Supply Of Materials For Construction Of Kitchen Room In Premises Of Government Higher Primary Marathi School At Kalakhamba Viillage Of Belagavi Taluka. - Add Hom Of Welding And Grinding Machine 2% On Material-02,Fabricator-01,Add 15% Wastage For Glass-02,A 5.50 Mm Thick Plain Glass,Chrominum Plated Screws.,.,Cleat Angles_,Alluminium Handles - 15 Mm.,.,Alluminium Tower Bolt-20 Cm.,Pvc Beading.01,Rubber Beading For Shutters Beading.,,Nylon Rollers.,.,Aluminium Window Frame Section 1.20 Mm Thick.0,Add Brush, Putty, Sand Paper, Roller At 5% On Cost Of Paint.,,Plastic Emulision Paint 01,Primer,,Water Proofing Cement Paint,.,Painter Class I.,,Ms Flat,.,M.S Rods,,Prepolished Grey /Multy Red/Ruby Red/Black/Hassan Green Granite 20Mmthick,Add For Small Tools And Plants At 1%,Vitrified Tiles 10 Mm Thick 600 X 600, Mm,Add Cutting And Other Wastage 5%,,Mathi/Nandi Wood Planks For Panels 25 Mm Thick,,Mathi/Nandi Wood Scantling,,Add Providing And Removing Scaffolding At 3% On Labour.,,Mason Class I (With Tools).,.,,Add Handling Loading And Unloading At 1% On Material.,,Casurina Poles 100 - 150 Mm.,,Mixer (Concrete Small Used In Culvert.),Burnt Bricks Class 35 (Non Modular).,,Binding Wire,.,Tmt Bars Fe 500,.,Add Handling Loading And Unloading At 2% On Material.,,Casurina Poles 75 - 100 Mm Dia.,Jungle Wood Runners And Plank.,,Silver Oak, Or Equivalent Planks 38 Mm Thick.,,Hom Of Vibrator 0.71 Days.,,Plasticizer / Super Plasticizer.,.,Add Watering Charges At 1 % On Material.,,Mixer (Concrete) - 1 Cum Capacity.,,Portland Cement,.,Coarse Sand (Zone Iii),,Broken Stone Aggregate 12 Mm To 10 Mm Size,,Broken Stone Aggregate 20 Mm Size,