| 1 | Structural steel work welded / riveted/ bolted in built up sections, trusses and framed work including cutting hoisting fixing in position including cost of primary coat. (Structure steel to be issued free of cost at NFL Stores), for fencing post, car / scooter sheds, railway gates, doors and other civil relatated job. |
| 2 | a)In tees, angles, flats, plates and channels etc. |
| 3 | Providing and fixing plain Transparent acrylic plastic sheet of approved quality with Silicone compaund.complete (frame work to be paid separately) 3mm thick including scaffoldings for working upto height of 25 meters as per direction of our safety officer / Engineer-in-charge. |
| 4 | Providing and fixing expanded metal 20X60mm strands 3.25mm wide and 1.6 mm thick for windows etc. excluding the cost of beadings / structuralsteel (Str. Steel will be paid separately) including scaffoldings for working upto height of 25 meters as per direction of our safety officer / Engineer-in-charge. |
| 5 | Repair / modification of MS steel doors/ windows /gates/ hinged sliding/ rolling shutters including taking out of shutters ( if required / removing the defects/ undenting/ cutting welding revetting, bolting and providing new hinges of required type/ sheets design complete including end locks for rolling shutters all for smooth running/ operation (structural steel required if any will be issued free of cost at NFL Stores) including scaffoldings for working upto height of 25 meters as per direction of our safety officer / Engineer-in-charge. |
| 6 | Dismantling roofing including ridges, hips valleys and gutters etc. and stacking the material within 50M lead. |
| 7 | a)Asbestos sheet. |
| 8 | Providing and fixing Pre-painted galvalume profile sheets (PPGL) 0.50 mm (+0.05 %) total coated thickness (TCT) with zinc aluminum alloy coating, in yield strength of minimum 550 mpa, as desired by Engineer-in-charge.The sheet shall be fixed using suitable hooks or self drilling / self tapping screws with EPDM seal, complete upto any pitch in horizontal / vertical or curved surfaces, excluding the cost of purlins, rafters and trusses and including cutting to size and shape wherever required. The manufacturers / Brands / Makes of Sheets to be used in this work shall be : Durashine of M/s. TATA, Colouron+ of M/s. JSW or equivalent makes having following specifications: 1) Minimum yield strength of 550 MPa required for roofing work, 2) having AI-Zn alloy coating (55% Aluminium, 43.4% Zinc and 1.6% Silicon. (NOTE: Contractor should note that 70% payment of this item shall be released on the arrival of Sheets at site. Balance 30% payment shall be released after the execution of this item). |
| 9 | Providingand fixing precoated galvanised steel sheet roofing accessories 0.50 mm (+0.05%) total coated thickness, Zinc coating 120 grams per sqm as per IS: 277, in 240 mpa steel grade, 5-7 microns epoxy primer on both side of the sheet and polyester top coat 15-18 microns using self drilling/self tapping screws complete : |
| 10 | a)Ridges plain (500 - 600mm) |
| 11 | b)Gutter .(600 mm over all girth) |
| 12 | c)North light curve (500 - 600mm) |
| 13 | Providing and fixing wind ties of 40x 6 mm flat iron section with suitable self drilling / self tapping screws with EPDM seal or by J or L hooks including scaffoldings for working upto height of 25 meters as per direction of our safety officer / Engineer-in-charge. (Item includes cost of 40 x 6 mm flat iron section). |
| 14 | Providing and fixing double scaffolding system (cup lock type) on the exterior side of building/structure, upto 25 metre height, above ground level, including additional rows of scaffolding in stepped manner as per requirement of site, made with 40mm dia M.S. tube, placed 1.5 metre centre to centre, horizontal & vertical tubes joint with cup & lock system with M.S. Tubes, M.S. tube challis, M.S. clamps and staircase system in the scaffolding for working platform etc. and maintaining it in a serviceable condition for execution of work of cleaning and/ or pointing and/ or applying chemical and removing it thereafter. The scaffolding system shall be stiffened with bracings, runners, connecting with the building etc, wherever required, if feasible, for inspection of work at required locations with essential safety features for the workmen etc., complete as per directions and approval of Engineer-in-charge.Note:- (1) The elevational area of the scaffolding shall be measured for payment purpose. (2) The payment will be made once only for execution of all items for such works. (3) This item is not payable against any above items from 1 to 9 and shall be payable only in case of any unforseen job. |
| 15 | Carriage of Materials by Mechanical Transport including loading,unloading and stacking upto 2 KM - Lime, moorum, building rubbish etc. |
| 16 | Assisting in executing various job un-susceptible to measurement and other work which are not including in any items stated above/ scope of works as per instructions of the Engineer-in-Charge. : |
| 17 | i)For this purpose, contractor has to deploy one Skilled Labour along-with all requisite tools & tackles for one day (For 8:00 hour), which will be treated as one unit of each operation. |
| 18 | ii)For this purpose, contractor has to deploy one Un-skilled Labour along-with all requisite tools & tackles for one day (For 8:00 hour), which will be treated as one unit of each operation. |