / quick release coupler joint / compression fitting joint or flanged joint excluding coupler/specials, including transportation and freight charges, inspection charges, loading / unloading charges, conveyance to the departmental stores & stacking the same in closed shade duly protecting from sunrays & rains, excluding GST levied by GI & GOM in all respect etc. complete. |
| 10 | Item No. 6 :- Lowering, Laying and Jointing H. D. P. E./ M. D. P. E. pipes in proper position including all specials by compression fitting/electrofusion and butt fusion jointing procedure as per relevent IS Code complete with all materials for jointing procedure like Electrofusion machine, Electric heater/butt fusion welding machine with hydraulic jack, top loading clamp etc. and all labours as directed by engineer in charge as per IS-7634 Part II |
| 11 | Item No. 7 :- Refilling the trenches with available excavated stuff with soft material first over pipeline and then hard material in 15 cm layers with all leads and lifts including consolidation, surcharging etc. complete. |
| 12 | GST 18 % |