| 1 | Supplying Jhaw / Eucalyptus bullah piles at work site, including dressing and making one end pointed.(iii) 15 cm av. DiameterNote: Diameter of pile to be measured at a distance of 1.5m from the thicker end. |
| 2 | Labour for driving Jhaw / Eucalyptus bullah piles by monkey in all sorts of soil including hoisting and placing piles in position, protecting the pile head with iron ring and cutting and shaping heads before and after driving and including hire and labour for necessary driving appliances and all tackles.iii) 15 cm. Av. DiaNote: 1) Payment to be made on the length driven into the ground. Diameter to be measured at 1.5m. from the thicker end. |
| 3 | Supplying, fitting and fixing with iron nails half split bullah wailing pieces and cross pieces etc. complete with cost of all materials and carriage to site.a) Width of thinner end above 10 cm. and less than 15 cm.(i) Jhaw / Eucalyptus. |
| 4 | Coal tarring with 5% pitch including cost of material and labour complete as per direction of the Engineer-in chargeb) Two Coat |
| 5 | Supplying Nylon cage netting 1 metre x 1 metre x 1 metre size with knot having mesh size 17.5 cm x 17.5 cm constructed with nylon thread (210 x 24) having tensile strength not less than 250 Kg. / sq. cm. including carriage, delivery and stacking at site inclusive of all taxes complete. |
| 6 | Labour charges for dumping and placing in position properly filled in Nylon crates with filled HDPE bags (minimum 22 nos. having capacity 50 kg) with local earth or sand, sewing and tying the crate with nylon wire within a lead of 150 m. and all lifts in river slope or bed by cutting trenches upto 50 cms depth, if necessary, or by boat including cost of hire charges of boat, boatmen and other necessary equipments and also including cost of bags, carriage and charge of filling bags with earth / sand but excluding cost of nylon crate as per direction of the Engineer – in – Charge.NB:- Volume of each earth/ sand filled bags should not be less than 0.0328 m3. Size of Nylon crate is 1metre X 1metre X 1metre.(a) Where boats are not necessary. |
| 7 | Supplying at site High Density Polyethylene (HDPE) bag of size 0.84 m x 0.38 m conforming to BIS : 14252 : 2015 for bank protective works including all cost of cost of transportation on road by all means,including other incidental charges complete.Note: Payment will be made subject to the result of 3rd Party Testing, to be done by the Engineer-in-charge departmentally. |
| 8 | Labour charges for filling HDPE bags with filler materials (earth/sand), machine stitching the open end of the bag with thread as per design and placing the same on slope or dumping from bank within initial lead of 30m and all lifts including carriage and hire charges of all materials and equipments but excluding the cost of filler materials as directed by Engineer-in-Charge (Volume of earth/sand filled bag should not be less than 0.0328 cum). |
| 9 | Extra rate for item no above for each additional lead of 60 metre or part thereof over the initial lead of 30 metre. |
| 10 | Supplying to site empty cement polythene bags (capacity 50kg) in good condition including stacking, incedental charges etc. all complete (capacity 50 kg). |
| 11 | Labour charges for filling empty cement gunny bag / polythene bag (capacity 50 kg) with all kinds of earth (wet or dry), sand or agreegates(stone / brick) and sewing as done in case of cement bags ,(tying with a knot after filling will not be accepted ) , and stacking within a lead of 30 metre as per direction of Engr-in-charge (cost is excluding the cost of any types of filling materials).NB:- Volume of earth/ sand filled bags should not be less than 0.028 cum/ bag. |
| 12 | Extra rate for item no above for each additional lead of 60 metre or part thereof beyond the initial lead of 30 metre. |
| 13 | Dumping in position earth / sand filled gunny / poly bags (capacity 50 kg) within a lead of 30 metre inclusive of all lifts. |
| 14 | Earthwork in excavation in all kinds of soil for making embankments, repairs to the embankment, closing breaches etc. as per profile including supply and transporting the earth by truck or tractor or any other mechanical means on land , including loading, transporting, unloading and stacking with all lifts bothways and head load where necessary and depositing the same on embankments, clannels, filling depressions in requisite profile, levelling as per direction of the Engineer-in-charge within a lead of,B) Beyond 1.00 km and upto 2.00 kmNote : Add extra rate towards compensation for earth for land owned /arranged by the contractor over rate of earthwork for land owned /arranged by the Department and for royalty charges on earth as per latest rate as mentioned in PWD Schedule. The royalty will be paid to the agency on production of necessary documents in support of payment made toward the royalty. During initial payment of bill a deduction as per considered rate may be made. As per PwD schedule compensation charge Rs.25.00 per cum and Royalty charge Rs.18.00 per cum. Final rate = Rs.(227.00+25.00+29.00+5.30) = Rs.286.30 per cum |
| 15 | Earthwork from borrow pits over existing embankment or for repairs to embankment, closing breaches etc. within an initial lead of 30 metre and lift of 1.50 metre including breaking clods and depositing the same in layers not exceeding 25 cm. and rough dressing etc. complete as per profile. |
| 16 | Providing and Laying Reinforced Cement Concrete Pipe NP3 as per Design in Double Row Providing and laying reinforced cement concrete pipe NP3 with spigot socket for culverts on first class bedding of granular material in double row including fixing with cement mortar 1:2 as per Technical Specification Clause 1106 for Rural Roads of MORD.(E) 900 mm dia |
| 17 | Supplying, dressing and stacking at site bamboo pins above 5 cm. diameter and upto 7.5 cm. diameter. (Dia. to be measured at mid length). |
| 18 | Driving bamboo pins in standing or flowing water including scaffolding and driving appliances.(a) Where boats are not necessary. |