| 1 | Dismantling R.C. floor, roof, beams etc. including cutting rods and removing rubbish as directed within a lead of 75 m. including stacking of steel bars. |
| 2 | Dismantlingalltypesofplaincementconcrete works,stackingserviceablematerialsatsiteand removingrubbish asdirected withina leadof 75m.In all floor including roof.upto 150 mm. thick |
| 3 | Dismantling all types of masonry excepting cement concrete plain or reinforced, stacking serviceable materials at site and removing rubbish as directed. |
| 4 | Dismantling artificialstone flooringupto 50 mm. thick by carefully chiselling without damaging the baseandremovingrubbishasdirectedwithina lead of 75 m. In all floor including roof. |
| 5 | Stripping off worn out plaster and raking out joints of walls, celings etc. |
| 6 | Removalofrubbish,earthetc.fromtheworking siteanddisposalofthe samebeyondthe compound,inconformitywiththeMunicipal/ Corporation Rules for such disposal, loading into truckandcleaningthesiteinallrespectasper direction of Engineer in charge |
| 7 | SingleBrickFlatSolingofpickedjhamabricksincludingrammingand dressing bed to proper level and filling joints withlocal sand. |
| 8 | Brick work with 1st class bricks in cement mortar (1:4) In foundation and plinth |
| 9 | 125mm.thickbrickworkwith1stclassbricksincementmortar(1:4)in all floor. |
| 10 | OrdinaryCementconcrete(mix1:2:4)withgradedstonechips(20mm nominal size) excluding shuttering and reinforcement,ifany, in all floor as per relevant IS codes.a) Pakur Variety |
| 11 | Reinforcement for reinforced concrete work inall sorts of structures includingdistributionbars,stirrups,bindersetcinitialstraighteningand removal of loose rust (if necessary), cutting to requisite length, hooking and bendingtocorrectshape,placinginproperpositionandbindingwith16 gaugeblackannealedwireateveryintersection,completeasperdrawing and direction.(a) For works in foundation and upto roof of all floor/upto 4 mI.SAIL/ TATA/RINL |
| 12 | Ordinary Cement concrete (mix 1:1.5:3) with graded stone chips (20 mm nominal size) excluding shuttering and reinforcement |
| 13 | Hire and labour charges for shuttering with centering and necessary staging upto 4 m using approved stout props and thick hard wood planks of approved thickness with required bracing for concrete slabs, beams and columns, lintels curved or straight including fitting, fixing and striking out after completion of works.25 mm to 30 mm thick wooden shuttering as per decision & direction of Engineer-In-Charge. |
| 14 | Plaster (to wall, floor, ceiling etc.) with sand and cement mortar including rounding off or chamfering corners as directed and raking out joints including throating, nosing and drip course, scaffolding/staging where necessary, with sand and cement mortar 1:4, 20 mm thick plaster. |
| 15 | Applying 2 coats of Non-Toxic Acrylic Polymer modified Paint having adhesive & waterproofing properties by mixing in proportion (1 liquid: 4 cementitious material) or as per manufacturer\"s specification for water proofing layer etc. |
| 16 | Neat cement punning about 1.5mm thick in wall, dado, window sill, floor etc. |
| 17 | Supplying&laying20mmdesignerchequeredtilesofany shade andofapprovedquality as per IS:1237:1980laidin patterns as directed in pavement, footpath including necessary underlay25 mm thick average cementmortar(1:3) complete inallrespectwithalllabourandmaterials[usingcement slurry @ 4.4 kg/Sq.m at back side of tiles. |
| 18 | Taking out heavy iron grated door or window (jail pattern or existing) with locking arrangement after cutting out from walls and refixing the same including mending all damages.[Mending charges to be paid separately] |
| 19 | Supplying,fitting & fixing of 2-Track / 3-Track Aluminium sliding Window of all Aluminium sections viz. window frame (top,bottom & side frame), shutter (top, bottom, side & interlock member) made of aluminium alloy extrusions conforming to IS 733-1983 & IS 1285-1975, annodised conforming to IS 1868-1983, fitted with all other accessories viz. PVC roller, EPDM gasket, maruti lock, screws etc. including labour charges for fitting & fixing of aluminium 2-track/3-track sliding window with fixing of glass (excluding cost of glass) all complete as per architectural drawings and direction of Engineer-in-charge. 10-12 Micron thickness Annodizing film Natural white |
| 20 | Supplying bubble free float glass of approved make and brand conforming to IS: 2835-19874mm thick coloured / tinted / smoke glass. |
| 21 | Applying decorative cement based paint of approved quality after preparing the surface including scraping the same thoroughly (plastered or concrete surface) as per manufacturer\"s specification. One coat on new surface. |
| 22 | Scraping of moss, blisters etc. thoroughly from exterior surface of walls necessitating the use of scraper, wire brush etc. |
| 23 | Applying exterior gradeAcrylic primer of approved quality and brand on plastered or concrete surface old or new surface to receive decorative textured (matt finish) or smooth finish acrylic exterior emulsion paint including scraping and preparing the surface thoroughly, complete as per manufacturer\"s specification and as per direction of the EIC.One coat |
| 24 | Protective and Decorative Acrylic exterior emulsion paint of approved quality.The rate includes cost of material, labour, scaffolding and all incidental charges but excluding the cost of primer etc.Two coats.Premium 100% Acrylic Emulsion |
| 25 | Supply of UPVC pipes (B Type) & fittings conforming to IS-13592-1992Single Socketed 3 Meter Length160 mm |
| 26 | Supply of UPVC pipes (B Type) & fittings conforming to IS-13592-1992Bend 87.5 degree - 160mm. Dia |
| 27 | Supply of UPVC pipes (B Type) & fittings conforming to IS-13592-1992Plain Tee - 160 mm. Dia. |
| 28 | Makingonesetofscaffoldingonlyforreplacingglasspanels,painting, uprooting plant and another repairing works of building and S&P works for externalworks onlywith10cm.diabambooasmainposts attherateof1 metre centre to centre and 7.5 cm. dia bamboo ties @ 0.75 metre apart fitting and fixing with necessary coir, nails etc. as per direction of the Engineer-in- charge. (This item shouldbeexecutedonlyafterpriorapprovaloftheEngineer-in- charge). Firstly, one number to be paid and then labour rate for shifting up to further nineteenth (19) times @ 10% each time to be considered. If necessary furtherafter twentytimes oftotaluse,another onenumber newand labour rate for shifting to be considered accordingly.3.90 metre height |
| 29 | Makingonesetofscaffoldingonlyforreplacingglasspanels,painting, uprooting plant and another repairing works of building and S&P works for externalworks onlywith10cm.diabambooasmainposts attherateof1 metre centre to centre and 7.5 cm. dia bamboo ties @ 0.75 metre apart fitting and fixing with necessary coir, nails etc. as per direction of the Engineer-in- charge. (This item shouldbeexecutedonlyafterpriorapprovaloftheEngineer-in- charge). Firstly, one number to be paid and then labour rate for shifting up to further nineteenth (19) times @ 10% each time to be considered. If necessary furtherafter twentytimes oftotaluse,another onenumber newand labour rate for shifting to be considered accordingly.Extra for additional 3.6 height or part thereof |
| 30 | Labour for fitting and fixing U.P.V.C. pipes for above ground work including cost of jointing materials etc. fitting and fixing all necessary specials, cutting pipes, cutting holes in walls or R.C. floor where necessary and mending good all damages excluding the cost of masonry or concrete work, if necessary, but including the cost and fitting and fixing holder bat clamps (any floor) or for underground work including cutting trenches upto 1.5 metre and refilling the same complete as per direction of the Engineer in-charge. (Payment will be made on centre line measurement of the total pipeline including specials. Above Ground. 160mm Dia. |
| 31 | Dismantling H.C.I. pipe with fittings including melting lead caulked joints - 150 mm |