Tender For Construction Of Puliya Aur Chamber Nala Both Side And Road At Hospital Chouraha Chapar, Churu-Rajasthan

Department Of Local Bodies has published Tender For Construction Of Puliya Aur Chamber Nala Both Side And Road At Hospital Chouraha Chapar. Submission Date for this Tender is 25-04-2025. Road Work Tenders in Churu Rajasthan. Bidders can get complete Tender details and download the document.




Tender Notice

48804556
Tender For Construction Of Puliya Aur Chamber Nala Both Side And Road At Hospital Chouraha Chapar
Open Tender
NCB
Rajasthan
Churu
25-04-2025

Tender Documents

Tender Details

Tender For Construction Of Puliya Aur Chamber Nala Both Side And Road At Hospital Chouraha Chapar; 1 Dismantling of cement concrete pavement for sewer line and manholes by mechanical means using pneumatic tools, cutting the peripheral edge by CC cutter, breaking to pieces not exceeding 0.02 cum in volume and stock piling at designated locations and disposal of dismantled materials up to a lead of 1000 metres including allowances for any additional dismantling beyond the drawings(measurement for payment to be as per standard drawings), rehandling ofmaterial/earth to complete the task. for pipe line 2 Dismantling of cement concrete pavement for sewer line and manholes by mechanical means using pneumatic tools, cutting the peripheral edge by CC cutter, breaking to pieces not exceeding 0.02 cum in volume and stock piling at designated locations and disposal of dismantled materials up to a lead of 1000 metres including allowances for any additional dismantling beyond the drawings(measurement for payment to be as per standard drawings), rehandling ofmaterial/earth to complete the task. for nala 3 Dismantling of existing structures like culverts, bridges, retaining walls, CC road and other structure comprising of masonry, cement concrete, wood work, steel work, including T&P and scaffolding wherever necessary, sorting the dismantled material, disposal of unserviceable material and stacking the serviceable material with alllifts and lead of 50 metres as directed by Engineer. Prestressed /Reinforced cement concrete with separating, cleaning,straightening and cutting of bars 4 Earth work in excavation for roadway, including trimming bottom and side slopes in accordance with requirement of line, grades and cross sections, including disposal of surplus material with all lift and leadupto 1000 metre as per MoRT&H specification clause 301. In all type of soil for pipe line 5 Earth work in excavation for roadway, including trimming bottom and side slopes in accordance with requirement of line, grades and cross sections, including disposal of surplus material with all lift and leadupto 1000 metre as per MoRT&H specification clause 301. In all type of soil for nala 6 Carriage of Materials by mechanical transport including loading, unloading and stacking :: lead up to 2 km 7 Providing at site, lowering & laying in trenches, aligning & jointing of RCC pipes NP4 class (with s/s ends) IS: 458 - 2003 (amended up to date) marked and pipes from 300 mm and upto 1800 mm manufactured through vertical / vibrated casting process at all depths with Rubber gaskets (EPDM/SBR) for sewer lines as per IS: 5382 (including cost of Rubber gaskets, lubricants) as per drawing, sectional hydro testing of the sewer pipe line (including cost and conveyance of water to site for testing) etc., complete as per specification and / or as directed by Engineer. Note : E/w to be measured and paid separately. Length of pipe shall be measured in between the outer wall of two manholes / Inspection chambers. Pipe in the manhole/inspection chamber’s wall shall deemed to be included in the item of manhole/inspection chamber shall not be payable. 1000 mm internal diameter 8 Providing and laying reinforced cement concrete M15 grade (using mechanical concrete mixer) with 0.4% steel reinforcement) using 20mm graded hard crusher broken stone aggregate, laying in layers of not more than 15cm thick, for bedding having width = outer dia of pipe (Bc) + 200mm or 1.25Bc (whichever is higher), thickness below pipe = 0.25Bc or 100mm (whichever is higher) and haunching = 0.25Bc, for all type of pipes of following sizes, including reinforcement, compaction, curing, form work, etc complete as per drawing and/ or as directed by Engineer..1000 mm internal diameter 9 Reinforcement for R.C.C. work at all levels including straightening, cutting, bending, placing in position and binding all complete.Hot rolled deformed bars 10 Providing and laying in position specified grade of reinforced cement concrete excluding the cost of centring, shuttering, finishing and reinforcement - All work upto plinth level : 1:1:2 (1 cement : 1 coarse sand : 2 graded stone aggregate 20 mmnominal size). (As per design mix) 11 Providing and laying in position cement concrete of specified grade excluding the cost of centring and shuttering - All work upto plinthlevel :1:3:6 (1 Cement : 3 fine/ coarse sand : 6 graded stone aggregate 40 mm nominal size). 12 Providing and laying in position cement concrete of specified grade excluding the cost of centring and shuttering - All work upto plinth level :1:1½:3 (1 Cement : 1½ coarse sand : 3 graded stone aggregate 20 mm nominal size). 13 Providing and laying un-reinforced, dowel jointed, plain cement concrete mix in pavement over a prepared sub base with 43 grade cement, coarse and fine aggregate conforming to IS: 383, maximum size of coarse aggregate not exceeding 25 mm, mixed in a batching and mixing plant as per approved mix design, transported to site, laid with a fixed form or slip form paver, spread, compacted and finished in a continuous operation including provision of contraction,expansion, construction and longitudinal joints, joint filler, separation membrane, sealant primer, joint sealant, debonding strip, dowel bar,tie rod, admixtures as approved, curing compound, finishing to lines and grades complete as per drawing and as per clause 602, 112 ofMoRT&H specification including all material, labour, machinery, lighting, guarding and maintenance of diversion. 14 Centring and shuttering with plywood or steel sheet upto two stories or height upto 7.5 metre above plinth level including strutting, propping etc. and removal of form for : 15 Steel work welded in built up sections/ framed work including cutting, hoisting, fixing in position and applying a priming coat of approvedsteel primer using structural steel etc. as required.In gratings, frames, guard bar, ladder, railings, brackets, gates andsimilar works. 16 Construction of embankment with approved material obtained from borrow pit with all lifts and leads, transporting to site, spreading, grading to required slope and compacting by vibratory roller 8-10 tonne to meet requirement of table 300-2 including cost of compensation for earth taken from private land complete as per MoRT&H specification clause 305. (Lead taken upto 5 km) 17 Brick work with FPS bricks of class designation 75 in superstructure above plinth level upto two stories in all shapes and sizes in :Cement mortar1:6 (1 cement : 6 coarse sand) 18 Cement plastering including T&P, scaffolding, material and complete labpour, including cost of water, curing, racking of joints etc. with 20 mm cement plaster of mix :1:4 (1 cement : 4 fine/ coarse sand)

Key Value

Document Fees
INR 500 /-
EMD
INR 41840.0 /-
Tender Value
INR 20.92 Lakhs /-

Attachment

FileName File Description File Size
Click here to download tender document Tender Documents 0 KB
Click here to download tender document Tender Documents 0 KB
Click here to download tender document Tender Documents 0 KB
Disclaimer :
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.
Tell us about your Product / Services,
We will Find Tenders for you

Copyright © 2025 · All Rights Reserved. Terms of Usage | Privacy Policy

For Tender Information Services Visit : TenderDetail